GRUBBS & HOLLOWAY

Operated by RLU OIL & GAS, INC. (P-5 714274) in the FAIRFIELD field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Oil lease lease 4742District 01Field 30007001OilCasinghead gasSave
Value, all time
$124 k
Jan 1993 – Jun 2022
Value, last 12 filed months
$5 k
at the published price for each month
Months reported
354
no gaps in the span
Streams
2
oil, casinghead gas

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
OilDisposition2,719 bbl$123,166
Casinghead gasProduction272 Mcf$1,152
Total$124,318

20 Mcf of this lease's gas, across 20 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (13)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 29.2491, -98.8878. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.9 miles.

29.24504, -98.89211 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
13 of 13 wells
With a plug date
100.0%
13 of 13 wells
Median depth
386 ft
13 wells filed one
Completion to plug
18.8 years
median over 10 wells

What the state filed about each well

On the RRC proration schedule
13100.0%
A plug date is filed
13100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
13100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

0k
2k
4k
6k
8k
10k
12k
15k
20k+

Total depth in feet, 13 of 13 wells. Median 386 ft, with the middle half between 210 and 400 ft; the shallowest is 40 ft and the deepest 1,522 ft. The median is published rather than the mean, because a single mis-keyed depth moves a mean and cannot move a median.

When they were last completed

70s
80s
90s
00s

Last completion by decade, 10 of 13 wells, Mar 1976 – Jan 2004. This is the LAST completion filed on each wellbore, not the first — a well recompleted in 2019 counts once, in the 2010s.

Completions filed
Mar 1976 – Jan 2004
10 of 13 wells; 3 filed none
Plug dates filed
Oct 2001 – Jun 2021
13 of 13 wells

Last completion to plug: a median of 18.8 years across the 10 wells that filed both dates, with the middle half between 16.7 years and 25.6 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

13 wells

42-325333741J80 ftOct 2001Yes
42-325334731K40 ftOct 2001Yes
42-325335341L40 ftOct 2001Yes
42-3253358515281 ftJan 2004Nov 2005Yes
42-3253358414307 ftJan 2004Jun 2021Yes
42-325332021I400 ftOct 1985Oct 2001Yes
42-325329821G390 ftMar 1985Oct 2001Yes
42-325806511C395 ftJan 1985Jun 2021Yes
42-325806521E210 ftJan 1985Oct 2001Yes
42-325324951F386 ftNov 1982Jun 2021Yes
42-325321171D506 ftOct 1981Oct 2001Yes
42-3253007711,522 ftMar 1976Oct 2001Yes
42-325804911 B1,522 ftMar 1976Oct 2001Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (354)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

