KURZ, BEE T., ETAL

Operated by DOWNING WELL SERVICE, INC. (P-5 102014) in the SOMERSET field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Oil lease lease 3219District 01Field 84560001OilCasinghead gasSaveExport
Value, all time
$1.1 M
Jan 1993 – May 2026
Value, last 12 filed months
$36 k
at the published price for each month
Months reported
401
no gaps in the span
Streams
2
oil, casinghead gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 1,033 leases and 5,137 wells, and the rule below applies to all of them.

Discovered
1911-12-31
as the register files it
Field class
Oil and gas
the register's own label
Between wells
330 ft
minimum
From a lease line
150 ft
minimum

A drilling unit in this field needs at least 2.05 acres. The field rule took effect on 1986-02-01.

The Commission's schedule remark for this field reads: RULES EFF. FOR SOMERSET FIELD 12-11-78.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
OilDisposition23,803 bbl$1,111,711
Casinghead gasProduction25 Mcf$4
Total$1,111,715

23 Mcf of this lease's gas, across 23 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (6)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 29.2324, -98.5603. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.2 miles. 1 well has no surveyed location and is left out of it.

29.23240, -98.56048 · centre of 5 wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
16.7%
1 of 6 wells
With a plug date
16.7%
1 of 6 wells
Median depth
1,298 ft
6 wells filed one
Completion to plug
35.1 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
116.7%
A plug date is filed
116.7%
BothOn the schedule and plugged. Neither fact cancels the other.
116.7%
NeitherNo plug date, and not on the schedule.
583.3%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

Between 1,265 and 1,312 ft, median 1,298 ft, over the 6 wells that filed a depth.

Completions filed
Jul 1980 – Sep 1980
3 of 6 wells; 3 filed none
Plug dates filed
Sep 2015
1 of 6 wells; 5 filed none

Last completion to plug: a median of 35.1 years across the 1 well that filed both dates, with the middle half between 35.1 years and 35.1 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

6 wells

42-0290233211,295 ft
42-0290233321,265 ft
42-0290233431,312 ft
42-0293108971,300 ftSep 1980
42-0293108861,300 ftAug 1980Sep 2015Yes
42-0293108751,295 ftJul 1980

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (401)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

