DENMAN -B-

Operated by TEXAS PETROLEUM INVESTMENT CO. (P-5 847710) in the DARST CREEK (EDWARDS) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Oil lease lease 6114District 01Field 23191666Hydrogen sulphide fieldOilCasinghead gasSaveExport
Value, all time
$248 k
Jan 1993 – May 2013
Value, last 12 filed months
$0
at the published price for each month
Months reported
245
no gaps in the span
Streams
2
oil, casinghead gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 82 leases and 544 wells, and the rule below applies to all of them.

Discovered
1960-09-01
as the register files it
Field class
Oil
the register's own label
Between wells
0 ft
minimum
From a lease line
150 ft
minimum

A drilling unit in this field needs at least 2 acres. The field rule took effect on 2009-11-24.

The register flags this field for hydrogen sulphide. That is a poisonous gas that occurs naturally in some formations. The flag is a property of the field as the Commission records it. It is not a measurement taken at this lease, and it is not a statement that gas is escaping anywhere.

The Commission's schedule remark for this field reads: ONTAL WELLS.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
OilDisposition7,501 bbl$247,727
Casinghead gasProduction13 Mcf$14
Total$247,742

7 Mcf of this lease's gas, across 7 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (3)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 29.5579, -97.7910. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.1 miles.

29.55791, -97.79109 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
3 of 3 wells
With a plug date
100.0%
3 of 3 wells
Median depth
2,685 ft
3 wells filed one
Completion to plug
23.3 years
median over 3 wells

What the state filed about each well

On the RRC proration schedule
3100.0%
A plug date is filed
3100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
3100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

Between 2,660 and 2,830 ft, median 2,685 ft, over the 3 wells that filed a depth.

Completions filed
Aug 1981 – Nov 1988
3 of 3 wells
Plug dates filed
Feb 1995 – Mar 2012
3 of 3 wells

Last completion to plug: a median of 23.3 years across the 3 wells that filed both dates, with the middle half between 18.0 years and 27.0 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

3 wells

42-1873107712,685 ftNov 1988Mar 2012Yes
42-1873206532,830 ftJun 1982Feb 1995Yes
42-1873177222,660 ftAug 1981Mar 2012Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (245)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