354 months

Jun 202200115.097.98$0
May 202200109.378.43$0
Apr 2022520104.226.84$5,419
Mar 202200108.885.08$0
Feb 20220091.054.86$0
Jan 20220081.844.54$0
Dec 20210071.323.90$0
Nov 20210077.435.24$0
Oct 20210079.795.71$0
Sep 20210069.865.35$0
Aug 20210066.024.22$0
Jul 20210070.783.98$0
Jun 20210069.493.38$0
May 20210063.483.02$0
Apr 202115060.362.76$905
Mar 20210061.302.72$0
Feb 20210057.805.55$0
Jan 20210050.412.81$0
Dec 20200044.642.68$0
Nov 20200038.772.71$0
Oct 20200036.972.48$0
Sep 202028037.091.99$1,039
Aug 20200039.982.39$0
Jul 202034038.371.83$1,305
Jun 20200034.901.69$0
May 20200016.921.81$0
Apr 20200114.751.80$2
Mar 202029130.341.86$882
Feb 20200149.881.98$2
Jan 20200157.252.09$2
Dec 20190159.012.30$2
Nov 20190155.302.75$3
Oct 201972153.472.42$3,852
Sep 20190155.052.66$3
Aug 20190153.112.30$2
Jul 20190156.272.46$2
Jun 20190152.782.49$2
May 20190158.482.74$3
Apr 201970162.632.75$4,387
Mar 20190156.803.06$3
Feb 20190150.852.79$3
Jan 20190146.033.23$3
Dec 20180146.594.19$4
Nov 20180152.934.24$4
Oct 201833161.443.40$2,031
Sep 20180159.543.11$3
Aug 201830159.403.07$1,785
Jul 20180165.142.93$3
Jun 20180160.183.08$3
May 201832165.382.90$2,095
Apr 20180163.842.90$3
Mar 201832161.222.79$1,962
Feb 20180161.782.77$3
Jan 20180162.874.01$4
Dec 20170157.272.92$3
Nov 201734155.423.12$1,887
Oct 20170149.292.98$3
Sep 20170147.523.09$3
Aug 20170145.373.00$3
Jul 201768143.873.09$2,986
Jun 20170142.493.09$3
May 20170145.373.26$3
Apr 20170147.933.21$3
Mar 20170146.772.98$3
Feb 20170150.452.95$3
Jan 201753149.413.42$2,622
Dec 20160148.763.72$4
Nov 20160142.492.64$3
Oct 20160146.193.09$3
Sep 20160141.553.10$3
Aug 201612141.442.92$500
Jul 20160141.622.92$3
Jun 20160145.352.69$3
May 201611142.521.99$470
Apr 20160136.561.99$2
Mar 201610133.011.79$332
Feb 20160126.472.06$2
Jan 20168127.352.36$221
Dec 20150132.362.00$2
Nov 20159138.792.17$351
Oct 20150143.552.43$2
Sep 201511142.992.76$476
Aug 20150140.162.87$3
Jul 201510148.152.95$484
Jun 20150156.152.88$3
May 20150155.212.96$3
Apr 201511149.822.71$551
Mar 20150142.892.93$3
Feb 201511144.662.98$494
Jan 20150143.433.10$3
Dec 20140154.693.59$4
Nov 201411170.464.25$779
Oct 201412178.303.90$944
Sep 20140186.164.05$4
Aug 201411189.394.04$987
Jul 20140196.564.18$4
Jun 20140198.164.74$5
May 201411194.734.73$1,047
Apr 201412195.944.81$1,156
Mar 20140195.895.06$5
Feb 20140197.406.19$6
Jan 201412190.404.86$1,090
Dec 20130191.824.35$4
Nov 20130188.853.74$4
Oct 201312197.423.78$1,173
Sep 201301104.113.72$4
Aug 2013111104.253.52$1,150
Jul 201301102.523.72$4
Jun 201311194.403.93$1,042
May 201311194.834.15$1,047
Apr 20130193.964.28$4
Mar 201311193.623.91$1,034
Feb 20130191.233.42$3
Jan 201311191.603.42$1,011
Dec 20120186.773.42$3
Nov 201211186.953.62$960
Oct 20120189.383.40$3
Sep 201211194.672.92$1,044
Aug 201211192.662.91$1,022
Jul 20120185.133.02$3
Jun 201212179.822.52$960
May 20120191.612.49$2
Apr 2012121101.652.00$1,222
Mar 201201105.052.22$2
Feb 2012141101.102.57$1,418
Jan 201213198.092.73$1,278
Dec 20110196.873.24$3
Nov 20110195.723.31$3
Oct 201111184.983.65$938
Sep 20110183.623.99$4
Aug 201112183.404.15$1,005
Jul 201112194.144.52$1,134
Jun 201110192.904.64$934
May 20110198.134.40$4
Apr 2011121105.964.33$1,276
Mar 20110196.364.06$4
Feb 201110185.644.18$861
Jan 20110186.504.59$5
Dec 201012185.734.35$1,033
Nov 20100180.843.80$4
Oct 201012178.103.51$941
Sep 201012172.633.98$876
Aug 20100173.684.42$4
Jul 201010172.554.74$730
Jun 201011170.364.91$779
May 20100171.124.24$4
Apr 201012181.694.12$984
Mar 201011178.394.39$867
Feb 20100173.585.44$5
Jan 201012174.365.96$898
Dec 20090171.445.48$5
Nov 200911174.593.75$824
Oct 200911172.544.11$802
Sep 20090165.543.06$3
Aug 200911167.423.22$745
Jul 20090161.133.46$3
Jun 200911166.163.90$732
May 20090154.743.93$4
Apr 200910146.773.59$471
Mar 200911142.144.06$468
Feb 200910132.814.63$333
Jan 20090135.865.37$5
Dec 20080137.105.98$6
Nov 200812155.496.86$673
Oct 20080175.246.92$7
Sep 2008121101.767.88$1,229
Aug 200801114.228.48$8
Jul 200801131.0811.39$11
Jun 2008121131.3313.03$1,589
May 200801123.1711.57$12
Apr 2008121110.3110.45$1,334
Mar 200801101.909.66$10
Feb 200812192.538.77$1,119
Jan 20080190.388.21$8
Dec 200723188.337.30$2,039
Nov 20070191.677.29$7
Oct 20070182.856.92$7
Sep 200712175.846.24$916
Aug 20070169.066.39$6
