BRISCOE RANCH

Operated by ST. MARY LAND & EXPLORATION CO. (P-5 810874) in the CATARINA, SW. (OLMOS) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 62024District 01Field 16340500CondensateGasSaveExport
Value, all time
$43 k
Jan 1993 – Jan 2008
Value, last 12 filed months
$0
at the published price for each month
Months reported
181
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 213 leases and 214 wells, and the rule below applies to all of them.

Discovered
1973-12-28
as the register files it
Field class
Oil and gas
the register's own label
Between wells
1,200 ft
minimum
From a lease line
467 ft
minimum

A drilling unit in this field needs at least 80 acres.

The Commission's schedule remark for this field reads: OPTIONAL 80 ACRE UNIT MAX DIAG 4000

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition8 bbl$138
GasProduction37,313 Mcf$42,799
Total$42,937

23,653 Mcf of this lease's gas, across 48 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 28.2306, -99.8086. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

28.23062, -99.80857 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
5,180 ft
1 wells filed one
Completion to plug
32.7 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 5,180 ft.

Completions filed
May 1975
1 of 1 wells
Plug dates filed
Jan 2008
1 of 1 wells

Last completion to plug: a median of 32.7 years across the 1 well that filed both dates, with the middle half between 32.7 years and 32.7 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-12730860105,180 ftMay 1975Jan 2008Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (181)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

