ANDERSON, C. 2-H

Operated by TEXAS PETROLEUM INVESTMENT CO. (P-5 847710) in the DARST CREEK (EDWARDS) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Oil lease lease 14876District 01Field 23191666Hydrogen sulphide fieldOilSaveExport
Value, all time
$8.1 M
Nov 2007 – May 2026
Value, last 12 filed months
$444 k
at the published price for each month
Months reported
223
no gaps in the span
Streams
1
oil

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 82 leases and 544 wells, and the rule below applies to all of them.

Discovered
1960-09-01
as the register files it
Field class
Oil
the register's own label
Between wells
0 ft
minimum
From a lease line
150 ft
minimum

A drilling unit in this field needs at least 2 acres. The field rule took effect on 2009-11-24.

The register flags this field for hydrogen sulphide. That is a poisonous gas that occurs naturally in some formations. The flag is a property of the field as the Commission records it. It is not a measurement taken at this lease, and it is not a statement that gas is escaping anywhere.

The Commission's schedule remark for this field reads: ONTAL WELLS.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
OilDisposition102,851 bbl$8,083,743
Total$8,083,743

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 29.5785, -97.7695. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

29.57845, -97.76951 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
2,585 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 2,585 ft.

Completions filed
Dec 2023
1 of 1 wells

1 well

42-187335362H2,585 ftDec 2023

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (223)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

