MORRILL

Operated by PETROTX OPERATING, LLC (P-5 660964) in the GAS-X, SHALLOW (CARRIZO) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Oil lease lease 14781District 01Field 34152075OilCasinghead gasSaveExport
Value, all time
$2.8 M
Jul 2006 – May 2026
Value, last 12 filed months
$0
at the published price for each month
Months reported
239
no gaps in the span
Streams
2
oil, casinghead gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 3 leases and 4 wells, and the rule below applies to all of them.

Discovered
2003-09-25
as the register files it
Field class
Oil and gas
the register's own label
Between wells
no field rule filed
From a lease line
no field rule filed

The Commission's schedule remark for this field reads: ONE-WELL EFFECTIVE 8-01-07

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
OilDisposition32,481 bbl$2,542,472
Casinghead gasProduction43,927 Mcf$215,448
Total$2,757,920

Wells on this lease (2)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 28.5578, -98.3733. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.2 miles.

28.55779, -98.37326 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
2 of 2 wells
With a plug date
100.0%
2 of 2 wells
Median depth
5,318 ft
2 wells filed one
Completion to plug
17.2 years
median over 2 wells

What the state filed about each well

On the RRC proration schedule
2100.0%
A plug date is filed
2100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
2100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

Between 4,500 and 6,135 ft, median 5,318 ft, over the 2 wells that filed a depth.

Completions filed
Oct 2005 – Mar 2010
2 of 2 wells
Plug dates filed
Nov 2024 – May 2025
2 of 2 wells

Last completion to plug: a median of 17.2 years across the 2 wells that filed both dates, with the middle half between 15.9 years and 18.3 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

2 wells

42-3113369934,500 ftMar 2010Nov 2024Yes
42-3113377296,135 ftOct 2005May 2025Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (239)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