245 months

May 20130094.834.15$0
Apr 20130093.964.28$0
Mar 20130093.623.91$0
Feb 20130091.233.42$0
Jan 20130091.603.42$0
Dec 20120086.773.42$0
Nov 20120086.953.62$0
Oct 20120089.383.40$0
Sep 20120094.672.92$0
Aug 20120092.662.91$0
Jul 20120085.133.02$0
Jun 20120079.822.52$0
May 20120091.612.49$0
Apr 201200101.652.00$0
Mar 201200105.052.22$0
Feb 201200101.102.57$0
Jan 20120098.092.73$0
Dec 20110096.873.24$0
Nov 20110095.723.31$0
Oct 20110084.983.65$0
Sep 20110083.623.99$0
Aug 20110083.404.15$0
Jul 20110094.144.52$0
Jun 20110092.904.64$0
May 20110098.134.40$0
Apr 201100105.964.33$0
Mar 20110096.364.06$0
Feb 20110085.644.18$0
Jan 20110086.504.59$0
Dec 20100085.734.35$0
Nov 20100080.843.80$0
Oct 20100078.103.51$0
Sep 20100072.633.98$0
Aug 20103073.684.42$221
Jul 20100072.554.74$0
Jun 20100070.364.91$0
May 20100071.124.24$0
Apr 20100081.694.12$0
Mar 20100078.394.39$0
Feb 20100073.585.44$0
Jan 20100074.365.96$0
Dec 20090071.445.48$0
Nov 20090074.593.75$0
Oct 200927072.544.11$1,959
Sep 200931065.543.06$2,032
Aug 200932067.423.22$2,157
Jul 200937061.133.46$2,262
Jun 200934066.163.90$2,249
May 200935054.743.93$1,916
Apr 200931046.773.59$1,450
Mar 200932042.144.06$1,348
Feb 200935032.814.63$1,148
Jan 200947035.865.37$1,685
Dec 200850037.105.98$1,855
Nov 200833055.496.86$1,831
Oct 20085075.246.92$376
Sep 2008430101.767.88$4,376
Aug 2008350114.228.48$3,998
Jul 2008200131.0811.39$2,622
Jun 2008420131.3313.03$5,516
May 2008480123.1711.57$5,912
Apr 2008460110.3110.45$5,074
Mar 2008500101.909.66$5,095
Feb 200849092.538.77$4,534
Jan 200852090.388.21$4,700
Dec 200751088.337.30$4,505
Nov 200749091.677.29$4,492
Oct 200754082.856.92$4,474
Sep 200754075.846.24$4,095
Aug 200752069.066.39$3,591
Jul 200748070.906.39$3,403
Jun 200748062.007.55$2,976
May 200739058.747.85$2,291
Apr 200745059.617.81$2,682
Mar 200740056.927.30$2,277
Feb 200742055.108.22$2,314
Jan 200749050.306.73$2,465
Dec 200649056.656.92$2,776
Nov 200640054.207.62$2,168
Oct 200656054.906.01$3,074
Sep 200656060.085.04$3,364
Aug 200644068.717.34$3,023
Jul 200629069.376.34$2,012
Jun 200618066.286.38$1,193
May 200636066.016.42$2,376
Apr 200639064.397.36$2,511
Mar 200649056.707.08$2,778
Feb 200640057.597.75$2,304
Jan 200635060.598.93$2,121
Dec 200578054.9413.42$4,285
Nov 200577054.6910.59$4,211
Oct 200534058.3413.80$1,984
Sep 200556061.4512.08$3,441
Aug 200551061.519.80$3,137
Jul 200522055.697.84$1,225
Jun 20054052.337.38$209
May 200525045.226.65$1,131
Apr 20050049.207.36$0
Mar 20050050.377.15$0
Feb 20050045.226.31$0
Jan 20050043.166.32$0
Dec 20040039.866.75$0
Nov 20040045.286.33$0
Oct 20040049.706.52$0
Sep 20040043.245.28$0
Aug 20040042.375.55$0
Jul 20040038.286.08$0
Jun 20040036.106.43$0
May 20040037.486.49$0
Apr 20040034.475.86$0
Mar 20040034.365.53$0
Feb 20040032.455.51$0
Jan 20040032.036.30$0
Dec 20030030.266.30$0
Nov 20030028.804.60$0
Oct 20030028.174.76$0
Sep 20030026.314.75$0
Aug 20030029.765.13$0
Jul 20030029.415.17$0
Jun 20030028.565.98$0
May 20030026.595.97$0
Apr 20030026.675.41$0
Mar 20030031.146.10$0
Feb 20030033.487.93$0
Jan 20030030.315.58$0
Dec 20020026.914.85$0
Nov 20020024.664.14$0
Oct 20020026.464.23$0
Sep 20020027.443.64$0
Aug 20020025.963.16$0
Jul 20020024.583.06$0
Jun 20020023.733.34$0
May 20020024.663.58$0
Apr 20020023.653.51$0
Mar 20020022.003.10$0
Feb 20020018.222.38$0
Jan 20020017.172.38$0
Dec 20010016.932.36$0
Nov 20010018.072.41$0
Oct 20010019.782.53$0
Sep 20010024.262.25$0
Aug 20010024.873.05$0
Jul 20010023.933.20$0
Jun 20010024.563.82$0
May 20010025.524.31$0
Apr 20010024.685.34$0
Mar 20010024.545.38$0
Feb 20010027.755.77$0
Jan 20010027.478.40$0
Dec 20000026.889.12$0
Nov 20000032.215.66$0
Oct 20000031.235.15$0
Sep 20000031.875.19$0
Aug 20000029.644.54$0
Jul 20000028.534.09$0
Jun 20000029.304.40$0
May 20000027.263.68$0
Apr 20000024.513.12$0
Mar 20000028.422.86$0
Feb 20000027.622.73$0
Jan 20000025.272.48$0
Dec 19990024.282.42$0
Nov 19990023.192.43$0
Oct 19990020.982.80$0
Sep 19990021.752.62$0
Aug 19990019.262.88$0
Jul 19990017.892.37$0
Jun 19990015.942.36$0
May 19990015.792.32$0
Apr 19990015.102.21$0
Mar 19990012.471.84$0
Feb 1999009.981.82$0
Jan 19990010.381.90$0
Dec 1998009.201.77$0
Nov 19980010.892.19$0
Oct 19980012.421.97$0
Sep 19980012.592.08$0
Aug 19980011.301.91$0
Jul 19980011.742.24$0
Jun 19980011.242.24$0
May 19980012.622.21$0
Apr 19980013.042.51$0
Mar 19980012.802.31$0
Feb 19980013.952.30$0
Jan 19980014.702.15$0
Dec 19970016.322.41$0
Nov 199776018.193.09$1,382
Oct 19970019.253.15$0
Sep 199721117.742.95$375
Aug 199752117.862.55$931
Jul 199784117.582.25$1,479
Jun 199789117.242.26$1,537
May 1997179118.972.31$3,398
Apr 199792117.882.08$1,647
Mar 1997191018.951.94$3,619
Feb 199796020.492.21$1,967
Jan 1997100023.483.54$2,348
Dec 199695023.32$2,215
Nov 1996144021.97$3,164
Oct 199670023.31$1,632
Sep 199670022.22$1,555
Aug 1996120020.26$2,431
Jul 199665019.55$1,271
Jun 199665018.73$1,217
May 1996136019.43$2,642
Apr 199670021.51$1,506
Mar 199675019.38$1,454
Feb 1996162016.98$2,751
Jan 199680017.07$1,366
Dec 199572017.19$1,238
Nov 1995165016.00$2,640
Oct 199584015.43$1,296
Sep 1995165016.18$2,670
Aug 199572015.92$1,146
Jul 199577015.24$1,173
Jun 1995159016.41$2,609
May 19950017.56$0
Apr 1995166017.73$2,943
Mar 1995176016.44$2,893
Feb 19950016.58$0
Jan 1995144015.92$2,292
Dec 1994159015.03$2,390
Nov 1994104015.90$1,654
Oct 19940015.58$0
Sep 19940015.29$0
Aug 19940016.13$0
Jul 19940017.56$0
Jun 19940017.09$0
May 19940015.88$0
Apr 19940014.14$0
Mar 19940012.46$0
Feb 19940012.50$0
Jan 19940012.66$0
Dec 19930012.33$0
Nov 19930014.49$0
Oct 19930015.85$0
Sep 199327015.03$406
Aug 19930015.66$0
Jul 1993128115.46$1,979
Jun 1993154116.79$2,586
May 1993277117.68$4,897
Apr 1993194118.05$3,502
Mar 1993206118.14$3,737
Feb 1993208117.90$3,723
Jan 1993406116.93$6,874

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Aug 2010 — as filed, then multipliedworked
Oil                    3 bbl  × $ 73.68 =       $221
Casinghead gas         0 Mcf  × $  4.42 =         $0

────────────────────────────────────────────────────
Month total                                     $221

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 01/O/6114 is the state's own key, not one this site invented.