GATES RANCH -A-

Operated by LEWIS PETRO PROPERTIES, INC. (P-5 499978) in the GATES CATARINA field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 121947District 01Field 34200500CondensateGasSaveExport
Value, all time
$40 k
Jan 1993 – Apr 2006
Value, last 12 filed months
$167
at the published price for each month
Months reported
160
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 5 leases and 5 wells, and the rule below applies to all of them.

Discovered
1975-10-13
as the register files it
Field class
Oil and gas
the register's own label
Between wells
1,320 ft
minimum
From a lease line
660 ft
minimum

A drilling unit in this field needs at least 80 acres.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition104 bbl$2,485
GasProduction13,536 Mcf$37,909
Total$40,394

4,173 Mcf of this lease's gas, across 48 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 28.2114, -99.7719. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

28.21136, -99.77185 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
5,500 ft
1 wells filed one
Completion to plug
24.6 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 5,500 ft.

Completions filed
Sep 1981
1 of 1 wells
Plug dates filed
Apr 2006
1 of 1 wells

Last completion to plug: a median of 24.6 years across the 1 well that filed both dates, with the middle half between 24.6 years and 24.6 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-1273225012235,500 ftSep 1981Apr 2006Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (160)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

160 months

Apr 20060064.397.36$0
Mar 20060056.707.08$0
Feb 20060057.597.75$0
Jan 20060060.598.93$0
Dec 20050054.9413.42$0
Nov 20050054.6910.59$0
Oct 20050058.3413.80$0
Sep 20050061.4512.08$0
Aug 20050061.519.80$0
Jul 20053055.697.84$167
Jun 20050052.337.38$0
May 20050045.226.65$0
Apr 20050049.207.36$0
Mar 20050050.377.15$0
Feb 20050045.226.31$0
Jan 20050043.166.32$0
Dec 20040039.866.75$0
Nov 20040045.286.33$0
Oct 20040049.706.52$0
Sep 20040043.245.28$0
Aug 200401042.375.55$56
Jul 2004013638.286.08$827
Jun 2004014436.106.43$926
May 2004015037.486.49$974
Apr 2004015434.475.86$902
Mar 2004017534.365.53$968
Feb 2004019732.455.51$1,085
Jan 2004019132.036.30$1,203
Dec 2003017030.266.30$1,071
Nov 2003016728.804.60$767
Oct 2003018128.174.76$861
Sep 2003018126.314.75$860
Aug 2003018229.765.13$934
Jul 2003019329.415.17$998
Jun 2003017528.565.98$1,047
May 20031317626.595.97$1,397
Apr 2003019126.675.41$1,033
Mar 2003019931.146.10$1,213
Feb 2003017733.487.93$1,403
Jan 2003018930.315.58$1,055
Dec 2002017926.914.85$869
Nov 2002019424.664.14$803
Oct 2002018726.464.23$791
Sep 2002017627.443.64$640
Aug 2002019525.963.16$617
Jul 2002017324.583.06$530
Jun 2002016423.733.34$547
May 20021615624.663.58$954
Apr 200203323.653.51$116
Mar 200204422.003.10$137
Feb 200205518.222.38$131
Jan 200206117.172.38$145
Dec 200102016.932.36$47
Nov 20010018.072.41$0
Oct 2001354019.782.53$793
Sep 200103324.262.25$74
Aug 200104724.873.05$144
Jul 2001374923.933.20$1,042
Jun 200104624.563.82$176
May 200105525.524.31$237
Apr 200107024.685.34$373
Mar 200106524.545.38$349
Feb 200105927.755.77$340
Jan 200105827.478.40$487
Dec 20000226.889.12$18
Nov 200007932.215.66$447
Oct 200008931.235.15$458
Sep 200007231.875.19$373
Aug 200006829.644.54$309
Jul 200007728.534.09$315
Jun 200006629.304.40$290
May 200004427.263.68$162
Apr 200006524.513.12$203
Mar 200007628.422.86$217
Feb 200007027.622.73$191
Jan 200007725.272.48$191
Dec 199907924.282.42$191
Nov 199906423.192.43$156
Oct 199906520.982.80$182
Sep 199906821.752.62$178
Aug 199908119.262.88$233
Jul 199908317.892.37$197
Jun 199906915.942.36$163
May 199907515.792.32$174
Apr 199908915.102.21$197
Mar 1999010512.471.84$193
Feb 19990879.981.82$158
Jan 1999010210.381.90$194
Dec 19980999.201.77$176
Nov 1998010110.892.19$221
Oct 1998010712.421.97$211
Sep 1998012012.592.08$250
Aug 1998012011.301.91$229
Jul 1998012611.742.24$282
Jun 1998013311.242.24$298
May 1998010512.622.21$232
Apr 1998011213.042.51$281
Mar 199809212.802.31$212
Feb 199806013.952.30$138
Jan 199806714.702.15$144
Dec 199705516.322.41$133
Nov 199707218.193.09$222
Oct 199707919.253.15$249
Sep 199707517.742.95$222
Aug 199707917.862.55$202
Jul 199709017.582.25$202
Jun 199707517.242.26$169
May 199707218.972.31$166
Apr 199706717.882.08$140
Mar 199706718.951.94$130
Feb 199706920.492.21$152
Jan 199707223.483.54$255
Dec 199607323.32$0
Nov 199608021.97$0
Oct 199608923.31$0
Sep 199607622.22$0
Aug 199608420.26$0
Jul 199609419.55$0
Jun 199607418.73$0
May 199608619.43$0
Apr 1996011521.51$0
Mar 1996010919.38$0
Feb 1996011216.98$0
Jan 1996011517.07$0
Dec 1995010117.19$0
Nov 199505716.00$0
Oct 199505615.43$0
Sep 199505816.18$0
Aug 199506615.92$0
Jul 199504515.24$0
Jun 199505416.41$0
May 199506917.56$0
Apr 199508217.73$0
Mar 199509116.44$0
Feb 199507016.58$0
Jan 199506015.92$0
Dec 199406515.03$0
Nov 199406415.90$0
Oct 199406215.58$0
Sep 199407115.29$0
Aug 199406516.13$0
Jul 199408617.56$0
Jun 1994010717.09$0
May 199408915.88$0
Apr 199409214.14$0
Mar 1994010512.46$0
Feb 199409912.50$0
Jan 1994010912.66$0
Dec 1993011512.33$0
Nov 1993010614.49$0
Oct 199309815.85$0
Sep 199309315.03$0
Aug 199309315.66$0
Jul 199308615.46$0
Jun 1993010716.79$0
May 1993011417.68$0
Apr 1993011518.05$0
Mar 1993011218.14$0
Feb 1993010117.90$0
Jan 1993010316.93$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Jul 2005 — as filed, then multipliedworked
Condensate             3 bbl  × $ 55.69 =       $167
Gas                    0 Mcf  × $  7.84 =         $0

────────────────────────────────────────────────────
Month total                                     $167

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 01/G/121947 is the state's own key, not one this site invented.