BRACKEN ET AL

Operated by VARAS ENERGY OPERATING COMPANY, (P-5 102824) in the A.W.P. (OLMOS) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 210837District 01Field 002565002 tax incentive programmesCondensateGasSaveExport
Value, all time
$235 k
Jun 2005 – May 2026
Value, last 12 filed months
$1 k
at the published price for each month
Months reported
252
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 821 leases and 1,336 wells, and the rule below applies to all of them.

Discovered
1981-12-20
as the register files it
Field class
Oil and gas
the register's own label
Between wells
0 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 20 acres. The field rule took effect on 2015-01-27.

The Commission's schedule remark for this field reads: RED. THE ALLOCATION FORMULA REMAINS SUSPENDED.

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112006-01-17166587
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition1,827 bbl$140,294
GasProduction15,400 Mcf$94,964
Total$235,258

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 28.4587, -98.4704. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

28.45867, -98.47039 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
9,680 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 9,680 ft.

Completions filed
Jun 2005
1 of 1 wells

1 well

42-31133786889,680 ftJun 2005

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (252)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

252 months

May 20260156106.413.05$475
Apr 2026015498.932.87$442
Mar 202604789.753.15$148
Feb 20260063.503.75$0
Jan 20260059.138.00$0
Dec 20250056.664.41$0
Nov 202501958.593.93$75
Oct 20250059.383.30$0
Sep 202503562.743.08$108
Aug 20250063.933.01$0
Jul 20250066.743.32$0
Jun 20250066.483.13$0
May 20250060.553.23$0
Apr 20250062.363.54$0
Mar 20250067.704.27$0
Feb 20250070.884.34$0
Jan 20250074.324.28$0
Dec 20240068.993.12$0
Nov 20240669.052.20$13
Oct 20240571.372.28$11
Sep 20240669.612.36$14
Aug 20240075.632.06$0
Jul 20240079.932.15$0
Jun 20240078.082.63$0
May 20240078.812.20$0
Apr 20240084.451.66$0
Mar 20240080.301.55$0
Feb 20240076.091.78$0
Jan 20240073.023.30$0
Dec 20230271.262.61$5
Nov 20230177.892.81$3
Oct 20230185.443.09$3
Sep 20230189.042.74$3
Aug 20230180.522.67$3
Jul 20230174.852.64$3
Jun 20230368.962.26$7
May 20230170.622.23$2
Apr 20230278.122.24$4
Mar 20230172.852.39$2
Feb 20230175.112.47$2
Jan 2023016476.533.39$556
Dec 20220276.415.73$11
Nov 20220185.005.65$6
Oct 20220187.185.86$6
Sep 20220284.888.16$16
Aug 20220294.529.13$18
Jul 202206101.587.54$45
Jun 202202115.097.98$16
May 202202109.378.43$17
Apr 202202104.226.84$14
Mar 202202108.885.08$10
Feb 20220291.054.86$10
Jan 20220281.844.54$9
Dec 20210271.323.90$8
Nov 20210277.435.24$10
Oct 20210279.795.71$11
Sep 20210269.865.35$11
Aug 20210266.024.22$8
Jul 20210270.783.98$8
Jun 202107569.493.38$254
May 20210263.483.02$6
Apr 20210660.362.76$17
Mar 20210161.302.72$3
Feb 20210157.805.55$6
Jan 20210150.412.81$3
Dec 20200144.642.68$3
Nov 20200138.772.71$3
Oct 20200136.972.48$2
Sep 20200137.091.99$2
Aug 20200139.982.39$2
Jul 20200138.371.83$2
Jun 20200134.901.69$2
May 20200016.921.81$0
Apr 20200114.751.80$2
Mar 20200130.341.86$2
Feb 20200249.881.98$4
Jan 20200257.252.09$4
Dec 20190159.012.30$2
Nov 20190155.302.75$3
Oct 20190153.472.42$2
Sep 20190155.052.66$3
Aug 20190153.112.30$2
Jul 20190456.272.46$10
Jun 20190252.782.49$5
May 20190258.482.74$5
Apr 20190562.632.75$14
Mar 20190056.803.06$0
Feb 201902950.852.79$81
Jan 201902746.033.23$87
Dec 201801946.594.19$80
Nov 201822352.934.24$203
Oct 201852061.443.40$375
Sep 201842659.543.11$319
Aug 201822259.403.07$186
Jul 2018332065.142.93$2,208
Jun 2018722660.183.08$4,413
May 2018762565.382.90$5,041
Apr 2018482363.842.90$3,131
Mar 201822261.222.79$184
Feb 20182361.782.77$132
Jan 20182262.874.01$134
Dec 20172157.272.92$117
Nov 20172255.423.12$117
Oct 20172149.292.98$102
Sep 20171047.523.09$48
Aug 20172745.373.00$112
Jul 20173643.873.09$150
Jun 201741042.493.09$201
May 20172445.373.26$104
Apr 20171047.933.21$48
Mar 20172946.772.98$120
