GOEBEL GAS UNIT

Operated by PATTERSON ENERGY CORPORATION (P-5 643402) in the GOEBEL (SLICK) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 110555District 02Field 35520666NGPA filingCondensateGasSaveExport
Value, all time
$1.7 M
Jan 1993 – Jun 2006
Value, last 12 filed months
$0
at the published price for each month
Months reported
162
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 10 leases and 10 wells, and the rule below applies to all of them.

Discovered
1956-05-07
as the register files it
Field class
Oil and gas
the register's own label
Between wells
933 ft
minimum
From a lease line
467 ft
minimum

A drilling unit in this field needs at least 40 acres.

The Commission's schedule remark for this field reads: FIELD RETURNED TO A. O. F. 4/11/95 BASED ON COMPLETED SURVEY.

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition7,659 bbl$167,523
GasProduction662,430 Mcf$1,564,364
Total$1,731,887

246,614 Mcf of this lease's gas, across 47 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 28.4640, -98.0686. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

28.46403, -98.06860 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
8,236 ft
1 wells filed one
Completion to plug
16.8 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 8,236 ft.

Completions filed
Sep 1989
1 of 1 wells
Plug dates filed
Jun 2006
1 of 1 wells

Last completion to plug: a median of 16.8 years across the 1 well that filed both dates, with the middle half between 16.8 years and 16.8 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-2973340438,236 ftSep 1989Jun 2006Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (162)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

