KOLLODZIEJ

Operated by BODDEN PRODUCTION (P-5 78315) in the MARCELINA CREEK (AUSTIN CHALK) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Oil lease lease 7824District 01Field 57367500Hydrogen sulphide fieldOilCasinghead gasSaveExport
Value, all time
$1.3 M
Jan 1993 – Jan 2021
Value, last 12 filed months
$5 k
at the published price for each month
Months reported
337
no gaps in the span
Streams
2
oil, casinghead gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 164 leases and 198 wells, and the rule below applies to all of them.

Discovered
1980-10-09
as the register files it
Field class
Oil
the register's own label
Between wells
1,200 ft
minimum
From a lease line
467 ft
minimum

A drilling unit in this field needs at least 80 acres.

The register flags this field for hydrogen sulphide. That is a poisonous gas that occurs naturally in some formations. The flag is a property of the field as the Commission records it. It is not a measurement taken at this lease, and it is not a statement that gas is escaping anywhere.

The Commission's schedule remark for this field reads: 80 ACRES OP. 3250 DIAG.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
OilDisposition30,922 bbl$1,322,865
Casinghead gasProduction293 Mcf$987
Total$1,323,853

91 Mcf of this lease's gas, across 13 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 29.0055, -98.1094. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

29.00554, -98.10937 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
10,308 ft
1 wells filed one
Completion to plug
29.7 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 10,308 ft.

Completions filed
Aug 1990
1 of 1 wells
Plug dates filed
Apr 2020
1 of 1 wells

Last completion to plug: a median of 29.7 years across the 1 well that filed both dates, with the middle half between 29.7 years and 29.7 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-49331036110,308 ftAug 1990Apr 2020Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (337)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