401 months

May 202600106.413.05$0
Apr 2026163098.932.87$16,126
Mar 20260089.753.15$0
Feb 20260063.503.75$0
Jan 2026153059.138.00$9,047
Dec 20250056.664.41$0
Nov 20250058.593.93$0
Oct 20250059.383.30$0
Sep 2025168062.743.08$10,540
Aug 20250063.933.01$0
Jul 20250066.743.32$0
Jun 20250066.483.13$0
May 2025165060.553.23$9,991
Apr 20250062.363.54$0
Mar 20250067.704.27$0
Feb 2025164070.884.34$11,624
Jan 2025165074.324.28$12,263
Dec 20240068.993.12$0
Nov 20240069.052.20$0
Oct 20240071.372.28$0
Sep 20240069.612.36$0
Aug 20240075.632.06$0
Jul 20240079.932.15$0
Jun 2024162078.082.63$12,649
May 20240078.812.20$0
Apr 20240084.451.66$0
Mar 20240080.301.55$0
Feb 2024163076.091.78$12,403
Jan 20240073.023.30$0
Dec 20230071.262.61$0
Nov 20230077.892.81$0
Oct 20230085.443.09$0
Sep 20230089.042.74$0
Aug 2023162080.522.67$13,044
Jul 20230074.852.64$0
Jun 20230068.962.26$0
May 20230070.622.23$0
Apr 2023162078.122.24$12,655
Mar 20230072.852.39$0
Feb 20230075.112.47$0
Jan 20230076.533.39$0
Dec 20220076.415.73$0
Nov 2022157085.005.65$13,345
Oct 20220087.185.86$0
Sep 20220084.888.16$0
Aug 20220094.529.13$0
Jul 202200101.587.54$0
Jun 20221600115.097.98$18,414
May 202200109.378.43$0
Apr 202200104.226.84$0
Mar 202200108.885.08$0
Feb 20220091.054.86$0
Jan 2022159081.844.54$13,013
Dec 20210071.323.90$0
Nov 20210077.435.24$0
Oct 20210079.795.71$0
Sep 2021164069.865.35$11,457
Aug 20210066.024.22$0
Jul 20210070.783.98$0
Jun 20210069.493.38$0
May 2021158063.483.02$10,030
Apr 20210060.362.76$0
Mar 20210061.302.72$0
Feb 20210057.805.55$0
Jan 20210050.412.81$0
Dec 2020165044.642.68$7,366
Nov 20200038.772.71$0
Oct 20200036.972.48$0
Sep 20200037.091.99$0
Aug 20200039.982.39$0
Jul 20200038.371.83$0
Jun 20200034.901.69$0
May 20200016.921.81$0
Apr 20200114.751.80$2
Mar 20200130.341.86$2
Feb 202086049.881.98$4,290
Jan 20200057.252.09$0
Dec 20190059.012.30$0
Nov 20190055.302.75$0
Oct 20190053.472.42$0
Sep 20190055.052.66$0
Aug 20190053.112.30$0
Jul 20190056.272.46$0
Jun 20190052.782.49$0
May 20190058.482.74$0
Apr 20190062.632.75$0
Mar 20190056.803.06$0
Feb 20190050.852.79$0
Jan 20190046.033.23$0
Dec 20180046.594.19$0
Nov 20180052.934.24$0
Oct 20180061.443.40$0
Sep 20180059.543.11$0
Aug 20180059.403.07$0
Jul 201845065.142.93$2,931
Jun 2018164060.183.08$9,870
May 20180065.382.90$0
Apr 20180063.842.90$0
Mar 20180061.222.79$0
Feb 2018169061.782.77$10,441
Jan 20180062.874.01$0
Dec 20170057.272.92$0
Nov 20170055.423.12$0
Oct 2017168049.292.98$8,281
Sep 20170047.523.09$0
Aug 20170045.373.00$0
Jul 20170043.873.09$0
Jun 2017165042.493.09$7,011
May 20170045.373.26$0
Apr 20170047.933.21$0
Mar 20170046.772.98$0
Feb 2017163050.452.95$8,223
Jan 20170049.413.42$0
Dec 20160048.763.72$0
Nov 2016268042.492.64$11,387
Oct 20160046.193.09$0
Sep 20160041.553.10$0
Aug 2016174041.442.92$7,211
Jul 20160041.622.92$0
Jun 20160045.352.69$0
May 2016172042.521.99$7,313
Apr 20160036.561.99$0
Mar 2016172033.011.79$5,678
Feb 20160026.472.06$0
Jan 20160027.352.36$0
Dec 2015172032.362.00$5,566
Nov 20150038.792.17$0
Oct 20150043.552.43$0
Sep 2015170042.992.76$7,308
Aug 20150040.162.87$0
Jul 20150048.152.95$0
Jun 2015170056.152.88$9,546
May 20150055.212.96$0
Apr 20150049.822.71$0
Mar 2015167042.892.93$7,163
Feb 20150044.662.98$0
Jan 20150043.433.10$0
Dec 2014172054.693.59$9,407
Nov 20140070.464.25$0
Oct 20140078.303.90$0
Sep 20140086.164.05$0
