BAKER, A.J. 14H

Operated by TEXAS PETROLEUM INVESTMENT CO. (P-5 847710) in the LULING-BRANYON field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Oil lease lease 14575District 01Field 55679001OilSave
Value, all time
$16.4 M
Jan 2005 – Oct 2019
Value, last 12 filed months
$488 k
at the published price for each month
Months reported
177
1 month not filed
Streams
1
oil

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
OilDisposition248,559 bbl$16,397,674
Total$16,397,674

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 29.7008, -97.7529. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

29.70080, -97.75292 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
2,142 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 2,142 ft.

Completions filed
Jan 2005
1 of 1 wells

1 well

42-1873350114H2,142 ftJan 2005

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (177)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

177 months

Oct 2019053.472.42$0
Sep 2019055.052.66$0
Aug 2019053.112.30$0
Jun 201988352.782.49$46,605
May 20191,05458.482.74$61,638
Apr 201995362.632.75$59,686
Mar 20191,01456.803.06$57,595
Feb 201994550.852.79$48,053
Jan 20191,04646.033.23$48,147
Dec 20181,01946.594.19$47,475
Nov 20181,03952.934.24$54,994
Oct 20181,03961.443.40$63,836
Sep 201896059.543.11$57,158
Aug 20181,10659.403.07$65,696
Jul 20181,10265.142.93$71,784
Jun 20181,13760.183.08$68,425
May 20181,16565.382.90$76,168
Apr 20181,12263.842.90$71,628
Mar 20181,26861.222.79$77,627
Feb 20181,10261.782.77$68,082
Jan 20181,20162.874.01$75,507
Dec 20171,17057.272.92$67,006
Nov 20171,10755.423.12$61,350
Oct 20171,18549.292.98$58,409
Sep 20171,17447.523.09$55,788
Aug 20171,00345.373.00$45,506
Jul 20171,13943.873.09$49,968
Jun 20171,07342.493.09$45,592
May 20171,16145.373.26$52,675
Apr 20171,09547.933.21$52,483
Mar 20171,12346.772.98$52,523
Feb 20171,03850.452.95$52,367
Jan 20171,11949.413.42$55,290
Dec 20161,09848.763.72$53,538
Nov 20161,07442.492.64$45,634
Oct 20161,10346.193.09$50,948
Sep 20161,10441.553.10$45,871
Aug 20161,14941.442.92$47,615
Jul 20161,17341.622.92$48,820
Jun 20161,11745.352.69$50,656
May 20161,09142.521.99$46,389
Apr 20161,14136.561.99$41,715
Mar 20161,16233.011.79$38,358
Feb 20161,07426.472.06$28,429
Jan 20161,09727.352.36$30,003
Dec 20151,11632.362.00$36,114
Nov 20151,04238.792.17$40,419
Oct 20151,03443.552.43$45,031
Sep 201596942.992.76$41,657
Aug 201596340.162.87$38,674
Jul 201593248.152.95$44,876
Jun 201582956.152.88$46,548
May 201581755.212.96$45,107
Apr 201592149.822.71$45,884
Mar 201599842.892.93$42,804
Feb 201587744.662.98$39,167
Jan 201595143.433.10$41,302
Dec 201489454.693.59$48,893
Nov 201486970.464.25$61,230
Oct 201485178.303.90$66,633
Sep 201477686.164.05$66,860
Aug 2014289.394.04$179
Jul 201485296.564.18$82,269
Jun 201499398.164.74$97,473
May 201495594.734.73$90,467
Apr 201491095.944.81$87,305
Mar 20141,06595.895.06$102,123
Feb 201497097.406.19$94,478
Jan 20141,05590.404.86$95,372
Dec 20131,04791.824.35$96,136
Nov 20131,00688.853.74$89,383
Oct 20131,01397.423.78$98,686
Sep 2013977104.113.72$101,715
Aug 20131,017104.253.52$106,022
Jul 20131,011102.523.72$103,648
Jun 20131,00194.403.93$94,494
May 20131,02194.834.15$96,821
Apr 20131,01593.964.28$95,369
Mar 20131,01093.623.91$94,556
Feb 201391591.233.42$83,475
Jan 20131,07191.603.42$98,104
Dec 20121,03986.773.42$90,154
Nov 201297586.953.62$84,776
Oct 20121,00089.383.40$89,380
