TEAS, MITTIE

Operated by E & W OIL, INC. (P-5 238520) in the LULING-BRANYON field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Oil lease lease 1117District 01Field 55679001Hydrogen sulphide fieldOilCasinghead gasSaveExport
Value, all time
$1.2 M
Jan 1993 – May 2026
Value, last 12 filed months
$0
at the published price for each month
Months reported
401
no gaps in the span
Streams
2
oil, casinghead gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 507 leases and 2,955 wells, and the rule below applies to all of them.

Discovered
1922-08-08
as the register files it
Field class
Oil and gas
the register's own label
Between wells
0 ft
minimum
From a lease line
150 ft
minimum

A drilling unit in this field needs at least 2 acres. The field rule took effect on 2018-06-19.

The register flags this field for hydrogen sulphide. That is a poisonous gas that occurs naturally in some formations. The flag is a property of the field as the Commission records it. It is not a measurement taken at this lease, and it is not a statement that gas is escaping anywhere.

The Commission's schedule remark for this field reads: CORRELATIVE INTERVAL 1620' - 2164'

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
OilDisposition21,480 bbl$1,218,343
Casinghead gasProduction49 Mcf$6
Total$1,218,349

47 Mcf of this lease's gas, across 47 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (12)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 29.8060, -97.6219. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.2 miles.

29.80595, -97.62188 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
91.7%
11 of 12 wells
With a plug date
100.0%
12 of 12 wells
Median depth
2,278 ft
9 wells filed one
Completion to plug
51.4 years
median over 5 wells

What the state filed about each well

On the RRC proration schedule
1191.7%
A plug date is filed
12100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1191.7%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

Total depth in feet, 9 of 12 wells. Median 2,278 ft, with the middle half between 2,260 and 2,287 ft; the shallowest is 2,206 ft and the deepest 2,300 ft. The median is published rather than the mean, because a single mis-keyed depth moves a mean and cannot move a median.

When they were last completed

Last completion by decade, 5 of 12 wells, Mar 1971 – Nov 1981. This is the LAST completion filed on each wellbore, not the first — a well recompleted in 2019 counts once, in the 2010s.

Completions filed
Mar 1971 – Nov 1981
5 of 12 wells; 7 filed none
Plug dates filed
Jan 2023
12 of 12 wells

Last completion to plug: a median of 51.4 years across the 5 wells that filed both dates, with the middle half between 51.3 years and 51.8 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

12 wells

42-055018671A2,250 ftJan 2023Yes
42-055018682AJan 2023Yes
42-055018693A2,287 ftJan 2023Yes
42-055018704A2,300 ftJan 2023Yes
42-055802891Jan 2023Yes
42-055802905AJan 2023Yes
42-055018926A2,296 ftJan 2023
42-0553168611A2,275 ftNov 1981Jan 2023Yes
42-0553036610A2,280 ftOct 1971Jan 2023Yes
42-055302909A2,206 ftAug 1971Jan 2023Yes
42-055302738A2,260 ftApr 1971Jan 2023Yes
42-055302707A2,278 ftMar 1971Jan 2023Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (401)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

