FAITH-BONITA

Operated by CRESCENT ENERGY OPERATING, LLC (P-5 103575) in the BRISCOE RANCH (EAGLEFORD) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 281376District 01Field 12018200CondensateGasSave
Value, all time
$12.1 M
Sep 2016 – May 2026
Value, last 12 filed months
$812 k
at the published price for each month
Months reported
117
no gaps in the span
Streams
2
condensate, gas

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition168,225 bbl$9,398,001
GasProduction819,423 Mcf$2,715,560
Total$12,113,560

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 28.2391, -99.9313. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

28.23913, -99.93130 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
7,045 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 7,045 ft.

Completions filed
Jul 2016
1 of 1 wells

1 well

42-12736137H 7H7,045 ftJul 2016

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (117)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

117 months

May 20262881,599106.413.05$35,516
Apr 20264151,41598.932.87$45,117
Mar 20261,3982,95689.753.15$134,780
Feb 20261,4312,57463.503.75$100,522
Jan 20261,4272,93559.138.00$107,852
Dec 20258352,29056.664.41$57,418
Nov 20258814,84258.593.93$70,630
Oct 20259325,35159.383.30$73,026
Sep 20258262,28462.743.08$58,851
Aug 20254871,67963.933.01$36,196
Jul 20253903,02666.743.32$36,060
Jun 20256553,83766.483.13$55,549
May 20258134,85560.553.23$64,920
Apr 20258322,83362.363.54$61,921
Mar 20258052,39067.704.27$64,700
Feb 20258612,60870.884.34$72,349
Jan 202575919,99074.324.28$141,940
Dec 20244723,00768.993.12$41,949
Nov 20248772,18869.052.20$65,367
Oct 202465655471.372.28$48,083
Sep 202446062769.612.36$33,503
Aug 20247901,47075.632.06$62,781
Jul 202487582879.932.15$71,716
Jun 20244331,67878.082.63$38,228
May 20247033,62478.812.20$63,371
Apr 20246771,21884.451.66$59,194
Mar 20245572,09380.301.55$47,961
Feb 20246382,40076.091.78$52,826
Jan 20248774,22873.023.30$77,981
Dec 20236613,16471.262.61$55,363
Nov 202329277477.892.81$24,917
Oct 20236814,27785.443.09$71,389
Sep 20237703,97389.042.74$79,427
Aug 20239306,01880.522.67$90,969
Jul 20234672,11674.852.64$40,545
Jun 20237586,60468.962.26$67,187
May 20232961,86670.622.23$25,060
Apr 20232851,39578.122.24$25,386
Mar 20231,1054,74772.852.39$91,860
Feb 20239893,60675.112.47$83,175
Jan 20238664,24876.533.39$80,666
Dec 20221,0674,64676.415.73$108,147
Nov 20228295,74585.005.65$102,902
Oct 20228862,99487.185.86$94,798
Sep 20221,1657,91484.888.16$163,493
Aug 20221,3729,72394.529.13$218,425
Jul 2022671,496101.587.54$18,089
Jun 202257524115.097.98$10,740
May 2022168233109.378.43$20,339
Apr 2022194187104.226.84$21,497
Mar 20228323,255108.885.08$107,112
Feb 20221,0795,28991.054.86$123,941
Jan 20226651,56881.844.54$61,539
Dec 20219071.323.90$642
Nov 20216022,07677.435.24$57,485
Oct 20219584,46479.795.71$101,946
Sep 20211,2475,10269.865.35$114,416
Aug 20211,5154,48966.024.22$118,967
Jul 20211,0326,67670.783.98$99,629
Jun 20217485,33869.493.38$70,024
May 20219816,05663.483.02$80,549
Apr 20211,1794,37760.362.76$83,238
Mar 202164445061.302.72$40,700
Feb 20212752,73357.805.55$31,058
Jan 20211,0277,09750.412.81$71,716
Dec 20201,0384,79344.642.68$59,160
Nov 20206781,97138.772.71$31,621
Oct 20201,4863,26836.972.48$63,037
Sep 20201,5915,16837.091.99$69,300
Aug 20207852,13139.982.39$36,467
Jul 20208182,61238.371.83$36,154
Jun 20206173,64534.901.69$27,694
May 20201016.921.81$17
Apr 20203922,03414.751.80$9,452
Mar 20201592,40630.341.86$9,290
Feb 20208644,79149.881.98$52,586
Jan 20201,2667,30757.252.09$87,785
Dec 20191,3276,51259.012.30$93,312
Nov 20196388,60155.302.75$58,940
Oct 20191,0958,47753.472.42$79,052
Sep 20195616,15755.052.66$47,244
Aug 20191,0757,20153.112.30$73,687
Jul 20191,2838,32556.272.46$92,674
Jun 20191,4498,78252.782.49$98,356
May 20191,4507,74458.482.74$106,017
Apr 20191,0975,50962.632.75$83,859
Mar 20191,0663,83356.803.06$72,286
Feb 20191,5294,13050.852.79$89,282
Jan 20191,4737,07446.033.23$90,638
Dec 20181,1374,51046.594.19$71,849
Nov 20181,1944,51952.934.24$82,347
Oct 20181,5723,31061.443.40$107,831
Sep 20181,2153,36659.543.11$82,803
Aug 20181,3673,08359.403.07$90,654
Jul 20181,3843,46365.142.93$100,307
Jun 20181,2723,62560.183.08$87,703
May 20181,0113,83965.382.90$77,235
Apr 20189771,62063.842.90$67,071
Mar 20181,2172,95761.222.79$82,745
Feb 20186632,78161.782.77$48,653
Jan 20181,4148,01762.874.01$121,041
Dec 20171,7369,79057.272.92$128,022
Nov 20171,6369,20355.423.12$119,365
Oct 20172,12813,40249.292.98$144,876
Sep 20172,11616,73047.523.09$152,203
Aug 20172,19617,78645.373.00$153,069
Jul 20172,34419,77543.873.09$163,882
Jun 20173,04921,74742.493.09$196,691
May 20174,03925,81545.373.26$267,494
Apr 20173,92223,47647.933.21$263,377
Mar 20175,03028,97446.772.98$321,702
Feb 20175,21931,52750.452.95$356,385
Jan 20176,11835,74649.413.42$424,499
Dec 20167,65043,50948.763.72$534,991
Nov 20169,22440,72242.492.64$499,611
Oct 201612,32648,21146.193.09$718,322
Sep 201612,58338,85041.553.10$643,283

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate           288 bbl  × $106.41 =    $30,646
Gas                1,599 Mcf  × $  3.05 =     $4,870

────────────────────────────────────────────────────
Month total                                  $35,516

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 01/G/281376 is the state's own key, not one this site invented.