Aug 2014165089.394.04$14,749
Jul 20140096.564.18$0
Jun 20140098.164.74$0
May 2014165094.734.73$15,630
Apr 20140095.944.81$0
Mar 20140095.895.06$0
Feb 2014169097.406.19$16,461
Jan 20140090.404.86$0
Dec 20130091.824.35$0
Nov 2013170088.853.74$15,105
Oct 20130097.423.78$0
Sep 201300104.113.72$0
Aug 20131730104.253.52$18,035
Jul 201300102.523.72$0
Jun 20130094.403.93$0
May 2013165094.834.15$15,647
Apr 20130093.964.28$0
Mar 20130093.623.91$0
Feb 2013154091.233.42$14,049
Jan 20130091.603.42$0
Dec 2012166086.773.42$14,404
Nov 20120086.953.62$0
Oct 20120089.383.40$0
Sep 2012172094.672.92$16,283
Aug 20120092.662.91$0
Jul 20120085.133.02$0
Jun 2012172079.822.52$13,729
May 20120091.612.49$0
Apr 201200101.652.00$0
Mar 20121730105.052.22$18,174
Feb 201200101.102.57$0
Jan 20120098.092.73$0
Dec 2011171096.873.24$16,565
Nov 20110095.723.31$0
Oct 20110084.983.65$0
Sep 2011172083.623.99$14,383
Aug 20110083.404.15$0
Jul 20110094.144.52$0
Jun 2011176092.904.64$16,350
May 20110098.134.40$0
Apr 201100105.964.33$0
Mar 2011172096.364.06$16,574
Feb 20110085.644.18$0
Jan 20110086.504.59$0
Dec 2010173085.734.35$14,831
Nov 20100080.843.80$0
Oct 20100078.103.51$0
Sep 2010173072.633.98$12,565
Aug 20100073.684.42$0
Jul 2010173072.554.74$12,551
Jun 20100070.364.91$0
May 20100071.124.24$0
Apr 2010172081.694.12$14,051
Mar 20100078.394.39$0
Feb 20100073.585.44$0
Jan 2010162074.365.96$12,046
Dec 20090071.445.48$0
Nov 20090074.593.75$0
Oct 2009174072.544.11$12,622
Sep 20090065.543.06$0
Aug 2009170067.423.22$11,461
Jul 20090061.133.46$0
Jun 20090066.163.90$0
May 2009173054.743.93$9,470
Apr 20090046.773.59$0
Mar 20090042.144.06$0
Feb 2009168032.814.63$5,512
Jan 20090035.865.37$0
Dec 20080037.105.98$0
Nov 2008165055.496.86$9,156
Oct 20080075.246.92$0
Sep 20081650101.767.88$16,790
Aug 200800114.228.48$0
Jul 200800131.0811.39$0
Jun 20081710131.3313.03$22,457
May 200800123.1711.57$0
Apr 200800110.3110.45$0
Mar 20081580101.909.66$16,100
Feb 20080092.538.77$0
Jan 2008163090.388.21$14,732
Dec 20070088.337.30$0
Nov 20070091.677.29$0
Oct 2007162082.856.92$13,422
Sep 20070075.846.24$0
Aug 2007162069.066.39$11,188
Jul 20070070.906.39$0
Jun 20070062.007.55$0
May 2007164058.747.85$9,633
Apr 20070059.617.81$0
Mar 2007161056.927.30$9,164
Feb 20070055.108.22$0
Jan 20070050.306.73$0
Dec 2006163056.656.92$9,234
Nov 20060054.207.62$0
Oct 2006160054.906.01$8,784
Sep 20060060.085.04$0
Aug 20060068.717.34$0
Jul 2006160069.376.34$11,099
Jun 20060066.286.38$0
May 2006160066.016.42$10,562
Apr 20060064.397.36$0
Mar 20060056.707.08$0
Feb 2006159057.597.75$9,157
Jan 20060060.598.93$0
Dec 20050054.9413.42$0
Nov 2005164054.6910.59$8,969
Oct 20050058.3413.80$0
Sep 20050061.4512.08$0
Aug 2005162061.519.80$9,965
Jul 20050055.697.84$0
Jun 20050052.337.38$0
May 2005161045.226.65$7,280
Apr 20050049.207.36$0
Mar 2005156050.377.15$7,858
Feb 20050045.226.31$0
Jan 20050043.166.32$0
Dec 2004160039.866.75$6,378
Nov 20040045.286.33$0
Oct 2004151049.706.52$7,505
Sep 20040043.245.28$0
Aug 2004159042.375.55$6,737
Jul 20040038.286.08$0
Jun 20040036.106.43$0
May 2004160037.486.49$5,997
Apr 20040034.475.86$0
Mar 2004160034.365.53$5,498
Feb 20040032.455.51$0
Jan 2004163032.036.30$5,221
Dec 20030030.266.30$0
Nov 2003164028.804.60$4,723
Oct 20030028.174.76$0
Sep 20030026.314.75$0
Aug 2003166029.765.13$4,940
Jul 20030029.415.17$0
Jun 2003167028.565.98$4,770
May 20030026.595.97$0
