MILLS TRUST "19"

Operated by DAWSON ENERGY, LLC (P-5 103891) in the PANDALE (CANYON SAND) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 203274District 01Field 688043002 tax incentive programmesGasSaveExport
Value, all time
$340 k
Apr 2004 – May 2026
Value, last 12 filed months
$2 k
at the published price for each month
Months reported
266
no gaps in the span
Streams
1
gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 23 leases and 23 wells, and the rule below applies to all of them.

Discovered
1975-12-28
as the register files it
Field class
Gas
the register's own label
Between wells
no field rule filed
From a lease line
no field rule filed

The Commission's schedule remark for this field reads: AOF-1 AND AOF-2 EFFECTIVE 06/01/2000.

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112004-10-01158842
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
GasProduction48,618 Mcf$339,747
Total$339,747

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.2200, -101.6041. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.21998, -101.60408 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
4,436 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 4,436 ft.

1 well

42-4653070764,436 ft

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (266)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

266 months

May 202645106.413.05$137
Apr 20265698.932.87$161
Mar 20265689.753.15$176
Feb 20264463.503.75$165
Jan 20263559.138.00$280
Dec 20251456.664.41$62
Nov 20253658.593.93$141
Oct 20251059.383.30$33
Sep 20253862.743.08$117
Aug 20254463.933.01$133
Jul 20254266.743.32$139
Jun 20254166.483.13$128
May 20252360.553.23$74
Apr 20253362.363.54$117
Mar 20253367.704.27$141
Feb 2025770.884.34$30
Jan 2025774.324.28$30
Dec 20241268.993.12$37
Nov 2024769.052.20$15
Oct 2024071.372.28$0
Sep 2024169.612.36$2
Aug 2024175.632.06$2
Jul 2024279.932.15$4
Jun 2024478.082.63$11
May 2024278.812.20$4
Apr 2024284.451.66$3
Mar 2024280.301.55$3
Feb 2024176.091.78$2
Jan 2024373.023.30$10
Dec 2023471.262.61$10
Nov 2023177.892.81$3
Oct 2023185.443.09$3
Sep 2023289.042.74$5
Aug 2023380.522.67$8
Jul 2023274.852.64$5
Jun 2023268.962.26$5
May 2023570.622.23$11
Apr 2023878.122.24$18
Mar 2023972.852.39$22
Feb 2023575.112.47$12
Jan 2023376.533.39$10
Dec 2022676.415.73$34
Nov 2022685.005.65$34
Oct 2022787.185.86$41
Sep 2022984.888.16$73
Aug 20221994.529.13$173
Jul 20224101.587.54$30
Jun 20226115.097.98$48
May 202211109.378.43$93
Apr 202214104.226.84$96
Mar 20229108.885.08$46
Feb 2022391.054.86$15
Jan 2022881.844.54$36
Dec 2021371.323.90$12
Nov 2021477.435.24$21
Oct 2021679.795.71$34
Sep 2021369.865.35$16
Aug 2021066.024.22$0
Jul 2021070.783.98$0
Jun 2021069.493.38$0
May 2021163.483.02$3
Apr 2021260.362.76$6
Mar 2021361.302.72$8
Feb 2021257.805.55$11
Jan 2021350.412.81$8
Dec 2020444.642.68$11
Nov 2020638.772.71$16
Oct 2020636.972.48$15
Sep 2020337.091.99$6
Aug 2020239.982.39$5
Jul 2020238.371.83$4
Jun 2020134.901.69$2
May 2020116.921.81$2
Apr 2020014.751.80$0
Mar 2020230.341.86$4
Feb 2020449.881.98$8
Jan 2020557.252.09$10
Dec 2019559.012.30$12
Nov 20191755.302.75$47
Oct 20191753.472.42$41
Sep 20191755.052.66$45
Aug 2019653.112.30$14
Jul 2019956.272.46$22
Jun 20191952.782.49$47
May 2019358.482.74$8
Apr 2019462.632.75$11
Mar 20191856.803.06$55
Feb 20191250.852.79$34
Jan 20192146.033.23$68
Dec 2018346.594.19$13
Nov 2018352.934.24$13
Oct 20181761.443.40$58
Sep 20182359.543.11$71
Aug 20181659.403.07$49
Jul 20182165.142.93$62
Jun 20182260.183.08$68
May 20183065.382.90$87
Apr 20182763.842.90$78
Mar 20181261.222.79$33
Feb 20182461.782.77$66
Jan 20181762.874.01$68
Dec 20171757.272.92$50
Nov 20171655.423.12$50
Oct 20172049.292.98$60
Sep 20172947.523.09$90
Aug 2017045.373.00$0
Jul 20171043.873.09$31
Jun 20171842.493.09$56
May 20173545.373.26$114
Apr 20171947.933.21$61
Mar 20172246.772.98$66
Feb 20172250.452.95$65
Jan 20172649.413.42$89
Dec 20162248.763.72$82
Nov 20162042.492.64$53
Oct 20162946.193.09$90
Sep 20162041.553.10$62
Aug 20162241.442.92$64
Jul 20162541.622.92$73
