KINCAID A

Operated by DAWSON ENERGY, LLC (P-5 103891) in the WILL O. (WOLFCAMP) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 212890District 01Field 97474700GasSaveExport
Value, all time
$35 k
Oct 2005 – May 2026
Value, last 12 filed months
$109
at the published price for each month
Months reported
248
no gaps in the span
Streams
1
gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 14 leases and 14 wells, and the rule below applies to all of them.

Discovered
1978-01-01
as the register files it
Field class
Gas
the register's own label
Between wells
1,200 ft
minimum
From a lease line
467 ft
minimum

A drilling unit in this field needs at least 40 acres.

The Commission's schedule remark for this field reads: AOF-1 AND AOF-2 EFFECTIVE 05/01/2008.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
GasProduction6,916 Mcf$34,872
Total$34,872

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.2777, -101.4007. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.27765, -101.40067 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
4,700 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 4,700 ft.

Completions filed
Oct 2005
1 of 1 wells

1 well

42-4653077870124,700 ftOct 2005

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (248)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

248 months

May 20261106.413.05$3
Apr 2026198.932.87$3
Mar 2026089.753.15$0
Feb 2026163.503.75$4
Jan 2026059.138.00$0
Dec 2025156.664.41$4
Nov 2025158.593.93$4
Oct 2025659.383.30$20
Sep 2025262.743.08$6
Aug 20251163.933.01$33
Jul 2025566.743.32$17
Jun 2025566.483.13$16
May 20251060.553.23$32
Apr 20251062.363.54$35
Mar 2025367.704.27$13
Feb 20251070.884.34$43
Jan 20251074.324.28$43
Dec 20241068.993.12$31
Nov 20241469.052.20$31
Oct 20241471.372.28$32
Sep 2024269.612.36$5
Aug 2024075.632.06$0
Jul 2024279.932.15$4
Jun 2024378.082.63$8
May 20241478.812.20$31
Apr 2024084.451.66$0
Mar 2024880.301.55$12
Feb 2024876.091.78$14
Jan 20242173.023.30$69
Dec 20232171.262.61$55
Nov 20232577.892.81$70
Oct 20231985.443.09$59
Sep 2023789.042.74$19
Aug 20234080.522.67$107
Jul 20234074.852.64$106
Jun 20231868.962.26$41
May 20231770.622.23$38
Apr 20231378.122.24$29
Mar 20232372.852.39$55
Feb 20232375.112.47$57
Jan 20232176.533.39$71
Dec 20221776.415.73$97
Nov 20221985.005.65$107
Oct 20222987.185.86$170
Sep 20221784.888.16$139
Aug 20221794.529.13$155
Jul 202239101.587.54$294
Jun 202221115.097.98$168
May 202285109.378.43$717
Apr 202296104.226.84$656
Mar 202272108.885.08$366
Feb 20223991.054.86$189
Jan 20226181.844.54$277
Dec 20216071.323.90$234
Nov 20215677.435.24$293
Oct 20216279.795.71$354
Sep 20213969.865.35$209
Aug 20215066.024.22$211
Jul 20213770.783.98$147
Jun 20212669.493.38$88
May 20211063.483.02$30
Apr 20211560.362.76$41
Mar 20211061.302.72$27
Feb 2021957.805.55$50
Jan 20211550.412.81$42
Dec 20202144.642.68$56
Nov 2020238.772.71$5
Oct 20201836.972.48$45
Sep 2020837.091.99$16
Aug 2020339.982.39$7
Jul 2020138.371.83$2
Jun 2020134.901.69$2
May 2020116.921.81$2
Apr 2020914.751.80$16
Mar 20201130.341.86$20
Feb 20201149.881.98$22
Jan 2020857.252.09$17
Dec 20191659.012.30$37
Nov 20191955.302.75$52
Oct 20191853.472.42$44
Sep 20192955.052.66$77
Aug 20191953.112.30$44
Jul 20191456.272.46$34
Jun 20192752.782.49$67
May 20193358.482.74$90
Apr 20193062.632.75$83
Mar 20193156.803.06$95
Feb 20192450.852.79$67
Jan 2019546.033.23$16
Dec 2018246.594.19$8
Nov 2018352.934.24$13
Oct 2018761.443.40$24
Sep 2018759.543.11$22
Aug 2018459.403.07$12
Jul 2018065.142.93$0
Jun 2018460.183.08$12
May 2018365.382.90$9
Apr 20181263.842.90$35
Mar 2018961.222.79$25
Feb 2018761.782.77$19
Jan 20181562.874.01$60