401 months

May 202600106.413.05$0
Apr 20260098.932.87$0
Mar 20260089.753.15$0
Feb 20260063.503.75$0
Jan 20260059.138.00$0
Dec 20250056.664.41$0
Nov 20250058.593.93$0
Oct 20250059.383.30$0
Sep 20250062.743.08$0
Aug 20250063.933.01$0
Jul 20250066.743.32$0
Jun 20250066.483.13$0
May 20250060.553.23$0
Apr 20250062.363.54$0
Mar 20250067.704.27$0
Feb 20250070.884.34$0
Jan 20250074.324.28$0
Dec 20240068.993.12$0
Nov 20240069.052.20$0
Oct 20240071.372.28$0
Sep 20240069.612.36$0
Aug 20240075.632.06$0
Jul 20240079.932.15$0
Jun 20240078.082.63$0
May 20240078.812.20$0
Apr 20240084.451.66$0
Mar 20240080.301.55$0
Feb 20240076.091.78$0
Jan 20240073.023.30$0
Dec 20230071.262.61$0
Nov 20230077.892.81$0
Oct 20230085.443.09$0
Sep 20230089.042.74$0
Aug 20230080.522.67$0
Jul 20230074.852.64$0
Jun 20230068.962.26$0
May 20230070.622.23$0
Apr 20230078.122.24$0
Mar 20230072.852.39$0
Feb 20230075.112.47$0
Jan 20230076.533.39$0
Dec 20220076.415.73$0
Nov 20220085.005.65$0
Oct 20220087.185.86$0
Sep 20220084.888.16$0
Aug 20220094.529.13$0
Jul 202200101.587.54$0
Jun 202200115.097.98$0
May 202200109.378.43$0
Apr 202200104.226.84$0
Mar 202200108.885.08$0
Feb 20220091.054.86$0
Jan 20220081.844.54$0
Dec 20210071.323.90$0
Nov 20210077.435.24$0
Oct 20210079.795.71$0
Sep 20210069.865.35$0
Aug 20210066.024.22$0
Jul 20210070.783.98$0
Jun 20210069.493.38$0
May 20210063.483.02$0
Apr 20210060.362.76$0
Mar 20210061.302.72$0
Feb 20210057.805.55$0
Jan 20210050.412.81$0
Dec 20200044.642.68$0
Nov 20200038.772.71$0
Oct 20200036.972.48$0
Sep 20200037.091.99$0
Aug 20200039.982.39$0
Jul 20200038.371.83$0
Jun 20200034.901.69$0
May 20200016.921.81$0
Apr 20200014.751.80$0
Mar 20200030.341.86$0
Feb 20200049.881.98$0
Jan 20200057.252.09$0
Dec 20190059.012.30$0
Nov 20190055.302.75$0
Oct 20190053.472.42$0
Sep 2019118055.052.66$6,496
Aug 20190053.112.30$0
Jul 20190056.272.46$0
Jun 20190052.782.49$0
May 20190058.482.74$0
Apr 2019147062.632.75$9,207
Mar 20190056.803.06$0
Feb 20190050.852.79$0
Jan 20190046.033.23$0
Dec 2018155046.594.19$7,221
Nov 20180052.934.24$0
Oct 20180061.443.40$0
Sep 2018166059.543.11$9,884
Aug 20180059.403.07$0
Jul 2018102065.142.93$6,644
Jun 20180060.183.08$0
May 20180065.382.90$0
Apr 20180063.842.90$0
Mar 20180061.222.79$0
Feb 2018172061.782.77$10,626
Jan 201864062.874.01$4,024
Dec 20170057.272.92$0
Nov 20170055.423.12$0
Oct 201797049.292.98$4,781
Sep 20170047.523.09$0
Aug 20170045.373.00$0
Jul 201778043.873.09$3,422
Jun 2017155042.493.09$6,586
May 20170045.373.26$0
Apr 2017169047.933.21$8,100
Mar 20170046.772.98$0
Feb 20170050.452.95$0
Jan 201785049.413.42$4,200
Dec 20160048.763.72$0
Nov 2016125042.492.64$5,311
Oct 201650046.193.09$2,310
Sep 201690041.553.10$3,740
Aug 201698041.442.92$4,061
Jul 2016167041.622.92$6,951
Jun 201654045.352.69$2,449
May 2016162042.521.99$6,888
Apr 2016170036.561.99$6,215
Mar 20160033.011.79$0
Feb 2016126026.472.06$3,335
Jan 2016104027.352.36$2,844
Dec 2015137032.362.00$4,433
Nov 2015102038.792.17$3,957
Oct 2015107043.552.43$4,660
Sep 2015164042.992.76$7,050
Aug 20150040.162.87$0
Jul 20150048.152.95$0
Jun 20150056.152.88$0
May 2015162055.212.96$8,944
Apr 2015240049.822.71$11,957
Mar 201560042.892.93$2,573
Feb 2015143044.662.98$6,386
Jan 2015249043.433.10$10,814
Dec 20140054.693.59$0
Nov 201477070.464.25$5,425
Oct 2014153078.303.90$11,980
Sep 2014159086.164.05$13,699
