WHITEHEAD

Operated by CONOCOPHILLIPS COMPANY (P-5 172232) in the VINEGARONE (SWANSON) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 183274District 01Field 93874800GasSaveExport
Value, all time
$1.2 M
May 2001 – Apr 2008
Value, last 12 filed months
$3 k
at the published price for each month
Months reported
84
no gaps in the span
Streams
1
gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 3 leases and 3 wells, and the rule below applies to all of them.

Discovered
1996-07-01
as the register files it
Field class
Gas
the register's own label
Between wells
no field rule filed
From a lease line
no field rule filed

The Commission's schedule remark for this field reads: AOF-1 AND AOF-2 EFFECTIVE 03/01/99.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
GasProduction330,589 Mcf$1,196,129
Total$1,196,129

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.2249, -100.7983. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.22489, -100.79834 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
10,350 ft
1 wells filed one
Completion to plug
6.9 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 10,350 ft.

Completions filed
May 2001
1 of 1 wells
Plug dates filed
Apr 2008
1 of 1 wells

Last completion to plug: a median of 6.9 years across the 1 well that filed both dates, with the middle half between 6.9 years and 6.9 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-46530635310,350 ftMay 2001Apr 2008Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (84)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

84 months

Apr 20080110.3110.45$0
Mar 20080101.909.66$0
Feb 2008592.538.77$44
Jan 20081590.388.21$123
Dec 20072788.337.30$197
Nov 20073091.677.29$219
Oct 20074782.856.92$325
Sep 20076075.846.24$375
Aug 20075169.066.39$326
Jul 20076070.906.39$383
Jun 20078962.007.55$672
May 20074058.747.85$314
Apr 20077759.617.81$601
Mar 200718856.927.30$1,373
Feb 200710055.108.22$822
Jan 200713350.306.73$895
Dec 200617456.656.92$1,204
Nov 200616654.207.62$1,265
Oct 200620654.906.01$1,239
Sep 200625760.085.04$1,295
Aug 200631968.717.34$2,341
Jul 200629969.376.34$1,896
Jun 200628866.286.38$1,839
May 200641066.016.42$2,634
Apr 200653464.397.36$3,931
Mar 200663956.707.08$4,526
Feb 200681557.597.75$6,317
Jan 20061,34760.598.93$12,033
Dec 20051,18854.9413.42$15,938
Nov 200587054.6910.59$9,212
Oct 20051,94358.3413.80$26,805
Sep 200539061.4512.08$4,711
Aug 200555961.519.80$5,476
Jul 200579655.697.84$6,244
Jun 200586852.337.38$6,407
May 20051,02545.226.65$6,817
Apr 20051,31449.207.36$9,672
Mar 20051,62850.377.15$11,648
Feb 20051,62445.226.31$10,251
Jan 20051,16143.166.32$7,340
Dec 20041,46039.866.75$9,857
Nov 20041,89345.286.33$11,983
Oct 20041,81049.706.52$11,792
Sep 20041,81943.245.28$9,611
Aug 20041,86042.375.55$10,324
Jul 20042,15338.286.08$13,099
Jun 20041,74736.106.43$11,238
May 20042,36737.486.49$15,373
Apr 20041,25334.475.86$7,341
Mar 20042,05034.365.53$11,337
Feb 20041,74632.455.51$9,620
Jan 20041,73932.036.30$10,955
Dec 20031,77430.266.30$11,179
Nov 20031,94928.804.60$8,956
Oct 20032,07528.174.76$9,876
Sep 20032,38326.314.75$11,318
Aug 20032,56229.765.13$13,142
Jul 20032,67429.415.17$13,827
Jun 20032,68428.565.98$16,058
May 20032,92826.595.97$17,488
Apr 20032,99526.675.41$16,195
Mar 20033,23331.146.10$19,709
Feb 20032,85633.487.93$22,636
Jan 20033,64030.315.58$20,319
Dec 20023,79126.914.85$18,401
Nov 20023,36924.664.14$13,937
Oct 20023,87026.464.23$16,367
Sep 20024,03927.443.64$14,683
Aug 20023,79325.963.16$12,002
Jul 20023,57924.583.06$10,958
Jun 20024,73023.733.34$15,790
May 20025,08224.663.58$18,214
Apr 20025,16923.653.51$18,155
Mar 20025,57022.003.10$17,282
Feb 20025,39418.222.38$12,814
Jan 20026,13517.172.38$14,575
Dec 20016,73116.932.36$15,915
Nov 2001145,07118.072.41$348,971
Oct 20017,19119.782.53$18,185
Sep 20017,51924.262.25$16,928
Aug 20018,81424.873.05$26,911
Jul 20017,21723.933.20$23,073
Jun 20019,70924.563.82$37,129
May 200110,42425.524.31$44,900

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Feb 2008 — as filed, then multipliedworked
Gas                    5 Mcf  × $  8.77 =        $44

────────────────────────────────────────────────────
Month total                                      $44

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 01/G/183274 is the state's own key, not one this site invented.