BRISCOE G

Operated by SM ENERGY COMPANY (P-5 788997) in the LORENZO (AUSTIN CHALK) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 295686District 01Field 54928500Hydrogen sulphide fieldCondensateGasSaveExport
Value, all time
$10.9 M
Aug 2021 – May 2026
Value, last 12 filed months
$652 k
at the published price for each month
Months reported
57
1 month not filed
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 484 leases and 599 wells, and the rule below applies to all of them.

Discovered
2009-10-26
as the register files it
Field class
Oil and gas
the register's own label
Between wells
0 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2023-08-22.

The register flags this field for hydrogen sulphide. That is a poisonous gas that occurs naturally in some formations. The flag is a property of the field as the Commission records it. It is not a measurement taken at this lease, and it is not a statement that gas is escaping anywhere.

The Commission's schedule remark for this field reads: A UFT FIELD. FIELD GETS UFT ALLOWABLE, EFFECTIVE 08-22-2023

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition117,158 bbl$9,286,587
GasProduction347,620 Mcf$1,643,988
Total$10,930,575

Every month this lease reported (57)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

57 months

May 202600106.413.05$0
Apr 20266464,00198.932.87$75,391
Mar 20268023,41789.753.15$82,741
Feb 20266572,84563.503.75$52,389
Jan 20268743,72459.138.00$81,464
Dec 202584252556.664.41$50,025
Nov 202572830958.593.93$43,867
Oct 202588240259.383.30$53,702
Sep 20257643,03462.743.08$57,269
Aug 20257174,14863.933.01$58,343
Jul 20255203,74166.743.32$47,107
Jun 20256142,85266.483.13$49,742
May 20251,0883,43160.553.23$76,968
Apr 20251,0883,49162.363.54$80,217
Mar 20258512,45867.704.27$68,104
Feb 20259782,70570.884.34$81,063
Jan 20251,2263,92874.324.28$107,923
Dec 20241,2294,44668.993.12$98,666
Nov 20241,1444,24169.052.20$88,317
Oct 20241,2844,42871.372.28$101,741
Sep 20241,2724,18969.612.36$98,448
Aug 20241,1734,47375.632.06$97,945
Jul 20241,1184,16679.932.15$98,304
Jun 20241,2364,44478.082.63$108,212
May 20244572,43378.812.20$41,365
Apr 20241,0883,69784.451.66$98,016
Mar 20241,3013,83180.301.55$110,390
Feb 20241,2663,19076.091.78$102,020
Jan 20241,4033,78773.023.30$114,935
Dec 20231,6934,68271.262.61$132,867
Nov 20231,8033,39277.892.81$149,959
Oct 20231,6373,43685.443.09$150,473
Sep 20231,7493,92489.042.74$166,463
Aug 20231,6474,33280.522.67$144,195
Jul 20231,6544,73774.852.64$136,316
Jun 20239054,67168.962.26$72,958
May 20231,0863,11570.622.23$83,632
Apr 20231,5353,71578.122.24$128,227
Mar 20231,5363,66772.852.39$120,673
Feb 20231,4342,91775.112.47$114,900
Jan 20231,4453,27376.533.39$121,674
Dec 20221,4176,48276.415.73$145,409
Nov 20221,3626,53485.005.65$152,662
Oct 20222,1257,89987.185.86$231,575
Sep 20222,2549,62184.888.16$269,862
Aug 20222,70711,49894.529.13$360,810
Jul 20222,37811,774101.587.54$330,358
Jun 20222,46511,454115.097.98$375,068
May 20221,8136,135109.378.43$250,025
Apr 20221,8596,583104.226.84$238,757
Mar 20223,89016,501108.885.08$507,309
Feb 20223,76018,59091.054.86$432,674
Dec 20218,07520,61871.323.90$656,301
Nov 202110,16525,03377.435.24$918,170
Oct 202112,53523,19379.795.71$1,132,689
Sep 202112,92723,98569.865.35$1,031,422
Aug 20212,0543,52366.024.22$150,474

Not filed, and not zero: Jan 2022. The Railroad Commission holds no report for those months, so this page shows none — a zero would state that the lease produced nothing.

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Apr 2026 — as filed, then multipliedworked
Condensate           646 bbl  × $ 98.93 =    $63,909
Gas                4,001 Mcf  × $  2.87 =    $11,482

────────────────────────────────────────────────────
Month total                                  $75,391

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 01/G/295686 is the state's own key, not one this site invented.