Aug 2014246089.394.04$21,990
Jul 20140096.564.18$0
Jun 2014148098.164.74$14,528
May 201496094.734.73$9,094
Apr 20140095.944.81$0
Mar 20140095.895.06$0
Feb 20140097.406.19$0
Jan 2014150090.404.86$13,560
Dec 2013150091.824.35$13,773
Nov 2013171088.853.74$15,193
Oct 2013144097.423.78$14,028
Sep 201300104.113.72$0
Aug 20133270104.253.52$34,090
Jul 20131540102.523.72$15,788
Jun 20130094.403.93$0
May 20130094.834.15$0
Apr 20130093.964.28$0
Mar 20130093.623.91$0
Feb 20130091.233.42$0
Jan 20130091.603.42$0
Dec 20120086.773.42$0
Nov 2012163086.953.62$14,173
Oct 2012168089.383.40$15,016
Sep 2012167094.672.92$15,810
Aug 2012132092.662.91$12,231
Jul 2012166085.133.02$14,132
Jun 2012140079.822.52$11,175
May 2012159091.612.49$14,566
Apr 20121750101.652.00$17,789
Mar 20121540105.052.22$16,178
Feb 20121670101.102.57$16,884
Jan 2012174098.092.73$17,068
Dec 20110096.873.24$0
Nov 2011168095.723.31$16,081
Oct 20110084.983.65$0
Sep 2011169083.623.99$14,132
Aug 2011163083.404.15$13,594
Jul 2011301094.144.52$28,336
Jun 2011166092.904.64$15,421
May 2011159098.134.40$15,603
Apr 20111630105.964.33$17,271
Mar 20110096.364.06$0
Feb 2011308085.644.18$26,377
Jan 2011156086.504.59$13,494
Dec 2010327085.734.35$28,034
Nov 20100080.843.80$0
Oct 20100078.103.51$0
Sep 2010314072.633.98$22,806
Aug 20100073.684.42$0
Jul 2010165072.554.74$11,971
Jun 2010153070.364.91$10,765
May 2010167071.124.24$11,877
Apr 2010172081.694.12$14,051
Mar 20100078.394.39$0
Feb 2010337073.585.44$24,796
Jan 20100074.365.96$0
Dec 2009352071.445.48$25,147
Nov 2009172074.593.75$12,829
Oct 20090072.544.11$0
Sep 2009171065.543.06$11,207
Aug 2009144067.423.22$9,708
Jul 2009170061.133.46$10,392
Jun 2009341066.163.90$22,561
May 2009177054.743.93$9,689
Apr 2009169046.773.59$7,904
Mar 200919042.144.06$801
Feb 2009171032.814.63$5,611
Jan 20090035.865.37$0
Dec 2008183037.105.98$6,789
Nov 2008175055.496.86$9,711
Oct 2008175075.246.92$13,167
Sep 20081700101.767.88$17,299
Aug 200800114.228.48$0
Jul 20081470131.0811.39$19,269
Jun 20081830131.3313.03$24,033
May 200800123.1711.57$0
Apr 200800110.3110.45$0
Mar 20081420101.909.66$14,470
Feb 2008155092.538.77$14,342
Jan 20080090.388.21$0
Dec 2007162088.337.30$14,309
Nov 2007171091.677.29$15,676
Oct 20070082.856.92$0
Sep 2007164075.846.24$12,438
Aug 20070069.066.39$0
Jul 20070070.906.39$0
Jun 20070062.007.55$0
May 20070058.747.85$0
Apr 20070059.617.81$0
Mar 20070056.927.30$0
Feb 20070055.108.22$0
Jan 20070050.306.73$0
Dec 20060056.656.92$0
Nov 20060054.207.62$0
Oct 20060054.906.01$0
Sep 20060060.085.04$0
Aug 20060068.717.34$0
Jul 20060069.376.34$0
Jun 20060066.286.38$0
May 20060066.016.42$0
Apr 20060064.397.36$0
Mar 20060056.707.08$0
Feb 20060057.597.75$0
Jan 20060060.598.93$0
Dec 20050054.9413.42$0
Nov 20050054.6910.59$0
Oct 20050058.3413.80$0
Sep 20050061.4512.08$0
Aug 20050061.519.80$0
Jul 20050055.697.84$0
Jun 2005179052.337.38$9,367
May 2005132045.226.65$5,969
Apr 20050049.207.36$0
Mar 20050050.377.15$0
Feb 20050045.226.31$0
Jan 20050043.166.32$0
Dec 20040039.866.75$0
Nov 20040045.286.33$0
Oct 20040049.706.52$0
Sep 2004155043.245.28$6,702
Aug 20040042.375.55$0
Jul 20040038.286.08$0
Jun 20040036.106.43$0
May 20040037.486.49$0
Apr 20040034.475.86$0
Mar 20040034.365.53$0
Feb 20040032.455.51$0
Jan 20040032.036.30$0
Dec 20030030.266.30$0
Nov 20030028.804.60$0
Oct 20030028.174.76$0
