DIX MCKEAN B 5H

Operated by TEXAS PETROLEUM INVESTMENT CO. (P-5 847710) in the DARST CREEK (EDWARDS) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Oil lease lease 14686District 01Field 23191666OilSave
Value, all time
$5.0 M
Dec 2005 – Jul 2015
Value, last 12 filed months
$0
at the published price for each month
Months reported
115
1 month not filed
Streams
1
oil

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
OilDisposition62,199 bbl$5,001,369
Total$5,001,369

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 29.6124, -97.7359. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

29.61238, -97.73594 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
2,640 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 2,640 ft.

Completions filed
Dec 2005
1 of 1 wells

1 well

42-187335265H2,640 ftDec 2005

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (115)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

115 months

Jul 2015048.152.95$0
Jun 2015056.152.88$0
May 2015055.212.96$0
Apr 2015049.822.71$0
Mar 2015042.892.93$0
Feb 2015044.662.98$0
Jan 2015043.433.10$0
Dec 2014054.693.59$0
Nov 2014070.464.25$0
Oct 2014078.303.90$0
Sep 2014086.164.05$0
Aug 2014089.394.04$0
Jul 2014096.564.18$0
Jun 2014098.164.74$0
Apr 201457395.944.81$54,974
Mar 201459895.895.06$57,342
Feb 201456397.406.19$54,836
Jan 201456090.404.86$50,624
Dec 201358191.824.35$53,347
Nov 201355988.853.74$49,667
Oct 201356997.423.78$55,432
Sep 2013556104.113.72$57,885
Aug 2013546104.253.52$56,921
Jul 2013535102.523.72$54,848
Jun 201352294.403.93$49,277
May 201354794.834.15$51,872
Apr 201353093.964.28$49,799
Mar 201360193.623.91$56,266
Feb 201365691.233.42$59,847
Jan 201350391.603.42$46,075
Dec 201252586.773.42$45,554
Nov 201252886.953.62$45,910
Oct 201256289.383.40$50,232
Sep 201252194.672.92$49,323
Aug 201255092.662.91$50,963
Jul 201254185.133.02$46,055
Jun 201252379.822.52$41,746
May 201256491.612.49$51,668
Apr 2012579101.652.00$58,855
Mar 2012596105.052.22$62,610
Feb 2012595101.102.57$60,155
Jan 201266198.092.73$64,837
Dec 201169896.873.24$67,615
Nov 201164995.723.31$62,122
Oct 201167584.983.65$57,362
Sep 201162483.623.99$52,179
Aug 201162983.404.15$52,459
Jul 201163794.144.52$59,967
Jun 201158092.904.64$53,882
May 201162798.134.40$61,528
Apr 2011613105.964.33$64,953
Mar 201166796.364.06$64,272
Feb 201157885.644.18$49,500
Jan 201165886.504.59$56,917
Dec 201060485.734.35$51,781
Nov 201061380.843.80$49,555
Oct 201063878.103.51$49,828
Sep 201062772.633.98$45,539
Aug 201066073.684.42$48,629
Jul 201066472.554.74$48,173
Jun 201065470.364.91$46,015
May 201064471.124.24$45,801
Apr 201066881.694.12$54,569
Mar 201067578.394.39$52,913
Feb 201062773.585.44$46,135
Jan 201070574.365.96$52,424
Dec 200970471.445.48$50,294
Nov 200969674.593.75$51,915
Oct 200970072.544.11$50,778
Sep 200971165.543.06$46,599
Aug 200977467.423.22$52,183
Jul 200976361.133.46$46,642
Jun 200965166.163.90$43,070
May 200934554.743.93$18,885
Apr 200963146.773.59$29,512
Mar 200953242.144.06$22,418
Feb 200953532.814.63$17,553
Jan 200954335.865.37$19,472
Dec 200857537.105.98$21,333
Nov 200854655.496.86$30,298
Oct 200860675.246.92$45,595
Sep 2008580101.767.88$59,021
Aug 2008614114.228.48$70,131
Jul 2008595131.0811.39$77,993
Jun 2008748131.3313.03$98,235
May 2008644123.1711.57$79,321
Apr 2008666110.3110.45$73,466
Mar 2008738101.909.66$75,202
Feb 200871992.538.77$66,529
Jan 200866790.388.21$60,283
Dec 200766888.337.30$59,004
Nov 200752291.677.29$47,852
Oct 200770082.856.92$57,995
Sep 200762275.846.24$47,172
Aug 200766369.066.39$45,787
Jul 200765270.906.39$46,227
Jun 200771162.007.55$44,082
May 200771758.747.85$42,117
Apr 200768959.617.81$41,071
Mar 200767956.927.30$38,649
Feb 200750955.108.22$28,046
Jan 200753950.306.73$27,112
Dec 200665256.656.92$36,936
Nov 200667954.207.62$36,802
Oct 200671654.906.01$39,308
Sep 2006060.085.04$0
Aug 2006068.717.34$0
Jul 2006569.376.34$347
Jun 20066666.286.38$4,374
May 20061,54766.016.42$102,117
Apr 20061,85664.397.36$119,508
Mar 200696056.707.08$54,432
Feb 200688157.597.75$50,737
Jan 200672560.598.93$43,928
Dec 2005054.9413.42$0

Not filed, and not zero: May 2014. The Railroad Commission holds no report for those months, so this page shows none — a zero would state that the lease produced nothing.

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Apr 2014 — as filed, then multipliedworked
Oil                  573 bbl  × $ 95.94 =    $54,974

────────────────────────────────────────────────────
Month total                                  $54,974

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 01/O/14686 is the state's own key, not one this site invented.