Jun 20162245.352.69$59
May 20162142.521.99$42
Apr 20162036.561.99$40
Mar 20162233.011.79$39
Feb 20162226.472.06$45
Jan 20162327.352.36$54
Dec 20152032.362.00$40
Nov 20152638.792.17$56
Oct 20152543.552.43$61
Sep 20152642.992.76$72
Aug 20152340.162.87$66
Jul 20153148.152.95$91
Jun 20153056.152.88$86
May 20152855.212.96$83
Apr 20152949.822.71$78
Mar 20153342.892.93$97
Feb 20152644.662.98$77
Jan 20152943.433.10$90
Dec 20142154.693.59$75
Nov 20142170.464.25$89
Oct 20142278.303.90$86
Sep 20142186.164.05$85
Aug 20142289.394.04$89
Jul 2014096.564.18$0
Jun 20141898.164.74$85
May 20141994.734.73$90
Apr 20141995.944.81$91
Mar 20142295.895.06$111
Feb 20142097.406.19$124
Jan 20142490.404.86$117
Dec 20132591.824.35$109
Nov 20132388.853.74$86
Oct 20132497.423.78$91
Sep 201325104.113.72$93
Aug 201328104.253.52$99
Jul 201319102.523.72$71
Jun 20132594.403.93$98
May 20133594.834.15$145
Apr 20134393.964.28$184
Mar 20133993.623.91$153
Feb 20134991.233.42$168
Jan 20135791.603.42$195
Dec 201210386.773.42$352
Nov 20129986.953.62$359
Oct 201210189.383.40$343
Sep 20129794.672.92$283
Aug 20124092.662.91$116
Jul 20125685.133.02$169
Jun 20126079.822.52$151
May 20126091.612.49$149
Apr 201255101.652.00$110
Mar 201257105.052.22$127
Feb 201257101.102.57$147
Jan 20126398.092.73$172
Dec 20116196.873.24$198
Nov 20115795.723.31$189
Oct 20115984.983.65$215
Sep 20115083.623.99$199
Aug 20115283.404.15$216
Jul 20115294.144.52$235
Jun 20116192.904.64$283
May 20116098.134.40$264
Apr 201162105.964.33$269
Mar 20117996.364.06$321
Feb 20117585.644.18$314
Jan 20114586.504.59$207
Dec 20101785.734.35$74
Nov 20101280.843.80$46
Oct 20106778.103.51$235
Sep 201046172.633.98$1,835
Aug 201045273.684.42$1,998
Jul 201046372.554.74$2,193
Jun 201044770.364.91$2,195
May 201039871.124.24$1,686
Apr 201038081.694.12$1,567
Mar 201040178.394.39$1,760
Feb 201036373.585.44$1,976
Jan 201044474.365.96$2,648
Dec 200941971.445.48$2,298
Nov 200943974.593.75$1,647
Oct 200943572.544.11$1,788
Sep 200947065.543.06$1,440
Aug 200944467.423.22$1,429
Jul 200944561.133.46$1,542
Jun 200952966.163.90$2,060
May 200956154.743.93$2,202
Apr 200958046.773.59$2,081
Mar 200953742.144.06$2,180
Feb 200951032.814.63$2,363
Jan 200960735.865.37$3,260
Dec 200861837.105.98$3,694
Nov 200862255.496.86$4,267
Oct 200863375.246.92$4,382
Sep 2008633101.767.88$4,986
Aug 2008685114.228.48$5,811
Jul 2008627131.0811.39$7,141
Jun 2008606131.3313.03$7,898
May 2008454123.1711.57$5,255
Apr 2008115110.3110.45$1,202
Mar 20084101.909.66$39
Feb 20081092.538.77$88
Jan 20089890.388.21$804
Dec 2007888.337.30$58
Nov 20071291.677.29$88
Oct 2007882.856.92$55
Sep 20071275.846.24$75
Aug 20071269.066.39$77
Jul 20071170.906.39$70
Jun 20071462.007.55$106
May 20075858.747.85$455
Apr 200717559.617.81$1,366
Mar 200766656.927.30$4,863
Feb 200738055.108.22$3,122
Jan 200753650.306.73$3,606
Dec 200667956.656.92$4,698
Nov 200683354.207.62$6,345
Oct 2006754.906.01$42
Sep 200650160.085.04$2,524
Aug 200681568.717.34$5,982
Jul 200664669.376.34$4,097
Jun 200666666.286.38$4,252
May 200680166.016.42$5,146
Apr 200684564.397.36$6,220
Mar 20061,00456.707.08$7,111
Feb 200682657.597.75$6,402
Jan 200696560.598.93$8,621
Dec 20051,11154.9413.42$14,905
Nov 20051,16154.6910.59$12,293
Oct 20051,33058.3413.80$18,348
Sep 20051,41461.4512.08$17,080
Aug 20051,78061.519.80$17,438
Jul 20052,04855.697.84$16,064
Jun 20052,56352.337.38$18,918
May 20051,33245.226.65$8,859
Apr 2005049.207.36$0
Mar 2005050.377.15$0
Feb 2005045.226.31$0
Jan 2005043.166.32$0
Dec 200432739.866.75$2,208
Nov 200440745.286.33$2,576
Oct 200455349.706.52$3,603
Sep 200468843.245.28$3,635
Aug 200471942.375.55$3,991
Jul 200482438.286.08$5,013
Jun 200473736.106.43$4,741
May 200486337.486.49$5,605
Apr 20041,11134.475.86$6,509

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Gas                   45 Mcf  × $  3.05 =       $137

────────────────────────────────────────────────────
Month total                                     $137

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 01/G/203274 is the state's own key, not one this site invented.