KILLAM 299

Operated by LEWIS PETRO PROPERTIES, INC. (P-5 499978) in the ATLEE (OLMOS) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 211576District 01Field 043005002 tax incentive programmesCondensateGasSaveExport
Value, all time
$2.3 M
Jul 2005 – May 2026
Value, last 12 filed months
$981
at the published price for each month
Months reported
251
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 66 leases and 66 wells, and the rule below applies to all of them.

Discovered
1983-10-13
as the register files it
Field class
Oil and gas
the register's own label
Between wells
0 ft
minimum
From a lease line
467 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2013-05-17.

The Commission's schedule remark for this field reads: FORMULA REMAINS SUSPENDED.

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112006-08-14168833
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition109 bbl$9,495
GasProduction290,767 Mcf$2,324,550
Total$2,334,046

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 28.1805, -99.3734. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

28.18050, -99.37342 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
7,250 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 7,250 ft.

Completions filed
Jul 2005
1 of 1 wells

1 well

42-2833189387,250 ftJul 2005

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (251)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

251 months

May 202600106.413.05$0
Apr 20260598.932.87$14
Mar 20260089.753.15$0
Feb 202602263.503.75$83
Jan 202601959.138.00$152
Dec 202502956.664.41$128
Nov 202502458.593.93$94
Oct 202503659.383.30$119
Sep 202503462.743.08$105
Aug 202502263.933.01$66
Jul 202503966.743.32$129
Jun 202502966.483.13$91
May 202504760.553.23$152
Apr 20250562.363.54$18
Mar 20250067.704.27$0
Feb 20250070.884.34$0
Jan 202503874.324.28$163
Dec 20240068.993.12$0
Nov 202404169.052.20$90
Oct 20240071.372.28$0
Sep 202402469.612.36$57
Aug 20240075.632.06$0
Jul 202404079.932.15$86
Jun 20240078.082.63$0
May 202405878.812.20$128
Apr 20240484.451.66$7
Mar 20240080.301.55$0
Feb 202401076.091.78$18
Jan 20240073.023.30$0
Dec 202304371.262.61$112
Nov 20230577.892.81$14
Oct 20230085.443.09$0
Sep 20230989.042.74$25
Aug 202301380.522.67$35
Jul 20230074.852.64$0
Jun 20230068.962.26$0
May 202302770.622.23$60
Apr 202303678.122.24$81
Mar 20230072.852.39$0
Feb 202301275.112.47$30
Jan 202301376.533.39$44
Dec 202201576.415.73$86
Nov 202204285.005.65$237
Oct 202201487.185.86$82
Sep 202202084.888.16$163
Aug 202203494.529.13$310
Jul 2022041101.587.54$309
Jun 2022053115.097.98$423
May 2022064109.378.43$540
Apr 2022060104.226.84$410
Mar 2022090108.885.08$457
Feb 202204891.054.86$233
Jan 2022012581.844.54$567
Dec 2021013771.323.90$534
Nov 2021013677.435.24$712
Oct 2021017779.795.71$1,011
Sep 2021015769.865.35$840
Aug 2021016766.024.22$705
Jul 2021015570.783.98$617
Jun 2021018869.493.38$636
May 2021017563.483.02$528
Apr 2021018260.362.76$502
Mar 2021019461.302.72$527
Feb 2021014857.805.55$821
Jan 2021016950.412.81$475
Dec 2020016344.642.68$436
Nov 2020016438.772.71$444
Oct 2020015436.972.48$382
Sep 2020015437.091.99$307
Aug 2020014439.982.39$343
Jul 20200038.371.83$0
Jun 202002934.901.69$49
May 202002516.921.81$45
Apr 20200014.751.80$0
Mar 20200030.341.86$0
Feb 2020019049.881.98$376
Jan 2020011657.252.09$243
Dec 201906159.012.30$141
Nov 201903355.302.75$91
Oct 2019014953.472.42$360
Sep 2019011255.052.66$298
Aug 2019010853.112.30$249
Jul 2019012156.272.46$298
Jun 2019015552.782.49$386
May 2019015258.482.74$417
Apr 2019020362.632.75$558
Mar 2019021456.803.06$655
Feb 2019020750.852.79$578
Jan 2019023846.033.23$768
Dec 2018023946.594.19$1,000
Nov 2018013152.934.24$555
Oct 2018013661.443.40$462
Sep 2018011959.543.11$370
Aug 2018012059.403.07$368
Jul 2018014165.142.93$413
Jun 2018012360.183.08$378
May 2018012565.382.90$363
Apr 2018012463.842.90$360
Mar 2018014061.222.79$390
Feb 2018010061.782.77$277
Jan 2018011862.874.01$473
Dec 2017010457.272.92$304
Nov 201709255.423.12$287
Oct 201709249.292.98$275
Sep 2017010947.523.09$337
Aug 201708445.373.00$252
Jul 201707043.873.09$216
Jun 201707642.493.09$235
May 201709845.373.26$320
Apr 2017010647.933.21$340
Mar 2017011046.772.98$328
Feb 2017011450.452.95$337
Jan 2017012149.413.42$414
Dec 2016010448.763.72$387