337 months

Jan 20210050.412.81$0
Dec 20200044.642.68$0
Nov 20200038.772.71$0
Oct 2020130036.972.48$4,806
Sep 20200037.091.99$0
Aug 20200039.982.39$0
Jul 20200038.371.83$0
Jun 20200034.901.69$0
May 20200016.921.81$0
Apr 20200014.751.80$0
Mar 20200030.341.86$0
Feb 20200049.881.98$0
Jan 20200057.252.09$0
Dec 20190059.012.30$0
Nov 20190055.302.75$0
Oct 20190053.472.42$0
Sep 20190055.052.66$0
Aug 20190053.112.30$0
Jul 20190056.272.46$0
Jun 20190052.782.49$0
May 20190058.482.74$0
Apr 20190062.632.75$0
Mar 20190056.803.06$0
Feb 20190050.852.79$0
Jan 20190046.033.23$0
Dec 20180046.594.19$0
Nov 20180052.934.24$0
Oct 20180061.443.40$0
Sep 20180059.543.11$0
Aug 20180059.403.07$0
Jul 20180065.142.93$0
Jun 20180060.183.08$0
May 20180065.382.90$0
Apr 20180063.842.90$0
Mar 20180061.222.79$0
Feb 20180061.782.77$0
Jan 20180062.874.01$0
Dec 20170057.272.92$0
Nov 20170055.423.12$0
Oct 20170049.292.98$0
Sep 2017361147.523.09$17,158
Aug 2017179145.373.00$8,124
Jul 2017512143.873.09$22,465
Jun 20171,078142.493.09$45,807
May 20171,617145.373.26$73,367
Apr 2017367147.933.21$17,594
Mar 20170146.772.98$3
Feb 20170150.452.95$3
Jan 20170049.413.42$0
Dec 2016162048.763.72$7,899
Nov 20160142.492.64$3
Oct 20160146.193.09$3
Sep 20160141.553.10$3
Aug 20160141.442.92$3
Jul 20160141.622.92$3
Jun 20160145.352.69$3
May 2016160142.521.99$6,805
Apr 20160136.561.99$2
Mar 20160133.011.79$2
Feb 20160126.472.06$2
Jan 20160127.352.36$2
Dec 2015166132.362.00$5,374
Nov 20150138.792.17$2
Oct 20150143.552.43$2
Sep 20150142.992.76$3
Aug 2015164140.162.87$6,589
Jul 20150148.152.95$3
Jun 2015168156.152.88$9,436
May 20150155.212.96$3
Apr 20150149.822.71$3
Mar 2015179142.892.93$7,680
Feb 20150144.662.98$3
Jan 20150143.433.10$3
Dec 20140154.693.59$4
Nov 2014346170.464.25$24,383
Oct 2014503178.303.90$39,389
Sep 20140186.164.05$4
Aug 20140189.394.04$4
Jul 20140096.564.18$0
Jun 20140198.164.74$5
May 20140194.734.73$5
Apr 2014165195.944.81$15,835
Mar 20140195.895.06$5
Feb 20140097.406.19$0
Jan 2014170190.404.86$15,373
Dec 20130191.824.35$4
Nov 20130088.853.74$0
Oct 2013162197.423.78$15,786
Sep 201301104.113.72$4
Aug 201301104.253.52$4
Jul 201301102.523.72$4
Jun 2013151194.403.93$14,258
May 20130194.834.15$4
Apr 2013163193.964.28$15,320
Mar 20130193.623.91$4
Feb 2013155191.233.42$14,144
Jan 2013159191.603.42$14,568
Dec 2012160186.773.42$13,887
Nov 20120186.953.62$4
Oct 20120189.383.40$3
Sep 2012169194.672.92$16,002
Aug 20120192.662.91$3
Jul 2012166185.133.02$14,135
Jun 2012162179.822.52$12,933
May 20120191.612.49$2
Apr 201201101.652.00$2
Mar 20121731105.052.22$18,176
Feb 201201101.102.57$3
Jan 2012179198.092.73$17,561
Dec 20110196.873.24$3
Nov 20110195.723.31$3
Oct 2011177184.983.65$15,045
Sep 20110183.623.99$4
Aug 20110183.404.15$4
Jul 2011164194.144.52$15,443
Jun 20110192.904.64$5
May 20110198.134.40$4
Apr 20111871105.964.33$19,819
Mar 20110196.364.06$4
Feb 20110185.644.18$4
Jan 20110186.504.59$5
Dec 2010181185.734.35$15,521
Nov 20100180.843.80$4
Oct 20100178.103.51$4
Sep 20100172.633.98$4
Aug 2010180173.684.42$13,267
Jul 20100172.554.74$5
Jun 20100170.364.91$5
May 2010190171.124.24$13,517
Apr 20100181.694.12$4
Mar 20100178.394.39$4
Feb 2010154173.585.44$11,337
Jan 20100174.365.96$6
Dec 20090171.445.48$5
Nov 20090174.593.75$4
Oct 2009156172.544.11$11,320
Sep 20090165.543.06$3
Aug 2009158167.423.22$10,656
Jul 20090161.133.46$3
Jun 20090166.163.90$4
May 2009174154.743.93$9,529
Apr 20090146.773.59$4
Mar 2009161142.144.06$6,789
Feb 2009181132.814.63$5,943
Jan 20090135.865.37$5
Dec 20080137.105.98$6
Nov 2008171155.496.86$9,496
Oct 20080175.246.92$7
Sep 20081911101.767.88$19,444
Aug 200801114.228.48$8
Jul 200800131.0811.39$0
Jun 200801131.3313.03$13
May 20081861123.1711.57$22,921
Apr 200801110.3110.45$10
Mar 20081841101.909.66$18,759
Feb 20080192.538.77$9
Jan 2008184190.388.21$16,638
Dec 20070188.337.30$7
Nov 20070091.677.29$0
Oct 2007203182.856.92$16,825
Sep 20070175.846.24$6
Aug 2007173169.066.39$11,954
Jul 20070170.906.39$6
Jun 20070162.007.55$8
May 2007163158.747.85$9,582
Apr 2007178159.617.81$10,618
Mar 20070156.927.30$7
Feb 2007162155.108.22$8,934
Jan 20070150.306.73$7
Dec 20060056.656.92$0
Nov 20060154.207.62$8
Oct 20060154.906.01$6
Sep 2006189160.085.04$11,360
Aug 20060168.717.34$7
Jul 2006189169.376.34$13,117