239 months

May 202600106.413.05$0
Apr 20260098.932.87$0
Mar 20260089.753.15$0
Feb 20260063.503.75$0
Jan 20260059.138.00$0
Dec 20250056.664.41$0
Nov 20250058.593.93$0
Oct 20250059.383.30$0
Sep 20250062.743.08$0
Aug 20250063.933.01$0
Jul 20250066.743.32$0
Jun 20250066.483.13$0
May 20250060.553.23$0
Apr 20250062.363.54$0
Mar 20250067.704.27$0
Feb 20250070.884.34$0
Jan 20250074.324.28$0
Dec 20240068.993.12$0
Nov 20240069.052.20$0
Oct 20240071.372.28$0
Sep 20240069.612.36$0
Aug 20240075.632.06$0
Jul 20240079.932.15$0
Jun 20240078.082.63$0
May 20240078.812.20$0
Apr 20240084.451.66$0
Mar 20240080.301.55$0
Feb 20240076.091.78$0
Jan 20240073.023.30$0
Dec 20230071.262.61$0
Nov 20230077.892.81$0
Oct 20230085.443.09$0
Sep 20230089.042.74$0
Aug 20230080.522.67$0
Jul 20230074.852.64$0
Jun 20230068.962.26$0
May 20230070.622.23$0
Apr 20230078.122.24$0
Mar 20230072.852.39$0
Feb 20230075.112.47$0
Jan 20230076.533.39$0
Dec 20220076.415.73$0
Nov 20220085.005.65$0
Oct 20220087.185.86$0
Sep 20220084.888.16$0
Aug 20220094.529.13$0
Jul 202200101.587.54$0
Jun 202200115.097.98$0
May 202200109.378.43$0
Apr 202200104.226.84$0
Mar 202200108.885.08$0
Feb 20220091.054.86$0
Jan 20220081.844.54$0
Dec 20210071.323.90$0
Nov 20210077.435.24$0
Oct 20210079.795.71$0
Sep 20210069.865.35$0
Aug 20210066.024.22$0
Jul 20210070.783.98$0
Jun 20210069.493.38$0
May 20210063.483.02$0
Apr 202105,77360.362.76$15,924
Mar 20210061.302.72$0
Feb 20210057.805.55$0
Jan 20210050.412.81$0
Dec 20200044.642.68$0
Nov 20200038.772.71$0
Oct 20200036.972.48$0
Sep 20200037.091.99$0
Aug 20200039.982.39$0
Jul 20200038.371.83$0
Jun 20200034.901.69$0
May 20200016.921.81$0
Apr 20200014.751.80$0
Mar 20200030.341.86$0
Feb 20200049.881.98$0
Jan 20200057.252.09$0
Dec 20190059.012.30$0
Nov 20190055.302.75$0
Oct 20190053.472.42$0
Sep 201922655.052.66$179
Aug 201921753.112.30$145
Jul 201924656.272.46$226
Jun 20192552.782.49$118
May 201928058.482.74$336
Apr 201905662.632.75$154
Mar 2019212656.803.06$499
Feb 201901550.852.79$42
Jan 2019210846.033.23$441
Dec 20182046.594.19$93
Nov 20182052.934.24$106
Oct 201821261.443.40$164
Sep 201825359.543.11$284
Aug 2018215959.403.07$606
Jul 2018212265.142.93$488
Jun 2018217960.183.08$671
May 201824165.382.90$250
Apr 2018229663.842.90$986
Mar 2018224061.222.79$791
Feb 2018213261.782.77$489
Jan 2018221662.874.01$992
Dec 2017213157.272.92$497
Nov 2017230355.423.12$1,056
Oct 2017324849.292.98$888
Sep 2017327647.523.09$995
Aug 2017330845.373.00$1,061
Jul 2017334043.873.09$1,181
Jun 2017322942.493.09$834
May 2017537045.373.26$1,434
Apr 2017935447.933.21$1,568
Mar 2017538146.772.98$1,371
Feb 2017432550.452.95$1,161
Jan 201711143949.413.42$6,985
Dec 2016831648.763.72$1,566
Nov 2016619542.492.64$771
Oct 2016025646.193.09$791
Sep 20164736241.553.10$3,075
Aug 2016631341.442.92$1,164
Jul 2016643941.622.92$1,534
Jun 2016028845.352.69$774
May 2016029842.521.99$593
Apr 2016026036.561.99$518
Mar 2016021133.011.79$379
Feb 2016024026.472.06$495
Jan 2016025227.352.36$596
Dec 2015036832.362.00$737
Nov 2015032038.792.17$694
Oct 2015026243.552.43$636
Sep 2015046042.992.76$1,269
Aug 2015030140.162.87$865
Jul 201522550048.152.95$12,306
Jun 201528430056.152.88$16,811
May 201530635055.212.96$17,929
Apr 201550730049.822.71$26,071
Mar 201536331042.892.93$16,479
Feb 2015035044.662.98$1,042
Jan 20155734043.433.10$3,530
Dec 20144779554.693.59$26,428
Nov 201431431070.464.25$23,443
Oct 201449045078.303.90$40,122
Sep 201436363086.164.05$33,825
Aug 201439131089.394.04$36,202
Jul 201435970096.564.18$37,591
Jun 20141911,78498.164.74$27,199
May 20141902,29794.734.73$28,856
Apr 20142763,20695.944.81$41,897
Mar 2014728095.895.06$69,808
Feb 2014252097.406.19$24,545
Jan 2014259090.404.86$23,414
Dec 2013754091.824.35$69,232
Nov 201389088.853.74$7,908
Oct 20130097.423.78$0
Sep 20131580104.113.72$16,449
Aug 20131400104.253.52$14,595
Jul 20131370102.523.72$14,045
Jun 2013127094.403.93$11,989
May 2013130094.834.15$12,328
Apr 2013127093.964.28$11,933
Mar 2013185093.623.91$17,320
Feb 2013127091.233.42$11,586
Jan 2013207091.603.42$18,961
Dec 2012338086.773.42$29,328
Nov 201284086.953.62$7,304
Oct 2012312089.383.40$27,887
Sep 2012253094.672.92$23,952
Aug 2012343092.662.91$31,782
Jul 2012267085.133.02$22,730
Jun 2012260079.822.52$20,753
May 2012162091.612.49$14,841
Apr 20122710101.652.00$27,547
Mar 20122770105.052.22$29,099
Feb 20122840101.102.57$28,712
Jan 2012692098.092.73$67,878
Dec 20110096.873.24$0
Nov 2011415095.723.31$39,724
Oct 2011676084.983.65$57,446
Sep 2011440083.623.99$36,793
Aug 2011541083.404.15$45,119
Jul 2011129094.144.52$12,144
Jun 20110092.904.64$0
May 2011245098.134.40$24,042
Apr 20111290105.964.33$13,669
Mar 2011385096.364.06$37,099
Feb 2011252085.644.18$21,581
Jan 2011250086.504.59$21,625
Dec 2010493085.734.35$42,265
Nov 2010248080.843.80$20,048
Oct 2010535078.103.51$41,784
Sep 2010374072.633.98$27,164
Aug 2010629073.684.42$46,345
Jul 2010316072.554.74$22,926
Jun 2010320070.364.91$22,515
May 2010153071.124.24$10,881
Apr 2010206081.694.12$16,828
Mar 2010333078.394.39$26,104
Feb 2010183073.585.44$13,465
Jan 2010189074.365.96$14,054
Dec 2009186071.445.48$13,288
Nov 2009177074.593.75$13,202
Oct 2009191072.544.11$13,855
Sep 2009253065.543.06$16,582
Aug 2009250067.423.22$16,855
Jul 2009120061.133.46$7,336
Jun 2009321066.163.90$21,237
May 20092701954.743.93$14,854
Apr 2009226046.773.59$10,570
Mar 2009294042.144.06$12,389
Feb 2009294032.814.63$9,646
Jan 2009125035.865.37$4,483
Dec 200852037.105.98$1,929
Nov 2008105055.496.86$5,826
Oct 2008104075.246.92$7,825
Sep 20081240101.767.88$12,618
Aug 20081360114.228.48$15,534
Jul 20082570131.0811.39$33,688
Jun 2008930131.3313.03$12,214
May 20082400123.1711.57$29,561
Apr 20082370110.3110.45$26,143
Mar 20084760101.909.66$48,504
Feb 2008330092.538.77$30,535
Jan 2008524090.388.21$47,359
Dec 2007117088.337.30$10,335
Nov 20073314191.677.29$30,642
Oct 20075302182.856.92$44,056
Sep 200759119575.846.24$46,039
Aug 200746214169.066.39$32,806
Jul 200767337170.906.39$50,086
Jun 200771137962.007.55$46,943
May 200737117558.747.85$23,166
Apr 20072,54013,27559.617.81$255,023
Mar 20071646756.927.30$9,824
Feb 200719111055.108.22$11,428
Jan 200753317150.306.73$27,960
Dec 200628812656.656.92$17,187
Nov 20061335754.207.62$7,643
Oct 20060054.906.01$0
Sep 20060060.085.04$0
Aug 20060068.717.34$0
Jul 20060069.376.34$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Apr 2021 — as filed, then multipliedworked
Oil                    0 bbl  × $ 60.36 =         $0
Casinghead gas     5,773 Mcf  × $  2.76 =    $15,924

────────────────────────────────────────────────────
Month total                                  $15,924

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 01/O/14781 is the state's own key, not one this site invented.