Apr 2003159026.675.41$4,241
Mar 20030031.146.10$0
Feb 20030033.487.93$0
Jan 2003159030.315.58$4,819
Dec 20020026.914.85$0
Nov 2002160024.664.14$3,946
Oct 20020026.464.23$0
Sep 2002163027.443.64$4,473
Aug 20020025.963.16$0
Jul 2002165024.583.06$4,056
Jun 20020023.733.34$0
May 2002162024.663.58$3,995
Apr 20020023.653.51$0
Mar 2002159022.003.10$3,498
Feb 20020018.222.38$0
Jan 20020017.172.38$0
Dec 2001154016.932.36$2,607
Nov 20010018.072.41$0
Oct 2001153019.782.53$3,026
Sep 20010024.262.25$0
Aug 2001164024.873.05$4,079
Jul 20010023.933.20$0
Jun 2001166024.563.82$4,077
May 20010025.524.31$0
Apr 2001156024.685.34$3,850
Mar 20010024.545.38$0
Feb 2001160027.755.77$4,440
Jan 20010027.478.40$0
Dec 2000159026.889.12$4,274
Nov 20000032.215.66$0
Oct 2000153031.235.15$4,778
Sep 20000031.875.19$0
Aug 2000159029.644.54$4,713
Jul 20000028.534.09$0
Jun 2000159029.304.40$4,659
May 20000027.263.68$0
Apr 2000160024.513.12$3,922
Mar 2000159028.422.86$4,519
Feb 20000027.622.73$0
Jan 2000163025.272.48$4,119
Dec 19990024.282.42$0
Nov 1999160023.192.43$3,710
Oct 19990020.982.80$0
Sep 19990021.752.62$0
Aug 1999162019.262.88$3,120
Jul 19990017.892.37$0
Jun 1999164015.942.36$2,614
May 19990015.792.32$0
Apr 1999325015.102.21$4,908
Mar 19990012.471.84$0
Feb 199916309.981.82$1,627
Jan 19990010.381.90$0
Dec 1998009.201.77$0
Nov 19980010.892.19$0
Oct 1998165012.421.97$2,049
Sep 19980012.592.08$0
Aug 1998155011.301.91$1,752
Jul 19980011.742.24$0
Jun 1998162011.242.24$1,821
May 19980012.622.21$0
Apr 1998161013.042.51$2,099
Mar 19980012.802.31$0
Feb 1998159013.952.30$2,218
Jan 19980014.702.15$0
Dec 1997164016.322.41$2,676
Nov 1997165018.193.09$3,001
Oct 19970019.253.15$0
Sep 1997161017.742.95$2,856
Aug 19970017.862.55$0
Jul 1997174017.582.25$3,059
Jun 1997159017.242.26$2,741
May 19970018.972.31$0
Apr 1997165017.882.08$2,950
Mar 19970018.951.94$0
Feb 19970020.492.21$0
Jan 1997162023.483.54$3,804
Dec 19960023.32$0
Nov 1996163021.97$3,581
Oct 19960023.31$0
Sep 1996158022.22$3,511
Aug 19960020.26$0
Jul 1996171019.55$3,343
Jun 19960018.73$0
May 1996162019.43$3,148
Apr 19960021.51$0
Mar 1996171019.38$3,314
Feb 19960016.98$0
Jan 1996168017.07$2,868
Dec 19950017.19$0
Nov 1995155016.00$2,480
Oct 19950015.43$0
Sep 1995162016.18$2,621
Aug 19950015.92$0
Jul 1995161015.24$2,454
Jun 19950016.41$0
May 1995155017.56$2,722
Apr 19950017.73$0
Mar 1995145016.44$2,384
Feb 1995158016.58$2,620
Jan 19950015.92$0
Dec 1994171015.03$2,570
Nov 19940115.90$0
Oct 1994164115.58$2,555
Sep 19940115.29$0
Aug 1994166116.13$2,678
Jul 19940117.56$0
Jun 1994160117.09$2,734
May 19940115.88$0
Apr 1994166114.14$2,347
Mar 19940112.46$0
Feb 1994161112.50$2,013
Jan 19940112.66$0
Dec 1993168112.33$2,071
Nov 19930114.49$0
Oct 1993164115.85$2,599
Sep 19930115.03$0
Aug 1993165115.66$2,584
Jul 19930115.46$0
Jun 1993164116.79$2,754
May 19930117.68$0
Apr 1993158118.05$2,852
Mar 1993157118.14$2,848
Feb 19930117.90$0
Jan 1993166116.93$2,810

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Apr 2026 — as filed, then multipliedworked
Oil                  163 bbl  × $ 98.93 =    $16,126
Casinghead gas         0 Mcf  × $  2.87 =         $0

────────────────────────────────────────────────────
Month total                                  $16,126

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 01/O/3219 is the state's own key, not one this site invented.