Feb 20173750.452.95$172
Jan 201741449.413.42$246
Dec 20162848.763.72$127
Nov 201621242.492.64$117
Oct 201621046.193.09$123
Sep 20161041.553.10$42
Aug 201621141.442.92$115
Jul 201631241.622.92$160
Jun 201621245.352.69$123
May 20160042.521.99$0
Apr 20162536.561.99$83
Mar 201611733.011.79$64
Feb 20161026.472.06$26
Jan 201641827.352.36$152
Dec 201531132.362.00$119
Nov 201521238.792.17$104
Oct 201531143.552.43$157
Sep 201531142.992.76$159
Aug 201521240.162.87$115
Jul 20150048.152.95$0
Jun 20150056.152.88$0
May 20150055.212.96$0
Apr 20150049.822.71$0
Mar 20150042.892.93$0
Feb 20151044.662.98$45
Jan 201521743.433.10$140
Dec 20140054.693.59$0
Nov 20140070.464.25$0
Oct 20140078.303.90$0
Sep 20140086.164.05$0
Aug 20140089.394.04$0
Jul 20147096.564.18$676
Jun 20141919898.164.74$2,803
May 20143094.734.73$284
Apr 201454495.944.81$691
Mar 20140095.895.06$0
Feb 20140097.406.19$0
Jan 20140090.404.86$0
Dec 20131091.824.35$92
Nov 201333388.853.74$390
Oct 20131097.423.78$97
Sep 2013330104.113.72$424
Aug 201300104.253.52$0
Jul 201300102.523.72$0
Jun 20134094.403.93$378
May 201395094.834.15$1,061
Apr 201331193.964.28$329
Mar 201351993.623.91$542
Feb 201331091.233.42$308
Jan 20133591.603.42$292
Dec 201262586.773.42$606
Nov 201252086.953.62$507
Oct 20124089.383.40$358
Sep 201283694.672.92$862
Aug 201251792.662.91$513
Jul 201253085.133.02$516
Jun 201251979.822.52$447
May 201252191.612.49$510
Apr 201200101.652.00$0
Mar 201219105.052.22$125
Feb 2012112101.102.57$132
Jan 201232098.092.73$349
Dec 2011911996.873.24$1,257
Nov 20111114495.723.31$1,530
Oct 2011109784.983.65$1,204
Sep 20111113983.623.99$1,474
Aug 20111214383.404.15$1,594
Jul 20111616794.144.52$2,261
Jun 2011911592.904.64$1,370
May 20111011098.134.40$1,466
Apr 201120176105.964.33$2,882
Mar 20112014696.364.06$2,520
Feb 20111911285.644.18$2,095
Jan 20111811986.504.59$2,103
Dec 20102619285.734.35$3,064
Nov 20102018180.843.80$2,304
Oct 201075678.103.51$743
Sep 20102519572.633.98$2,592
Aug 20102220873.684.42$2,540
Jul 20102515472.554.74$2,543
Jun 20102920470.364.91$3,042
May 20102825271.124.24$3,059
Apr 201021381.694.12$217
Mar 2010911678.394.39$1,215
Feb 201048273.585.44$741
Jan 201049874.365.96$882
Dec 20091071.445.48$71
Nov 20091916074.593.75$2,017
Oct 2009128372.544.11$1,212
Sep 20092317965.543.06$2,056
Aug 2009158367.423.22$1,278
Jul 20091913161.133.46$1,615
Jun 20092315866.163.90$2,137
May 20091514954.743.93$1,406
Apr 20091319146.773.59$1,293
Mar 20091219042.144.06$1,277
Feb 20091114932.814.63$1,051
Jan 20091617735.865.37$1,524
Dec 2008911937.105.98$1,045
Nov 20081615855.496.86$1,972
Oct 2008138975.246.92$1,594
Sep 200817104101.767.88$2,549
Aug 200835284114.228.48$6,407
Jul 200837248131.0811.39$7,675
Jun 200830202131.3313.03$6,572
May 200840279123.1711.57$8,156
Apr 200833215110.3110.45$5,888
Mar 200843372101.909.66$7,977
Feb 20083528292.538.77$5,712
Jan 20083427090.388.21$5,288
Dec 20073022588.337.30$4,293
Nov 20074347091.677.29$7,369
Oct 20072824482.856.92$4,009
Sep 20072929575.846.24$4,041
Aug 20074637969.066.39$5,598
Jul 20073537570.906.39$4,877
Jun 20075243062.007.55$6,470
May 20073336758.747.85$4,818
Apr 20073030159.617.81$4,138
Mar 20071312556.927.30$1,653
Feb 20071819755.108.22$2,610
Jan 20072222250.306.73$2,600
Dec 20061818156.656.92$2,272
Nov 20061919554.207.62$2,515
Oct 20063333054.906.01$3,796
Sep 20061415460.085.04$1,617
Aug 2006522868.717.34$2,017
Jul 2006311169.376.34$912
Jun 2006313066.286.38$1,029
May 2006313866.016.42$1,085
Apr 2006310264.397.36$944
Mar 200639956.707.08$871
Feb 2006310557.597.75$987
Jan 200639960.598.93$1,066
Dec 200524454.9413.42$700
Nov 200533654.6910.59$545
Oct 200525558.3413.80$875
Sep 200538561.4512.08$1,211
Aug 200535861.519.80$753
Jul 2005711255.697.84$1,268
Jun 20050052.337.38$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                  156 Mcf  × $  3.05 =       $475

────────────────────────────────────────────────────
Month total                                     $475

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 01/G/210837 is the state's own key, not one this site invented.