Jul 200713170.906.39$928
Jun 200712162.007.55$752
May 20070158.747.85$8
Apr 20070159.617.81$8
Mar 200712156.927.30$690
Feb 20070155.108.22$8
Jan 200712150.306.73$610
Dec 200612156.656.92$687
Nov 20060154.207.62$8
Oct 200612154.906.01$665
Sep 20060160.085.04$5
Aug 200612168.717.34$832
Jul 20060169.376.34$6
Jun 200624166.286.38$1,597
May 20060166.016.42$6
Apr 200611164.397.36$716
Mar 20060156.707.08$7
Feb 200611157.597.75$641
Jan 20060160.598.93$9
Dec 200512154.9413.42$673
Nov 20050154.6910.59$11
Oct 200510158.3413.80$597
Sep 200511161.4512.08$688
Aug 20050161.519.80$10
Jul 20050155.697.84$8
Jun 200511152.337.38$583
May 200512145.226.65$549
Apr 200513149.207.36$647
Mar 20050150.377.15$7
Feb 200512145.226.31$549
Jan 200513143.166.32$567
Dec 20040139.866.75$7
Nov 20040145.286.33$6
Oct 200411149.706.52$553
Sep 200412143.245.28$524
Aug 20040142.375.55$6
Jul 200411138.286.08$427
Jun 200412136.106.43$440
May 200412137.486.49$456
Apr 200423134.475.86$799
Mar 20040134.365.53$6
Feb 20040132.455.51$6
Jan 200411132.036.30$359
Dec 200312130.266.30$369
Nov 200311128.804.60$321
Oct 20030128.174.76$5
Sep 200312126.314.75$320
Aug 20030129.765.13$5
Jul 200311129.415.17$329
Jun 200311128.565.98$320
May 200312126.595.97$325
Apr 200312126.675.41$325
Mar 20030131.146.10$6
Feb 200322133.487.93$744
Jan 20030130.315.58$6
Dec 200211126.914.85$301
Nov 200212124.664.14$300
Oct 200211126.464.23$295
Sep 20020127.443.64$4
Aug 200211125.963.16$289
Jul 200211124.583.06$273
Jun 200212123.733.34$288
May 20029124.663.58$226
Apr 200210123.653.51$240
Mar 20020122.003.10$3
Feb 20020118.222.38$2
Jan 20020117.172.38$2
Dec 20010116.932.36$2
Nov 20010118.072.41$2
Oct 2001147119.782.53$2,910
Sep 200181024.262.25$1,965
Aug 20010024.873.05$0
Jul 20010023.933.20$0
Jun 20010024.563.82$0
May 20010125.524.31$4
Apr 20010124.685.34$5
Mar 20010124.545.38$5
Feb 20010127.755.77$6
Jan 20010127.478.40$8
Dec 20000126.889.12$9
Nov 20000132.215.66$6
Oct 20000131.235.15$5
Sep 20000131.875.19$5
Aug 20000129.644.54$5
Jul 20000128.534.09$4
Jun 20000129.304.40$4
May 20000127.263.68$4
Apr 20000124.513.12$3
Mar 20000128.422.86$3
Feb 20000127.622.73$3
Jan 20000125.272.48$2
Dec 19990124.282.42$2
Nov 19990123.192.43$2
Oct 19990120.982.80$3
Sep 19990121.752.62$3
Aug 19990119.262.88$3
Jul 19990117.892.37$2
Jun 19990115.942.36$2
May 19990115.792.32$2
Apr 19990115.102.21$2
Mar 19990112.471.84$2
Feb 1999019.981.82$2
Jan 19990110.381.90$2
Dec 1998009.201.77$0
Nov 19980010.892.19$0
Oct 19980012.421.97$0
Sep 19980012.592.08$0
Aug 19980011.301.91$0
Jul 19980011.742.24$0
Jun 19980011.242.24$0
May 19980012.622.21$0
Apr 19980013.042.51$0
Mar 19980012.802.31$0
Feb 19980013.952.30$0
Jan 19980014.702.15$0
Dec 19970016.322.41$0
Nov 19970018.193.09$0
Oct 19970019.253.15$0
Sep 19970017.742.95$0
Aug 19970017.862.55$0
Jul 19970017.582.25$0
Jun 19970017.242.26$0
May 19970018.972.31$0
Apr 19970017.882.08$0
Mar 19970018.951.94$0
Feb 19970020.492.21$0
Jan 19970023.483.54$0
Dec 19960023.32$0
Nov 19960021.97$0
Oct 199686023.31$2,005
Sep 19960022.22$0
Aug 19960020.26$0
Jul 19960019.55$0
Jun 19960018.73$0
May 19960019.43$0
Apr 19960021.51$0
Mar 19960019.38$0
Feb 19960016.98$0
Jan 19960017.07$0
Dec 19950017.19$0
Nov 1995100016.00$1,600
Oct 19950015.43$0
Sep 19950016.18$0
Aug 19950015.92$0
Jul 19950015.24$0
Jun 19950016.41$0
May 19950017.56$0
Apr 1995136017.73$2,411
Mar 19950016.44$0
Feb 19950016.58$0
Jan 19950015.92$0
Dec 19940015.03$0
Nov 19940015.90$0
Oct 19940015.58$0
Sep 19940015.29$0
Aug 19940116.13$0
Jul 19940117.56$0
Jun 19940117.09$0
May 1994141115.88$2,239
Apr 19940114.14$0
Mar 19940112.46$0
Feb 19940112.50$0
Jan 19940112.66$0
Dec 19930112.33$0
Nov 19930114.49$0
Oct 19930115.85$0
Sep 1993154115.03$2,315
Aug 19930115.66$0
Jul 19930115.46$0
Jun 19930116.79$0
May 1993143117.68$2,528
Apr 19930118.05$0
Mar 19930118.14$0
Feb 19930117.90$0
Jan 19930116.93$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Apr 2022 — as filed, then multipliedworked
Oil                   52 bbl  × $104.22 =     $5,419
Casinghead gas         0 Mcf  × $  6.84 =         $0

────────────────────────────────────────────────────
Month total                                   $5,419

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 01/O/4742 is the state's own key, not one this site invented.