Nov 2016012342.492.64$325
Oct 2016012846.193.09$396
Sep 2016015041.553.10$465
Aug 2016031341.442.92$915
Jul 2016011341.622.92$330
Jun 2016015645.352.69$419
May 2016019442.521.99$386
Apr 2016025036.561.99$498
Mar 2016024433.011.79$438
Feb 2016017426.472.06$359
Jan 201608727.352.36$206
Dec 2015012332.362.00$246
Nov 2015014838.792.17$321
Oct 2015012443.552.43$301
Sep 2015012942.992.76$356
Aug 2015021540.162.87$618
Jul 2015019548.152.95$574
Jun 2015037356.152.88$1,075
May 2015039355.212.96$1,161
Apr 2015040449.822.71$1,093
Mar 2015033142.892.93$971
Feb 201507744.662.98$229
Jan 201504743.433.10$146
Dec 201404854.693.59$172
Nov 201406270.464.25$264
Oct 201408278.303.90$320
Sep 201406986.164.05$279
Aug 2014010389.394.04$416
Jul 2014104096.564.18$1,133
Jun 201404598.164.74$213
May 201405994.734.73$279
Apr 201407095.944.81$337
Mar 201405795.895.06$288
Feb 201406997.406.19$427
Jan 201408990.404.86$433
Dec 201304891.824.35$209
Nov 201306588.853.74$243
Oct 2013011797.423.78$442
Sep 20130112104.113.72$416
Aug 20130125104.253.52$440
Jul 20130106102.523.72$394
Jun 2013012494.403.93$488
May 2013011294.834.15$465
Apr 2013010093.964.28$428
Mar 201309893.623.91$383
Feb 201307191.233.42$243
Jan 201308891.603.42$301
Dec 2012010486.773.42$356
Nov 2012013286.953.62$478
Oct 2012011889.383.40$401
Sep 2012012294.672.92$356
Aug 2012010692.662.91$308
Jul 2012034185.133.02$1,030
Jun 2012027679.822.52$695
May 201206791.612.49$167
Apr 2012075101.652.00$150
Mar 2012091105.052.22$202
Feb 2012093101.102.57$239
Jan 2012011398.092.73$309
Dec 2011037796.873.24$1,221
Nov 2011024395.723.31$805
Oct 2011050284.983.65$1,832
Sep 2011036983.623.99$1,471
Aug 2011065583.404.15$2,718
Jul 2011068194.144.52$3,076
Jun 2011055692.904.64$2,580
May 2011064898.134.40$2,854
Apr 20110750105.964.33$3,250
Mar 2011093796.364.06$3,802
Feb 2011042085.644.18$1,756
Jan 2011082486.504.59$3,781
Dec 2010092785.734.35$4,030
Nov 2010078680.843.80$2,983
Oct 2010098678.103.51$3,460
Sep 2010088472.633.98$3,518
Aug 2010095273.684.42$4,207
Jul 2010062972.554.74$2,979
Jun 2010059670.364.91$2,927
May 2010085071.124.24$3,600
Apr 2010095281.694.12$3,925
Mar 2010080678.394.39$3,537
Feb 2010052473.585.44$2,852
Jan 2010056774.365.96$3,382
Dec 2009075271.445.48$4,124
Nov 2009089674.593.75$3,361
Oct 2009092472.544.11$3,798
Sep 2009085565.543.06$2,620
Aug 2009074767.423.22$2,404
Jul 200901,00261.133.46$3,471
Jun 200901,06466.163.90$4,144
May 200901,20254.743.93$4,719
Apr 200901,32246.773.59$4,743
Mar 200901,22342.144.06$4,964
Feb 200901,34332.814.63$6,222
Jan 200901,60535.865.37$8,620
Dec 200801,55737.105.98$9,306
Nov 200801,68455.496.86$11,553
Oct 200801,94375.246.92$13,449
Sep 200801,859101.767.88$14,644
Aug 200802,029114.228.48$17,212
Jul 2008351,838131.0811.39$25,522
Jun 200802,194131.3313.03$28,594
May 200802,661123.1711.57$30,799
Apr 200802,107110.3110.45$22,028
Mar 200802,562101.909.66$24,759
Feb 200802,20592.538.77$19,339
Jan 200802,44290.388.21$20,038
Dec 200702,84888.337.30$20,796
Nov 200703,02491.677.29$22,050
Oct 200702,98182.856.92$20,634
Sep 200703,17075.846.24$19,794
Aug 200702,77169.066.39$17,701
Jul 200703,86470.906.39$24,683
Jun 200703,60462.007.55$27,205
May 200703,59858.747.85$28,231
Apr 200704,30659.617.81$33,609
Mar 200704,75956.927.30$34,750
Feb 200704,01155.108.22$32,954
Jan 200705,14950.306.73$34,637
Dec 2006105,87656.656.92$41,219
Nov 200606,47954.207.62$49,354
Oct 200606,94054.906.01$41,736
Sep 200606,94860.085.04$34,998
Aug 200607,05068.717.34$51,746
Jul 200607,74469.376.34$49,118
Jun 2006327,67366.286.38$51,104
May 200609,01466.016.42$57,915
Apr 200609,29764.397.36$68,430
Mar 2006010,87456.707.08$77,020
Feb 2006010,65257.597.75$82,565
Jan 2006013,49860.598.93$120,582
Dec 20051514,07754.9413.42$189,673
Nov 2005014,11054.6910.59$149,402
Oct 2005015,74458.3413.80$217,200
Sep 2005715,23061.4512.08$184,393
Aug 2005012,49761.519.80$122,431
Jul 200501,39155.697.84$10,911

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Apr 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $ 98.93 =         $0
Gas                    5 Mcf  × $  2.87 =        $14

────────────────────────────────────────────────────
Month total                                      $14

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 01/G/211576 is the state's own key, not one this site invented.