HOLDSWORTH

Operated by PRIME OPERATING COMPANY (P-5 677770) in the INDIO (OLMOS) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 156079District 01Field 44487333CondensateGasSaveExport
Value, all time
$1.0 M
Sep 1995 – Oct 2001
Value, last 12 filed months
$2 k
at the published price for each month
Months reported
74
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 3 leases and 3 wells, and the rule below applies to all of them.

Discovered
1971-04-11
as the register files it
Field class
Gas
the register's own label
Between wells
933 ft
minimum
From a lease line
660 ft
minimum

A drilling unit in this field needs at least 80 acres.

The Commission's schedule remark for this field reads: ALLOCATION FORMULA PREVIOUSLY BASED ON 100% % DELIVERABILITY.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition72 bbl$1,791
GasProduction654,057 Mcf$1,014,835
Total$1,016,625

250,216 Mcf of this lease's gas, across 13 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 28.7649, -99.6686. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

28.76488, -99.66860 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
3,800 ft
1 wells filed one
Completion to plug
5.9 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 3,800 ft.

Completions filed
Sep 1995
1 of 1 wells
Plug dates filed
Aug 2001
1 of 1 wells

Last completion to plug: a median of 5.9 years across the 1 well that filed both dates, with the middle half between 5.9 years and 5.9 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-5073250713,800 ftSep 1995Aug 2001Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (74)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

74 months

Oct 20010019.782.53$0
Sep 20010024.262.25$0
Aug 200172024.873.05$1,791
Jul 20010023.933.20$0
Jun 20010024.563.82$0
May 20010025.524.31$0
Apr 20010024.685.34$0
Mar 20010024.545.38$0
Feb 20010027.755.77$0
Jan 20010027.478.40$0
Dec 20000026.889.12$0
Nov 20000032.215.66$0
Oct 20000031.235.15$0
Sep 20000031.875.19$0
Aug 20000029.644.54$0
Jul 200007728.534.09$315
Jun 2000062029.304.40$2,726
May 200002,66827.263.68$9,818
Apr 200002,81324.513.12$8,765
Mar 200003,18228.422.86$9,100
Feb 200002,46827.622.73$6,729
Jan 2000030625.272.48$759
Dec 199903,52424.282.42$8,541
Nov 199904,17323.192.43$10,157
Oct 199905,63920.982.80$15,810
Sep 199907,71421.752.62$20,202
Aug 199909,58319.262.88$27,557
Jul 199908,54117.892.37$20,262
Jun 1999010,36615.942.36$24,486
May 199907,77815.792.32$18,053
Apr 199902,08915.102.21$4,613
Mar 1999041912.471.84$770
Feb 199901,7739.981.82$3,223
Jan 1999097910.381.90$1,860
Dec 199802,4179.201.77$4,286
Nov 199802,76110.892.19$6,035
Oct 199802,87912.421.97$5,669
Sep 199803,28712.592.08$6,846
Aug 199802,41111.301.91$4,599
Jul 1998012311.742.24$275
Jun 1998073111.242.24$1,635
May 199807,58812.622.21$16,742
Apr 199809,29813.042.51$23,295
Mar 1998013,29812.802.31$30,711
Feb 1998013,85613.952.30$31,857
Jan 1998014,11314.702.15$30,411
Dec 1997020,85016.322.41$50,271
Nov 1997019,55518.193.09$60,391
Oct 1997022,26419.253.15$70,128
Sep 1997022,52517.742.95$66,559
Aug 1997017,78017.862.55$45,423
Jul 1997021,76717.582.25$48,909
Jun 1997023,93717.242.26$54,031
May 1997021,93418.972.31$50,635
Apr 1997017,17717.882.08$35,776
Mar 1997023,57118.951.94$45,707
Feb 1997021,30120.492.21$46,988
Jan 1997023,70623.483.54$83,912
Dec 1996024,66123.32$0
Nov 1996024,35221.97$0
Oct 1996025,22823.31$0
Sep 1996024,99822.22$0
Aug 1996024,89020.26$0
Jul 1996023,77419.55$0
Jun 1996022,75018.73$0
May 1996023,64219.43$0
Apr 1996023,24421.51$0
Mar 1996021,22319.38$0
Feb 1996011,30416.98$0
Jan 199604817.07$0
Dec 19950017.19$0
Nov 19950016.00$0
Oct 19950015.43$0
Sep 1995010216.18$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Aug 2001 — as filed, then multipliedworked
Condensate            72 bbl  × $ 24.87 =     $1,791
Gas                    0 Mcf  × $  3.05 =         $0

────────────────────────────────────────────────────
Month total                                   $1,791

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 01/G/156079 is the state's own key, not one this site invented.