223 months

May 2026507106.413.05$53,950
Apr 202654498.932.87$53,818
Mar 202650389.753.15$45,144
Feb 202651663.503.75$32,766
Jan 202659759.138.00$35,301
Dec 202556356.664.41$31,900
Nov 202548458.593.93$28,358
Oct 202554559.383.30$32,362
Sep 202549262.743.08$30,868
Aug 202555463.933.01$35,417
Jul 202549566.743.32$33,036
Jun 202546766.483.13$31,046
May 202554260.553.23$32,818
Apr 202562962.363.54$39,224
Mar 202570067.704.27$47,390
Feb 202561470.884.34$43,520
Jan 202561774.324.28$45,855
Dec 202468568.993.12$47,258
Nov 202471169.052.20$49,095
Oct 202473171.372.28$52,171
Sep 202469969.612.36$48,657
Aug 202475875.632.06$57,328
Jul 202473479.932.15$58,669
Jun 202482378.082.63$64,260
May 202489778.812.20$70,693
Apr 202491384.451.66$77,103
Mar 20241,02080.301.55$81,906
Feb 20241,09476.091.78$83,242
Jan 20241,31173.023.30$95,729
Dec 20231,29571.262.61$92,282
Nov 2023077.892.81$0
Oct 2023085.443.09$0
Sep 2023089.042.74$0
Aug 2023080.522.67$0
Jul 2023074.852.64$0
Jun 2023068.962.26$0
May 2023070.622.23$0
Apr 2023078.122.24$0
Mar 2023072.852.39$0
Feb 2023075.112.47$0
Jan 2023076.533.39$0
Dec 2022076.415.73$0
Nov 2022085.005.65$0
Oct 2022087.185.86$0
Sep 2022084.888.16$0
Aug 2022094.529.13$0
Jul 20220101.587.54$0
Jun 20220115.097.98$0
May 20220109.378.43$0
Apr 20220104.226.84$0
Mar 20220108.885.08$0
Feb 2022091.054.86$0
Jan 2022081.844.54$0
Dec 2021071.323.90$0
Nov 2021077.435.24$0
Oct 2021079.795.71$0
Sep 2021069.865.35$0
Aug 2021066.024.22$0
Jul 2021070.783.98$0
Jun 2021069.493.38$0
May 2021063.483.02$0
Apr 2021060.362.76$0
Mar 2021061.302.72$0
Feb 2021057.805.55$0
Jan 2021050.412.81$0
Dec 2020044.642.68$0
Nov 2020038.772.71$0
Oct 2020036.972.48$0
Sep 2020037.091.99$0
Aug 2020039.982.39$0
Jul 2020038.371.83$0
Jun 2020034.901.69$0
May 2020016.921.81$0
Apr 2020014.751.80$0
Mar 2020030.341.86$0
Feb 2020049.881.98$0
Jan 2020057.252.09$0
Dec 2019059.012.30$0
Nov 2019055.302.75$0
Oct 2019053.472.42$0
Sep 2019055.052.66$0
Aug 2019053.112.30$0
Jul 2019056.272.46$0
Jun 2019052.782.49$0
May 2019058.482.74$0
Apr 2019062.632.75$0
Mar 2019056.803.06$0
Feb 2019050.852.79$0
Jan 2019046.033.23$0
Dec 2018046.594.19$0
Nov 2018052.934.24$0
Oct 2018061.443.40$0
Sep 2018059.543.11$0
Aug 2018059.403.07$0
Jul 2018065.142.93$0
Jun 201822060.183.08$13,240
May 201826765.382.90$17,456
Apr 201826063.842.90$16,598
Mar 201824161.222.79$14,754
Feb 201822761.782.77$14,024
Jan 201826762.874.01$16,786
Dec 201725857.272.92$14,776
Nov 201726355.423.12$14,575
Oct 201723449.292.98$11,534
Sep 201725847.523.09$12,260
Aug 201726445.373.00$11,978
Jul 201725743.873.09$11,275
Jun 201725642.493.09$10,877
May 201724745.373.26$11,206
Apr 201723447.933.21$11,216
Mar 201722946.772.98$10,710
Feb 201722450.452.95$11,301
Jan 201725949.413.42$12,797
Dec 201623948.763.72$11,654
Nov 201623342.492.64$9,900
Oct 201620546.193.09$9,469
Sep 201627641.553.10$11,468
Aug 201626141.442.92$10,816
Jul 201626641.622.92$11,071
Jun 201627245.352.69$12,335
May 201628942.521.99$12,288
Apr 201627636.561.99$10,091
Mar 201630933.011.79$10,200
Feb 201626126.472.06$6,909
Jan 201626427.352.36$7,220
Dec 201525632.362.00$8,284
Nov 201524538.792.17$9,504
Oct 201527443.552.43$11,933
Sep 201522142.992.76$9,501
Aug 201521140.162.87$8,474
Jul 201511948.152.95$5,730
Jun 201521556.152.88$12,072
May 201520455.212.96$11,263
Apr 201520049.822.71$9,964
Mar 201520342.892.93$8,707
Feb 201517244.662.98$7,682
Jan 201521343.433.10$9,251
Dec 201423454.693.59$12,797
Nov 201422770.464.25$15,994
Oct 201424478.303.90$19,105
Sep 201423886.164.05$20,506
Aug 201427989.394.04$24,940
Jul 201425696.564.18$24,719
Jun 201423998.164.74$23,460
May 201425394.734.73$23,967
Apr 201424495.944.81$23,409
Mar 201439095.895.06$37,397
Feb 201437297.406.19$36,233
Jan 201445890.404.86$41,403
Dec 201346991.824.35$43,064
Nov 201346788.853.74$41,493
Oct 201352797.423.78$51,340
Sep 2013529104.113.72$55,074
Aug 2013554104.253.52$57,755
Jul 2013564102.523.72$57,821
Jun 201358694.403.93$55,318
May 201367694.834.15$64,105
Apr 201368293.964.28$64,081
Mar 201363893.623.91$59,730
Feb 201355691.233.42$50,724
Jan 201363291.603.42$57,891
Dec 201259986.773.42$51,975
Nov 201259386.953.62$51,561
Oct 201260989.383.40$54,432
Sep 201260294.672.92$56,991
Aug 201264192.662.91$59,395
Jul 201261685.133.02$52,440
Jun 201263679.822.52$50,766
May 201256891.612.49$52,034
Apr 2012583101.652.00$59,262
Mar 2012585105.052.22$61,454
Feb 2012565101.102.57$57,122
Jan 201247098.092.73$46,102
Dec 201127896.873.24$26,930
Nov 201137095.723.31$35,416
Oct 201169384.983.65$58,891
Sep 201157983.623.99$48,416
Aug 201159483.404.15$49,540
Jul 201163194.144.52$59,402
Jun 201163792.904.64$59,177
May 201167298.134.40$65,943
Apr 2011668105.964.33$70,781
Mar 201164596.364.06$62,152
Feb 201159385.644.18$50,785
Jan 201177286.504.59$66,778
Dec 201071485.734.35$61,211
Nov 201067180.843.80$54,244
Oct 201074578.103.51$58,185
Sep 201077772.633.98$56,434
Aug 201079873.684.42$58,797
Jul 201084072.554.74$60,942
Jun 201081870.364.91$57,554
May 201088571.124.24$62,941
Apr 201090981.694.12$74,256
Mar 201091278.394.39$71,492
Feb 201089873.585.44$66,075
Jan 201089574.365.96$66,552
Dec 200996371.445.48$68,797
Nov 200991674.593.75$68,324
Oct 200982972.544.11$60,136
Sep 200983265.543.06$54,529
Aug 200993467.423.22$62,970
Jul 20091,17061.133.46$71,522
Jun 20091,18566.163.90$78,400
May 20091,21854.743.93$66,673
Apr 20091,20446.773.59$56,311
Mar 20091,26842.144.06$53,434
Feb 20091,20132.814.63$39,405
Jan 20091,38535.865.37$49,666
Dec 20081,53637.105.98$56,986
Nov 20081,61055.496.86$89,339
Oct 20081,66675.246.92$125,350
Sep 20081,757101.767.88$178,792
Aug 20081,914114.228.48$218,617
Jul 20081,905131.0811.39$249,707
Jun 20081,987131.3313.03$260,953
May 20081,181123.1711.57$145,464
Apr 20081,099110.3110.45$121,231
Mar 20081,760101.909.66$179,344
Feb 20082,07092.538.77$191,537
Jan 20082,44190.388.21$220,618
Dec 20071,76988.337.30$156,256
Nov 20071,48791.677.29$136,313

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Oil                  507 bbl  × $106.41 =    $53,950

────────────────────────────────────────────────────
Month total                                  $53,950

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 01/O/14876 is the state's own key, not one this site invented.