Dec 2017257.272.92$6
Nov 2017455.423.12$12
Oct 20171549.292.98$45
Sep 20171547.523.09$46
Aug 20171745.373.00$51
Jul 2017843.873.09$25
Jun 20172442.493.09$74
May 20172345.373.26$75
Apr 20172247.933.21$71
Mar 20171246.772.98$36
Feb 20173150.452.95$92
Jan 20173449.413.42$116
Dec 20163548.763.72$130
Nov 20163842.492.64$100
Oct 20163746.193.09$114
Sep 20162041.553.10$62
Aug 20162341.442.92$67
Jul 20162041.622.92$58
Jun 201611045.352.69$295
May 201611042.521.99$219
Apr 20164536.561.99$90
Mar 20165033.011.79$90
Feb 20163226.472.06$66
Jan 20162527.352.36$59
Dec 20154432.362.00$88
Nov 20155638.792.17$121
Oct 20153243.552.43$78
Sep 20154242.992.76$116
Aug 20154040.162.87$115
Jul 20154548.152.95$133
Jun 20154256.152.88$121
May 20156155.212.96$180
Apr 20157049.822.71$189
Mar 20158042.892.93$235
Feb 201566844.662.98$1,988
Jan 201543743.433.10$1,355
Dec 201416954.693.59$607
Nov 2014070.464.25$0
Oct 2014078.303.90$0
Sep 2014086.164.05$0
Aug 2014089.394.04$0
Jul 2014096.564.18$0
Jun 2014098.164.74$0
May 2014094.734.73$0
Apr 2014095.944.81$0
Mar 2014095.895.06$0
Feb 2014097.406.19$0
Jan 2014090.404.86$0
Dec 2013091.824.35$0
Nov 2013088.853.74$0
Oct 2013097.423.78$0
Sep 20130104.113.72$0
Aug 20130104.253.52$0
Jul 20130102.523.72$0
Jun 2013094.403.93$0
May 2013094.834.15$0
Apr 2013093.964.28$0
Mar 2013093.623.91$0
Feb 2013091.233.42$0
Jan 2013091.603.42$0
Dec 2012086.773.42$0
Nov 2012086.953.62$0
Oct 2012089.383.40$0
Sep 2012094.672.92$0
Aug 2012092.662.91$0
Jul 2012085.133.02$0
Jun 2012079.822.52$0
May 2012091.612.49$0
Apr 20120101.652.00$0
Mar 20120105.052.22$0
Feb 20120101.102.57$0
Jan 2012098.092.73$0
Dec 2011096.873.24$0
Nov 2011095.723.31$0
Oct 2011084.983.65$0
Sep 2011083.623.99$0
Aug 2011083.404.15$0
Jul 2011094.144.52$0
Jun 2011092.904.64$0
May 2011098.134.40$0
Apr 20110105.964.33$0
Mar 2011096.364.06$0
Feb 2011085.644.18$0
Jan 2011086.504.59$0
Dec 2010085.734.35$0
Nov 2010080.843.80$0
Oct 2010078.103.51$0
Sep 2010072.633.98$0
Aug 2010073.684.42$0
Jul 2010072.554.74$0
Jun 2010070.364.91$0
May 2010071.124.24$0
Apr 2010081.694.12$0
Mar 2010078.394.39$0
Feb 2010073.585.44$0
Jan 2010074.365.96$0
Dec 2009071.445.48$0
Nov 2009074.593.75$0
Oct 2009072.544.11$0
Sep 2009065.543.06$0
Aug 2009067.423.22$0
Jul 2009061.133.46$0
Jun 2009066.163.90$0
May 20096654.743.93$259
Apr 200912446.773.59$445
Mar 200910542.144.06$426
Feb 200910732.814.63$496
Jan 200910235.865.37$548
Dec 20089337.105.98$556
Nov 20087655.496.86$521
Oct 200812975.246.92$893
Sep 2008121101.767.88$953
Aug 2008124114.228.48$1,052
Jul 2008133131.0811.39$1,515
Jun 2008134131.3313.03$1,746
May 2008135123.1711.57$1,563
Apr 2008115110.3110.45$1,202
Mar 2008116101.909.66$1,121
Feb 200811892.538.77$1,035
Jan 200812990.388.21$1,059
Dec 200710588.337.30$767
Nov 20078091.677.29$583
Oct 20079482.856.92$651
Sep 20078475.846.24$525
Aug 20077069.066.39$447
Jul 20078970.906.39$569
Jun 200715662.007.55$1,178
May 2007058.747.85$0
Apr 2007059.617.81$0
Mar 2007056.927.30$0
Feb 2007055.108.22$0
Jan 2007050.306.73$0
Dec 2006056.656.92$0
Nov 2006054.207.62$0
Oct 2006054.906.01$0
Sep 2006060.085.04$0
Aug 2006068.717.34$0
Jul 2006069.376.34$0
Jun 2006066.286.38$0
May 2006066.016.42$0
Apr 2006064.397.36$0
Mar 2006056.707.08$0
Feb 2006057.597.75$0
Jan 2006060.598.93$0
Dec 2005054.9413.42$0
Nov 2005054.6910.59$0
Oct 2005058.3413.80$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Gas                    1 Mcf  × $  3.05 =         $3

────────────────────────────────────────────────────
Month total                                       $3

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 01/G/212890 is the state's own key, not one this site invented.