PALOMA

Operated by NEWFIELD EXPLORATION COMPANY (P-5 606617) in the CHITTIM (GEORGETOWN) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 263375District 01Field 17876249CondensateGasSaveExport
Value, all time
$72 k
Jun 2011 – Aug 2014
Value, last 12 filed months
$6 k
at the published price for each month
Months reported
39
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 28 leases and 45 wells, and the rule below applies to all of them.

Discovered
1972-11-08
as the register files it
Field class
Oil and gas
the register's own label
Between wells
1,200 ft
minimum
From a lease line
467 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2005-09-12.

The Commission's schedule remark for this field reads: EXEMPT FIELD EFFECTIVE 6/1/97.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition62 bbl$5,744
GasProduction18,682 Mcf$65,811
Total$71,556

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 28.9467, -100.3859. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

28.94668, -100.38595 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
2,539 ft
1 wells filed one
Completion to plug
3.2 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 2,539 ft.

Completions filed
Jun 2011
1 of 1 wells
Plug dates filed
Aug 2014
1 of 1 wells

Last completion to plug: a median of 3.2 years across the 1 well that filed both dates, with the middle half between 3.2 years and 3.2 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-323333886701H2,539 ftJun 2011Aug 2014Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (39)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

39 months

Aug 20140089.394.04$0
Jul 20140096.564.18$0
Jun 20140098.164.74$0
May 20140094.734.73$0
Apr 20140095.944.81$0
Mar 20140095.895.06$0
Feb 20140097.406.19$0
Jan 20140090.404.86$0
Dec 2013123591.824.35$1,115
Nov 2013126288.853.74$1,068
Oct 2013230997.423.78$1,363
Sep 20130568104.113.72$2,112
Aug 20130596104.253.52$2,099
Jul 20130354102.523.72$1,316
Jun 2013025194.403.93$987
May 2013043494.834.15$1,801
Apr 2013033893.964.28$1,448
Mar 2013035093.623.91$1,370
Feb 2013029491.233.42$1,005
Jan 20131832991.603.42$2,774
Dec 2012053286.773.42$1,820
Nov 2012069086.953.62$2,501
Oct 2012045289.383.40$1,537
Sep 2012066794.672.92$1,947
Aug 2012059192.662.91$1,719
Jul 2012060785.133.02$1,834
Jun 2012444879.822.52$1,448
May 2012066891.612.49$1,662
Apr 20120586101.652.00$1,170
Mar 20120645105.052.22$1,433
Feb 20120676101.102.57$1,737
Jan 2012080998.092.73$2,212
Dec 2011070796.873.24$2,291
Nov 20112067295.723.31$4,140
Oct 2011075084.983.65$2,736
Sep 2011076583.623.99$3,049
Aug 2011088583.404.15$3,672
Jul 201101,61894.144.52$7,309
Jun 2011161,59492.904.64$8,882

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Dec 2013 — as filed, then multipliedworked
Condensate             1 bbl  × $ 91.82 =        $92
Gas                  235 Mcf  × $  4.35 =     $1,023

────────────────────────────────────────────────────
Month total                                   $1,115

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 01/G/263375 is the state's own key, not one this site invented.