Sep 20030026.314.75$0
Aug 20030029.765.13$0
Jul 20030029.415.17$0
Jun 20030028.565.98$0
May 20030026.595.97$0
Apr 20030026.675.41$0
Mar 20030031.146.10$0
Feb 20030033.487.93$0
Jan 20030030.315.58$0
Dec 20020026.914.85$0
Nov 20020024.664.14$0
Oct 20020026.464.23$0
Sep 20020027.443.64$0
Aug 20020025.963.16$0
Jul 20020024.583.06$0
Jun 20020023.733.34$0
May 20020024.663.58$0
Apr 20020023.653.51$0
Mar 20020022.003.10$0
Feb 20020018.222.38$0
Jan 20020017.172.38$0
Dec 20010016.932.36$0
Nov 20010018.072.41$0
Oct 20010019.782.53$0
Sep 20010024.262.25$0
Aug 20010024.873.05$0
Jul 20010023.933.20$0
Jun 20010024.563.82$0
May 20010025.524.31$0
Apr 20010024.685.34$0
Mar 20010024.545.38$0
Feb 20010027.755.77$0
Jan 20010027.478.40$0
Dec 20000026.889.12$0
Nov 20000032.215.66$0
Oct 20000031.235.15$0
Sep 20000031.875.19$0
Aug 20000029.644.54$0
Jul 20000028.534.09$0
Jun 20000029.304.40$0
May 20000027.263.68$0
Apr 20000024.513.12$0
Mar 20000028.422.86$0
Feb 20000027.622.73$0
Jan 20000025.272.48$0
Dec 19990024.282.42$0
Nov 19990023.192.43$0
Oct 19990020.982.80$0
Sep 19990021.752.62$0
Aug 19990019.262.88$0
Jul 19990017.892.37$0
Jun 19990015.942.36$0
May 19990015.792.32$0
Apr 19990015.102.21$0
Mar 19990012.471.84$0
Feb 1999009.981.82$0
Jan 19992010.381.90$21
Dec 1998709.201.77$64
Nov 19980010.892.19$0
Oct 199830012.421.97$373
Sep 19980012.592.08$0
Aug 19980011.301.91$0
Jul 19980011.742.24$0
Jun 19980011.242.24$0
May 199829012.622.21$366
Apr 19980013.042.51$0
Mar 199853012.802.31$678
Feb 19980013.952.30$0
Jan 19980014.702.15$0
Dec 199749016.322.41$800
Nov 19970018.193.09$0
Oct 1997179019.253.15$3,446
Sep 19970017.742.95$0
Aug 199725017.862.55$447
Jul 199749017.582.25$861
Jun 19970017.242.26$0
May 19970018.972.31$0
Apr 1997309017.882.08$5,525
Mar 19970018.951.94$0
Feb 19970120.492.21$2
Jan 19970123.483.54$4
Dec 19960123.32$0
Nov 19960121.97$0
Oct 19960123.31$0
Sep 19960122.22$0
Aug 19960120.26$0
Jul 19960119.55$0
Jun 199641118.73$768
May 199670019.43$1,360
Apr 199676121.51$1,635
Mar 199692119.38$1,783
Feb 1996318116.98$5,400
Jan 19960117.07$0
Dec 1995172117.19$2,957
Nov 1995110116.00$1,760
Oct 19950115.43$0
Sep 199586116.18$1,391
Aug 199590115.92$1,433
Jul 199575115.24$1,143
Jun 1995136116.41$2,232
May 199596117.56$1,686
Apr 199597117.73$1,720
Mar 199586116.44$1,414
Feb 1995238116.58$3,946
Jan 1995118115.92$1,879
Dec 1994146115.03$2,194
Nov 1994121115.90$1,924
Oct 1994118115.58$1,838
Sep 199478115.29$1,193
Aug 1994151116.13$2,436
Jul 1994136117.56$2,388
Jun 1994149117.09$2,546
May 1994128115.88$2,033
Apr 1994155114.14$2,192
Mar 1994163112.46$2,031
Feb 1994138112.50$1,725
Jan 1994174112.66$2,203
Dec 1993134112.33$1,652
Nov 1993155114.49$2,246
Oct 1993166115.85$2,631
Sep 1993149115.03$2,239
Aug 1993172115.66$2,694
Jul 1993145115.46$2,242
Jun 1993165116.79$2,770
May 1993166117.68$2,935
Apr 1993175118.05$3,159
Mar 1993168118.14$3,048
Feb 1993134117.90$2,399
Jan 1993136116.93$2,302

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Sep 2019 — as filed, then multipliedworked
Oil                  118 bbl  × $ 55.05 =     $6,496
Casinghead gas         0 Mcf  × $  2.66 =         $0

────────────────────────────────────────────────────
Month total                                   $6,496

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 01/O/1117 is the state's own key, not one this site invented.