KILLAM 299

Operated by LEWIS PETRO PROPERTIES, INC. (P-5 499978) in the ATLEE (OLMOS) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 199650District 01Field 043005002 tax incentive programmesCondensateGasSaveExport
Value, all time
$240 k
Nov 2003 – May 2026
Value, last 12 filed months
$6 k
at the published price for each month
Months reported
271
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 66 leases and 66 wells, and the rule below applies to all of them.

Discovered
1983-10-13
as the register files it
Field class
Oil and gas
the register's own label
Between wells
0 ft
minimum
From a lease line
467 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2013-05-17.

The Commission's schedule remark for this field reads: FORMULA REMAINS SUSPENDED.

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112004-09-14158510
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition733 bbl$41,208
GasProduction30,643 Mcf$198,429
Total$239,637

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 28.1855, -99.3642. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

28.18551, -99.36420 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
7,365 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 7,365 ft.

Completions filed
Nov 2003
1 of 1 wells

1 well

42-28331811117,365 ftNov 2003

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (271)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

271 months

May 2026095106.413.05$289
Apr 202608998.932.87$255
Mar 2026012189.753.15$381
Feb 2026013163.503.75$491
Jan 2026018459.138.00$1,472
Dec 2025018656.664.41$821
Nov 2025017258.593.93$675
Oct 2025018659.383.30$615
Sep 2025016262.743.08$498
Aug 202504863.933.01$145
Jul 20250766.743.32$23
Jun 20250566.483.13$16
May 20250560.553.23$16
Apr 20250562.363.54$18
Mar 20250067.704.27$0
Feb 20250570.884.34$22
Jan 20250074.324.28$0
Dec 20240568.993.12$16
Nov 20240569.052.20$11
Oct 20240071.372.28$0
Sep 20240569.612.36$12
Aug 20240075.632.06$0
Jul 20240579.932.15$11
Jun 20240078.082.63$0
May 20240578.812.20$11
Apr 20240484.451.66$7
Mar 20240080.301.55$0
Feb 20240776.091.78$12
Jan 202401473.023.30$46
Dec 20230771.262.61$18
Nov 20230777.892.81$20
Oct 202301485.443.09$43
Sep 20230689.042.74$16
Aug 20230880.522.67$21
Jul 202306574.852.64$172
Jun 20230568.962.26$11
May 202301170.622.23$25
Apr 20230578.122.24$11
Mar 20230572.852.39$12
Feb 20230975.112.47$22
Jan 20230576.533.39$17
Dec 20220676.415.73$34
Nov 20220685.005.65$34
Oct 20220687.185.86$35
Sep 20220584.888.16$41
Aug 20220594.529.13$46
Jul 202207101.587.54$53
Jun 202204115.097.98$32
May 2022053109.378.43$447
Apr 2022059104.226.84$403
Mar 20220116108.885.08$589
Feb 20220091.054.86$0
Jan 20220081.844.54$0
Dec 20210071.323.90$0
Nov 20210077.435.24$0
Oct 20210079.795.71$0
Sep 20210069.865.35$0
Aug 20210066.024.22$0
Jul 20210070.783.98$0
Jun 20210069.493.38$0
May 20210063.483.02$0
Apr 20210060.362.76$0
Mar 20210061.302.72$0
Feb 20210057.805.55$0
Jan 20210050.412.81$0
Dec 20200044.642.68$0
Nov 20200038.772.71$0
Oct 20200036.972.48$0
Sep 20200437.091.99$8
Aug 202001839.982.39$43
Jul 20200038.371.83$0
Jun 20200034.901.69$0
May 20200016.921.81$0
Apr 20200014.751.80$0
Mar 20200030.341.86$0
Feb 20200049.881.98$0
Jan 20200057.252.09$0
Dec 20190059.012.30$0
Nov 20190055.302.75$0
Oct 20190053.472.42$0
Sep 20190055.052.66$0
Aug 20190053.112.30$0
Jul 20190056.272.46$0
Jun 20190052.782.49$0
May 20190058.482.74$0
Apr 20190062.632.75$0
Mar 20190056.803.06$0
Feb 20190050.852.79$0
Jan 20190046.033.23$0
Dec 20180046.594.19$0
Nov 20180052.934.24$0
Oct 20180061.443.40$0
Sep 20180059.543.11$0
Aug 20180059.403.07$0
Jul 20180065.142.93$0
Jun 20180060.183.08$0
May 20180065.382.90$0
Apr 20180063.842.90$0
Mar 20180061.222.79$0
Feb 20180061.782.77$0
Jan 20180062.874.01$0
Dec 20170057.272.92$0
Nov 20170055.423.12$0
Oct 20170049.292.98$0
Sep 20170047.523.09$0
Aug 20170045.373.00$0
Jul 20170043.873.09$0
Jun 20170042.493.09$0
May 20170045.373.26$0
Apr 20170047.933.21$0
Mar 20170046.772.98$0
Feb 20170050.452.95$0
Jan 20170049.413.42$0
Dec 20160048.763.72$0
Nov 20160042.492.64$0
Oct 20160046.193.09$0
Sep 20160041.553.10$0
Aug 20160041.442.92$0
Jul 20160041.622.92$0
Jun 20160045.352.69$0
May 20160042.521.99$0
Apr 20160036.561.99$0
Mar 20160033.011.79$0