Sep 201298794.672.92$93,439
Aug 20121,04392.662.91$96,644
Jul 20121,02785.133.02$87,429
Jun 201298179.822.52$78,303
May 20121,03791.612.49$95,000
Apr 20121,016101.652.00$103,276
Mar 20121,049105.052.22$110,197
Feb 20121,018101.102.57$102,920
Jan 20121,07198.092.73$105,054
Dec 20111,04696.873.24$101,326
Nov 20111,01195.723.31$96,773
Oct 20111,07284.983.65$91,099
Sep 20111,00883.623.99$84,289
Aug 20111,04983.404.15$87,487
Jul 20111,09994.144.52$103,460
Jun 20111,09092.904.64$101,261
May 20111,09298.134.40$107,158
Apr 20111,040105.964.33$110,198
Mar 20111,10996.364.06$106,863
Feb 201197185.644.18$83,156
Jan 20111,08486.504.59$93,766
Dec 20101,07885.734.35$92,417
Nov 201072580.843.80$58,609
Oct 20101,09978.103.51$85,832
Sep 20101,09572.633.98$79,530
Aug 20101,16473.684.42$85,764
Jul 20101,19772.554.74$86,842
Jun 20101,09870.364.91$77,255
May 20101,34271.124.24$95,443
Apr 20101,32981.694.12$108,566
Mar 20101,37478.394.39$107,708
Feb 20101,20573.585.44$88,664
Jan 20101,18974.365.96$88,414
Dec 20091,37171.445.48$97,944
Nov 20091,33874.593.75$99,801
Oct 20091,45672.544.11$105,618
Sep 20091,38065.543.06$90,445
Aug 20091,44467.423.22$97,354
Jul 20091,45261.133.46$88,761
Jun 20091,41266.163.90$93,418
May 20091,43554.743.93$78,552
Apr 20091,44646.773.59$67,629
Mar 20091,53542.144.06$64,685
Feb 20091,36532.814.63$44,786
Jan 20091,52435.865.37$54,651
Dec 20081,18837.105.98$44,075
Nov 200876155.496.86$42,228
Oct 20081,06075.246.92$79,754
Sep 20081,188101.767.88$120,891
Aug 20081,459114.228.48$166,647
Jul 20081,335131.0811.39$174,992
Jun 20081,520131.3313.03$199,622
May 20081,570123.1711.57$193,377
Apr 20081,504110.3110.45$165,906
Mar 20081,514101.909.66$154,277
Feb 20081,55392.538.77$143,699
Jan 20081,67590.388.21$151,387
Dec 20071,66388.337.30$146,893
Nov 20071,62391.677.29$148,780
Oct 200782982.856.92$68,683
Sep 20071,80075.846.24$136,512
Aug 20071,56469.066.39$108,010
Jul 20071,80470.906.39$127,904
Jun 20071,62062.007.55$100,440
May 20071,79158.747.85$105,203
Apr 20071,93959.617.81$115,584
Mar 20071,85056.927.30$105,302
Feb 20071,79655.108.22$98,960
Jan 20071,44850.306.73$72,834
Dec 20061,90256.656.92$107,748
Nov 20061,81754.207.62$98,481
Oct 20061,95654.906.01$107,384
Sep 20061,88960.085.04$113,491
Aug 20062,07568.717.34$142,573
Jul 20062,13069.376.34$147,758
Jun 20062,14566.286.38$142,171
May 20062,30666.016.42$152,219
Apr 20062,61264.397.36$168,187
Mar 20062,80356.707.08$158,930
Feb 20062,67957.597.75$154,284
Jan 20063,03460.598.93$183,830
Dec 20053,10454.9413.42$170,534
Nov 20053,07254.6910.59$168,008
Oct 20051,96358.3413.80$114,521
Sep 20053,52361.4512.08$216,488
Aug 20053,77661.519.80$232,262
Jul 20053,75855.697.84$209,283
Jun 20054,23452.337.38$221,565
May 20054,36445.226.65$197,340
Apr 20054,68549.207.36$230,502
Mar 20055,83850.377.15$294,060
Feb 20055,90445.226.31$266,979
Jan 20055,29943.166.32$228,705

Not filed, and not zero: Jul 2019. The Railroad Commission holds no report for those months, so this page shows none — a zero would state that the lease produced nothing.

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Jun 2019 — as filed, then multipliedworked
Oil                  883 bbl  × $ 52.78 =    $46,605

────────────────────────────────────────────────────
Month total                                  $46,605

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 01/O/14575 is the state's own key, not one this site invented.