181 months

Jan 20080090.388.21$0
Dec 20070088.337.30$0
Nov 20070091.677.29$0
Oct 20070082.856.92$0
Sep 20070075.846.24$0
Aug 20070069.066.39$0
Jul 20070070.906.39$0
Jun 20070062.007.55$0
May 20070058.747.85$0
Apr 20070059.617.81$0
Mar 20070056.927.30$0
Feb 20070055.108.22$0
Jan 20070050.306.73$0
Dec 20060056.656.92$0
Nov 20060054.207.62$0
Oct 20060054.906.01$0
Sep 20060060.085.04$0
Aug 20060068.717.34$0
Jul 20060069.376.34$0
Jun 20060066.286.38$0
May 20060066.016.42$0
Apr 20060064.397.36$0
Mar 20060056.707.08$0
Feb 20060057.597.75$0
Jan 20060060.598.93$0
Dec 20050054.9413.42$0
Nov 20050054.6910.59$0
Oct 200501058.3413.80$138
Sep 20050061.4512.08$0
Aug 200505961.519.80$578
Jul 200501255.697.84$94
Jun 20050452.337.38$30
May 200504745.226.65$313
Apr 200505249.207.36$383
Mar 200509250.377.15$658
Feb 2005036645.226.31$2,310
Jan 2005026043.166.32$1,644
Dec 2004018339.866.75$1,235
Nov 2004019045.286.33$1,203
Oct 200406249.706.52$404
Sep 200402543.245.28$132
Aug 200407142.375.55$394
Jul 20040038.286.08$0
Jun 200404736.106.43$302
May 200403437.486.49$221
Apr 200404734.475.86$275
Mar 20040434.365.53$22
Feb 20040832.455.51$44
Jan 20040832.036.30$50
Dec 20030930.266.30$57
Nov 20030628.804.60$28
Oct 200301528.174.76$71
Sep 20030426.314.75$19
Aug 200304229.765.13$215
Jul 200305329.415.17$274
Jun 200305128.565.98$305
May 200309826.595.97$585
Apr 200309126.675.41$492
Mar 200308331.146.10$506
Feb 200305833.487.93$460
Jan 200304430.315.58$246
Dec 200205726.914.85$277
Nov 200203424.664.14$141
Oct 200206526.464.23$275
Sep 200205327.443.64$193
Aug 200206225.963.16$196
Jul 200204624.583.06$141
Jun 200203623.733.34$120
May 200201324.663.58$47
Apr 20020423.653.51$14
Mar 200203222.003.10$99
Feb 200203318.222.38$78
Jan 200201217.172.38$29
Dec 20010916.932.36$21
Nov 20010018.072.41$0
Oct 20010519.782.53$13
Sep 2001013224.262.25$297
Aug 200107724.873.05$235
Jul 200107023.933.20$224
Jun 200107624.563.82$291
May 200107825.524.31$336
Apr 200106724.685.34$357
Mar 200108724.545.38$468
Feb 20010027.755.77$0
Jan 200102227.478.40$185
Dec 20000026.889.12$0
Nov 200001732.215.66$96
Oct 200001331.235.15$67
Sep 200002231.875.19$114
Aug 2000013529.644.54$613
Jul 200007828.534.09$319
Jun 20000829.304.40$35
May 200001527.263.68$55
Apr 20000024.513.12$0
Mar 20000028.422.86$0
Feb 200003927.622.73$106
Jan 200003225.272.48$79
Dec 199905524.282.42$133
Nov 199905523.192.43$134
Oct 199905720.982.80$160
Sep 199905121.752.62$134
Aug 199905519.262.88$158
Jul 1999010717.892.37$254
Jun 199906415.942.36$151
May 199908115.792.32$188
Apr 1999012615.102.21$278
Mar 1999011912.471.84$219
Feb 19990769.981.82$138
Jan 1999015410.381.90$293
Dec 199803179.201.77$562
Nov 1998035610.892.19$778
Oct 1998037812.421.97$744
Sep 1998039912.592.08$831
Aug 1998040011.301.91$763
Jul 1998046911.742.24$1,049
Jun 1998043711.242.24$978
May 1998049412.622.21$1,090
Apr 1998048013.042.51$1,203
Mar 1998051412.802.31$1,187
Feb 1998048313.952.30$1,110
Jan 1998047714.702.15$1,028
Dec 1997034916.322.41$841
Nov 1997036218.193.09$1,118
Oct 1997038119.253.15$1,200
Sep 1997035417.742.95$1,046
Aug 1997031817.862.55$812
Jul 1997030117.582.25$676
Jun 1997031517.242.26$711
May 1997034118.972.31$787
Apr 1997030017.882.08$625
Mar 1997031618.951.94$613
Feb 1997027620.492.21$609
Jan 1997027923.483.54$988
Dec 1996032923.32$0
Nov 1996030921.97$0
Oct 1996033123.31$0
Sep 1996039322.22$0
Aug 1996038020.26$0
Jul 1996046319.55$0
Jun 1996054618.73$0
May 1996052819.43$0
Apr 1996042021.51$0
Mar 1996040219.38$0
Feb 1996036016.98$0
Jan 1996039217.07$0
Dec 1995039117.19$0
Nov 1995035916.00$0
Oct 1995043615.43$0
Sep 1995041616.18$0
Aug 1995044715.92$0
Jul 1995048315.24$0
Jun 1995048416.41$0
May 1995051517.56$0
Apr 1995048617.73$0
Mar 1995051916.44$0
Feb 1995042816.58$0
Jan 1995047615.92$0
Dec 1994051015.03$0
Nov 1994050415.90$0
Oct 1994055815.58$0
Sep 1994054515.29$0
Aug 1994054616.13$0
Jul 1994059717.56$0
Jun 1994058317.09$0
May 1994052915.88$0
Apr 1994046814.14$0
Mar 1994058712.46$0
Feb 1994056212.50$0
Jan 1994058012.66$0
Dec 1993057512.33$0
Nov 1993049114.49$0
Oct 1993054215.85$0
Sep 1993064315.03$0
Aug 1993053515.66$0
Jul 1993057515.46$0
Jun 1993053916.79$0
May 1993158417.68$18
Apr 1993063618.05$0
Mar 1993156618.14$18
Feb 1993152017.90$18
Jan 1993558516.93$85

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Oct 2005 — as filed, then multipliedworked
Condensate             0 bbl  × $ 58.34 =         $0
Gas                   10 Mcf  × $ 13.80 =       $138

────────────────────────────────────────────────────
Month total                                     $138

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 01/G/62024 is the state's own key, not one this site invented.