Feb 20160026.472.06$0
Jan 20160027.352.36$0
Dec 20150032.362.00$0
Nov 20150038.792.17$0
Oct 201501343.552.43$32
Sep 20150542.992.76$14
Aug 201504040.162.87$115
Jul 201503148.152.95$91
Jun 20150656.152.88$17
May 20150055.212.96$0
Apr 201501849.822.71$49
Mar 20150042.892.93$0
Feb 201511244.662.98$80
Jan 20150043.433.10$0
Dec 20140054.693.59$0
Nov 20140470.464.25$17
Oct 20140578.303.90$20
Sep 201401386.164.05$53
Aug 201401289.394.04$48
Jul 2014242296.564.18$2,409
Jun 201406698.164.74$313
May 201403194.734.73$147
Apr 20140795.944.81$34
Mar 201401195.895.06$56
Feb 201401697.406.19$99
Jan 201402590.404.86$122
Dec 201301991.824.35$83
Nov 201305988.853.74$221
Oct 201301797.423.78$64
Sep 2013033104.113.72$123
Aug 2013021104.253.52$74
Jul 2013040102.523.72$149
Jun 201301294.403.93$47
May 201301794.834.15$71
Apr 201301193.964.28$47
Mar 201304093.623.91$157
Feb 20130991.233.42$31
Jan 201301191.603.42$38
Dec 201201886.773.42$62
Nov 201206486.953.62$232
Oct 201205389.383.40$180
Sep 201206694.672.92$193
Aug 201205692.662.91$163
Jul 201207585.133.02$227
Jun 201206779.822.52$169
May 201202491.612.49$60
Apr 2012030101.652.00$60
Mar 2012026105.052.22$58
Feb 2012039101.102.57$100
Jan 201207998.092.73$216
Dec 201105096.873.24$162
Nov 201106195.723.31$202
Oct 2011011284.983.65$409
Sep 201105583.623.99$219
Aug 201102683.404.15$108
Jul 201106094.144.52$271
Jun 201107392.904.64$339
May 201105598.134.40$242
Apr 2011056105.964.33$243
Mar 201108096.364.06$325
Feb 201108785.644.18$364
Jan 201107586.504.59$344
Dec 201008785.734.35$378
Nov 201008780.843.80$330
Oct 201008778.103.51$305
Sep 2010010372.633.98$410
Aug 2010010673.684.42$468
Jul 2010017372.554.74$819
Jun 201008270.364.91$403
May 2010267871.124.24$2,179
Apr 201008581.694.12$350
Mar 201009678.394.39$421
Feb 201009173.585.44$495
Jan 201009774.365.96$579
Dec 200908671.445.48$472
Nov 2009012574.593.75$469
Oct 200909972.544.11$407
Sep 200909565.543.06$291
Aug 2009010167.423.22$325
Jul 2009013661.133.46$471
Jun 2009018866.163.90$732
May 2009014654.743.93$573
Apr 2009013446.773.59$481
Mar 2009015442.144.06$625
Feb 2009014132.814.63$653
Jan 2009016135.865.37$865
Dec 2008017637.105.98$1,052
Nov 2008014055.496.86$960
Oct 2008016275.246.92$1,121
Sep 20080156101.767.88$1,229
Aug 20080186114.228.48$1,578
Jul 20082162131.0811.39$2,107
Jun 20080169131.3313.03$2,203
May 20080192123.1711.57$2,222
Apr 20080139110.3110.45$1,453
Mar 20080140101.909.66$1,353
Feb 2008015392.538.77$1,342
Jan 2008016790.388.21$1,370
Dec 2007015888.337.30$1,154
Nov 2007017991.677.29$1,305
Oct 2007018482.856.92$1,274
Sep 2007017675.846.24$1,099
Aug 2007020369.066.39$1,297
Jul 2007019470.906.39$1,239
Jun 2007020662.007.55$1,555
May 2007023558.747.85$1,844
Apr 2007024359.617.81$1,897
Mar 2007022156.927.30$1,614
Feb 2007025255.108.22$2,070
Jan 2007026950.306.73$1,810
Dec 20068027856.656.92$6,455
Nov 20063428754.207.62$4,029
Oct 2006035454.906.01$2,129
Sep 2006035060.085.04$1,763
Aug 2006032568.717.34$2,385
Jul 2006031369.376.34$1,985
Jun 2006029166.286.38$1,858
May 20064933266.016.42$5,368
Apr 2006027764.397.36$2,039
Mar 200610829756.707.08$8,227
Feb 2006030857.597.75$2,387
Jan 2006036960.598.93$3,296
Dec 200511750054.9413.42$13,136
Nov 2005042454.6910.59$4,489
Oct 20059936458.3413.80$10,797
Sep 20059454261.4512.08$12,323
Aug 2005050161.519.80$4,908
Jul 2005051955.697.84$4,071
Jun 2005042252.337.38$3,115
May 2005042345.226.65$2,813
Apr 2005041849.207.36$3,077
Mar 2005045150.377.15$3,227
Feb 2005032745.226.31$2,064
Jan 2005040843.166.32$2,579
Dec 2004040339.866.75$2,721
Nov 2004043245.286.33$2,735
Oct 2004048749.706.52$3,173
Sep 2004050743.245.28$2,679
Aug 2004061942.375.55$3,436
Jul 2004055538.286.08$3,377
Jun 2004063236.106.43$4,066
May 2004068337.486.49$4,436
Apr 2004080534.475.86$4,716
Mar 2004866734.365.53$3,963
Feb 20041365532.455.51$4,031
Jan 20041479832.036.30$5,476
Dec 2003231,29330.266.30$8,844
Nov 2003411,92728.804.60$10,036

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                   95 Mcf  × $  3.05 =       $289

────────────────────────────────────────────────────
Month total                                     $289

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 01/G/199650 is the state's own key, not one this site invented.