MOODY

Operated by RIO-TEX, INC. (P-5 712930) in the CAMPANERO (CANYON) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 153603District 01Field 151535002 tax incentive programmesGasSaveExport
Value, all time
$5 k
Nov 1994 – Aug 2002
Value, last 12 filed months
$0
at the published price for each month
Months reported
94
no gaps in the span
Streams
1
gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 28 leases and 28 wells, and the rule below applies to all of them.

Discovered
1973-06-23
as the register files it
Field class
Gas
the register's own label
Between wells
1,867 ft
minimum
From a lease line
933 ft
minimum

A drilling unit in this field needs at least 160 acres. The field rule took effect on 1979-04-09.

The Commission's schedule remark for this field reads: ALLOCATION FORMULA 100% % DELIVERABILITY

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas111995-11-03133443
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
GasProduction9,869 Mcf$5,317
Total$5,317

7,825 Mcf of this lease's gas, across 16 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.1084, -100.2544. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.10841, -100.25438 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
4,028 ft
1 wells filed one
Completion to plug
7.8 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 4,028 ft.

Completions filed
Nov 1994
1 of 1 wells
Plug dates filed
Aug 2002
1 of 1 wells

Last completion to plug: a median of 7.8 years across the 1 well that filed both dates, with the middle half between 7.8 years and 7.8 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-1373118857044,028 ftNov 1994Aug 2002Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (94)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

94 months

Aug 2002025.963.16$0
Jul 2002024.583.06$0
Jun 2002023.733.34$0
May 2002024.663.58$0
Apr 2002023.653.51$0
Mar 2002022.003.10$0
Feb 2002018.222.38$0
Jan 2002017.172.38$0
Dec 2001016.932.36$0
Nov 2001018.072.41$0
Oct 2001019.782.53$0
Sep 2001024.262.25$0
Aug 2001024.873.05$0
Jul 2001023.933.20$0
Jun 2001024.563.82$0
May 2001025.524.31$0
Apr 2001024.685.34$0
Mar 2001024.545.38$0
Feb 2001027.755.77$0
Jan 2001027.478.40$0
Dec 2000026.889.12$0
Nov 2000032.215.66$0
Oct 2000031.235.15$0
Sep 2000031.875.19$0
Aug 2000029.644.54$0
Jul 2000028.534.09$0
Jun 2000029.304.40$0
May 2000027.263.68$0
Apr 2000024.513.12$0
Mar 2000028.422.86$0
Feb 2000027.622.73$0
Jan 2000025.272.48$0
Dec 1999024.282.42$0
Nov 1999023.192.43$0
Oct 1999020.982.80$0
Sep 199914521.752.62$380
Aug 199928619.262.88$822
Jul 1999417.892.37$9
Jun 19998815.942.36$208
May 19998315.792.32$193
Apr 199920815.102.21$459
Mar 19991012.471.84$18
Feb 199909.981.82$0
Jan 1999010.381.90$0
Dec 199809.201.77$0
Nov 1998010.892.19$0
Oct 1998012.421.97$0
Sep 1998012.592.08$0
Aug 1998011.301.91$0
Jul 1998011.742.24$0
Jun 1998011.242.24$0
May 1998012.622.21$0
Apr 1998013.042.51$0
Mar 1998012.802.31$0
Feb 199832613.952.30$750
Jan 199835414.702.15$763
Dec 19978116.322.41$195
Nov 19972218.193.09$68
Oct 1997019.253.15$0
Sep 1997017.742.95$0
Aug 1997017.862.55$0
Jul 1997017.582.25$0
Jun 1997017.242.26$0
May 19973918.972.31$90
Apr 19972517.882.08$52
Mar 1997718.951.94$14
Feb 1997020.492.21$0
Jan 199736623.483.54$1,296
Dec 199663723.32$0
Nov 199612021.97$0
Oct 1996023.31$0
Sep 1996022.22$0
Aug 1996020.26$0
Jul 1996019.55$0
Jun 199632318.73$0
May 199646319.43$0
Apr 199666321.51$0
Mar 199664819.38$0
Feb 199637916.98$0
Jan 199618017.07$0
Dec 199527517.19$0
Nov 199538516.00$0
Oct 199540015.43$0
Sep 199566616.18$0
Aug 19951,20515.92$0
Jul 199564615.24$0
Jun 1995016.41$0
May 1995017.56$0
Apr 1995017.73$0
Mar 1995016.44$0
Feb 1995016.58$0
Jan 199558715.92$0
Dec 199424815.03$0
Nov 1994015.90$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Sep 1999 — as filed, then multipliedworked
Gas                  145 Mcf  × $  2.62 =       $380

────────────────────────────────────────────────────
Month total                                     $380

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 01/G/153603 is the state's own key, not one this site invented.