Jun 20060166.286.38$6
May 2006178166.016.42$11,756
Apr 20060164.397.36$7
Mar 2006177156.707.08$10,043
Feb 20060157.597.75$8
Jan 2006196160.598.93$11,885
Dec 20050154.9413.42$13
Nov 20050154.6910.59$11
Oct 2005184158.3413.80$10,748
Sep 20050161.4512.08$12
Aug 20050161.519.80$10
Jul 2005180155.697.84$10,032
Jun 20050152.337.38$7
May 2005170145.226.65$7,694
Apr 20050149.207.36$7
Mar 2005199050.377.15$10,024
Feb 20050145.226.31$6
Jan 20050143.166.32$6
Dec 2004188139.866.75$7,500
Nov 2004189145.286.33$8,564
Oct 20040149.706.52$7
Sep 2004175143.245.28$7,572
Aug 20040142.375.55$6
Jul 2004179138.286.08$6,858
Jun 20040136.106.43$6
May 2004163137.486.49$6,116
Apr 20040134.475.86$6
Mar 2004158134.365.53$5,434
Feb 2004166132.455.51$5,392
Jan 2004171132.036.30$5,483
Dec 2003164130.266.30$4,969
Nov 2003174128.804.60$5,016
Oct 2003173128.174.76$4,878
Sep 20030026.314.75$0
Aug 20030129.765.13$5
Jul 2003186129.415.17$5,475
Jun 2003179128.565.98$5,118
May 20030126.595.97$6
Apr 2003359126.675.41$9,580
Mar 20030131.146.10$6
Feb 20030133.487.93$8
Jan 2003305130.315.58$9,250
Dec 20020126.914.85$5
Nov 2002191124.664.14$4,714
Oct 20020126.464.23$4
Sep 2002162127.443.64$4,449
Aug 2002407125.963.16$10,569
Jul 20020124.583.06$3
Jun 2002171123.733.34$4,061
May 2002148124.663.58$3,653
Apr 2002155123.653.51$3,669
Mar 2002169122.003.10$3,721
Feb 2002164118.222.38$2,990
Jan 2002152117.172.38$2,612
Dec 2001171116.932.36$2,897
Nov 2001313118.072.41$5,658
Oct 2001161119.782.53$3,187
Sep 2001316124.262.25$7,668
Aug 2001324124.873.05$8,061
Jul 2001312123.933.20$7,469
Jun 2001161124.563.82$3,958
May 2001167125.524.31$4,266
Apr 2001167124.685.34$4,127
Mar 2001329124.545.38$8,079
Feb 2001327127.755.77$9,080
Jan 2001613127.478.40$16,848
Dec 20000126.889.12$9
Nov 2000326132.215.66$10,506
Oct 2000362131.235.15$11,310
Sep 2000505131.875.19$16,100
Aug 2000325129.644.54$9,638
Jul 2000508128.534.09$14,497
Jun 2000683129.304.40$20,016
May 2000718127.263.68$19,576
Apr 2000867124.513.12$21,253
Mar 2000860128.422.86$24,444
Feb 2000665127.622.73$18,370
Jan 20000025.272.48$0
Dec 19990024.282.42$0
Nov 19990023.192.43$0
Oct 19990020.982.80$0
Sep 19990021.752.62$0
Aug 19990019.262.88$0
Jul 19990017.892.37$0
Jun 19990015.942.36$0
May 19990015.792.32$0
Apr 19990015.102.21$0
Mar 19990012.471.84$0
Feb 1999009.981.82$0
Jan 19990010.381.90$0
Dec 1998009.201.77$0
Nov 19980010.892.19$0
Oct 19980012.421.97$0
Sep 19980012.592.08$0
Aug 19980011.301.91$0
Jul 19980011.742.24$0
Jun 19980011.242.24$0
May 19980012.622.21$0
Apr 19980013.042.51$0
Mar 19980012.802.31$0
Feb 19980013.952.30$0
Jan 19980014.702.15$0
Dec 19970016.322.41$0
Nov 19970018.193.09$0
Oct 19970019.253.15$0
Sep 19970017.742.95$0
Aug 19970017.862.55$0
Jul 19970017.582.25$0
Jun 19970017.242.26$0
May 19970018.972.31$0
Apr 19970017.882.08$0
Mar 19970018.951.94$0
Feb 19970020.492.21$0
Jan 19970023.483.54$0
Dec 19960023.32$0
Nov 19960021.97$0
Oct 19960023.31$0
Sep 19960022.22$0
Aug 19960020.26$0
Jul 19960019.55$0
Jun 19960018.73$0
May 19960019.43$0
Apr 19960021.51$0
Mar 19960019.38$0
Feb 19960016.98$0
Jan 19960017.07$0
Dec 19950017.19$0
Nov 19950016.00$0
Oct 19950015.43$0
Sep 19950016.18$0
Aug 19950015.92$0
Jul 19950015.24$0
Jun 19950016.41$0
May 19950017.56$0
Apr 19950017.73$0
Mar 19950016.44$0
Feb 19950016.58$0
Jan 19950015.92$0
Dec 19940015.03$0
Nov 19940015.90$0
Oct 19940015.58$0
Sep 19940015.29$0
Aug 19940016.13$0
Jul 19940017.56$0
Jun 19940017.09$0
May 19940015.88$0
Apr 19940014.14$0
Mar 19940012.46$0
Feb 19940012.50$0
Jan 1994192112.66$2,431
Dec 1993307112.33$3,785
Nov 1993168114.49$2,434
Oct 1993309115.85$4,898
Sep 1993166115.03$2,495
Aug 1993170115.66$2,662
Jul 1993336115.46$5,195
Jun 1993318116.79$5,339
May 1993335117.68$5,923
Apr 19933473018.05$6,263
Mar 19931701418.14$3,084
Feb 19933512517.90$6,283
Jan 19931791316.93$3,030

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Oct 2020 — as filed, then multipliedworked
Oil                  130 bbl  × $ 36.97 =     $4,806
Casinghead gas         0 Mcf  × $  2.48 =         $0

────────────────────────────────────────────────────
Month total                                   $4,806

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 01/O/7824 is the state's own key, not one this site invented.