162 months

Jun 20060066.286.38$0
May 20060066.016.42$0
Apr 20060064.397.36$0
Mar 20060056.707.08$0
Feb 20060057.597.75$0
Jan 20060060.598.93$0
Dec 20050054.9413.42$0
Nov 20050054.6910.59$0
Oct 20050058.3413.80$0
Sep 20050061.4512.08$0
Aug 20050061.519.80$0
Jul 20050055.697.84$0
Jun 20050052.337.38$0
May 20050045.226.65$0
Apr 20050049.207.36$0
Mar 20050050.377.15$0
Feb 20050045.226.31$0
Jan 20050043.166.32$0
Dec 20040039.866.75$0
Nov 20040045.286.33$0
Oct 20040049.706.52$0
Sep 20040043.245.28$0
Aug 20040042.375.55$0
Jul 20040038.286.08$0
Jun 20040036.106.43$0
May 20040037.486.49$0
Apr 200455034.475.86$1,896
Mar 20040034.365.53$0
Feb 20040032.455.51$0
Jan 200401,46832.036.30$9,248
Dec 20032026,97830.266.30$50,085
Nov 2003207,01028.804.60$32,788
Oct 200307,50328.174.76$35,712
Sep 200306,44526.314.75$30,610
Aug 20031816,70129.765.13$39,761
Jul 200306,72029.415.17$34,748
Jun 200306,76228.565.98$40,457
May 20031766,86626.595.97$45,688
Apr 200306,22726.675.41$33,671
Mar 200305,27831.146.10$32,175
Feb 20031042,84333.487.93$26,015
Jan 20031834,11530.315.58$28,517
Dec 200204,28726.914.85$20,808
Nov 200204,06624.664.14$16,821
Oct 20021634,65526.464.23$24,000
Sep 200204,80727.443.64$17,474
Aug 20021784,57125.963.16$19,084
Jul 200204,38824.583.06$13,435
Jun 200204,81323.733.34$16,067
May 200205,57724.663.58$19,988
Apr 20021665,85423.653.51$24,487
Mar 20021695,81522.003.10$21,760
Feb 200206,66518.222.38$15,834
Jan 20021736,73017.172.38$18,959
Dec 20011657,34716.932.36$20,165
Nov 200107,04018.072.41$16,935
Oct 20011617,90919.782.53$23,185
Sep 20011737,57124.262.25$21,242
Aug 200108,46724.873.05$25,851
Jul 20011748,43723.933.20$31,138
Jun 20011808,17124.563.82$35,668
May 20011788,55525.524.31$41,392
Apr 20011737,93424.685.34$46,600
Mar 20011778,11124.545.38$47,952
Feb 20011386,33027.755.77$40,335
Jan 20011905,84827.478.40$54,335
Dec 200006,60026.889.12$60,209
Nov 20001924,95432.215.66$34,214
Oct 200006,10231.235.15$31,398
Sep 20001915,04231.875.19$32,238
Aug 20001905,17329.644.54$29,121
Jul 200004,68228.534.09$19,148
Jun 200004,77229.304.40$20,984
May 20001906,28427.263.68$28,303
Apr 200005,59324.513.12$17,428
Mar 20001936,86328.422.86$25,112
Feb 200001,49727.622.73$4,082
Jan 20000025.272.48$0
Dec 19990024.282.42$0
Nov 1999837423.192.43$2,105
Oct 1999063020.982.80$1,766
Sep 19990021.752.62$0
Aug 19990019.262.88$0
Jul 19990017.892.37$0
Jun 19990015.942.36$0
May 1999099115.792.32$2,300
Apr 19991892,97215.102.21$9,416
Mar 199904,44912.471.84$8,179
Feb 199904,0809.981.82$7,417
Jan 199904,70810.381.90$8,945
Dec 19981944,9339.201.77$10,533
Nov 199815,73110.892.19$12,537
Oct 199816,56612.421.97$12,942
Sep 19981946,51312.592.08$16,007
Aug 199806,88811.301.91$13,138
Jul 199806,89111.742.24$15,417
Jun 19981886,05611.242.24$15,662
May 199805,06012.622.21$11,164
Apr 199842,83113.042.51$7,145
Mar 199831,73712.802.31$4,050
Feb 1998024013.952.30$552
Jan 1998261614.702.15$1,357
Dec 19971957,54216.322.41$21,367
Nov 199708,13318.193.09$25,117
Oct 19971659,26719.253.15$32,366
Sep 199708,83717.742.95$26,112
Aug 199708,41317.862.55$21,493
Jul 199706,86817.582.25$15,432
Jun 199701,89117.242.26$4,268
May 199701,36318.972.31$3,146
Apr 19971841,61917.882.08$6,662
Mar 199711,56718.951.94$3,058
Feb 199701,14620.492.21$2,528
Jan 1997077823.483.54$2,754
Dec 199601,39023.32$0
Nov 199601,67821.97$0
Oct 199601,99423.31$0
Sep 1996040922.22$0
Aug 1996038620.26$0
Jul 1996028819.55$0
Jun 19960018.73$0
May 199619823719.43$3,847
Apr 199612,50921.51$22
Mar 199603,66719.38$0
Feb 199604,53216.98$0
Jan 199607,62917.07$0
Dec 19951995,44617.19$3,421
Nov 199505,94916.00$0
Oct 199507,09815.43$0
Sep 199505,96416.18$0
Aug 19951782,75015.92$2,834
Jul 199502,52215.24$0
Jun 199505,68316.41$0
May 199505,64217.56$0
Apr 19951914,13617.73$3,386
Mar 199504,02216.44$0
Feb 199505,61716.58$0
Jan 199505,26415.92$0
Dec 199405,39215.03$0
Nov 19941316,16315.90$2,083
Oct 199406,55015.58$0
Sep 199406,28115.29$0
Aug 199408,78916.13$0
Jul 199409,43117.56$0
Jun 199408,54517.09$0
May 199407,95315.88$0
Apr 1994987,00314.14$1,386
Mar 1994946,79212.46$1,171
Feb 199406,25912.50$0
Jan 199406,74612.66$0
Dec 19931146,91212.33$1,406
Nov 199307,45314.49$0
Oct 1993926,20115.85$1,458
Sep 199304,17415.03$0
Aug 1993972,60315.66$1,519
Jul 1993977,81715.46$1,500
Jun 1993885,31516.79$1,478
May 1993987,46317.68$1,733
Apr 1993968,00618.05$1,733
Mar 199309,48318.14$0
Feb 1993485,40117.90$859
Jan 199305,07016.93$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Apr 2004 — as filed, then multipliedworked
Condensate            55 bbl  × $ 34.47 =     $1,896
Gas                    0 Mcf  × $  5.86 =         $0

────────────────────────────────────────────────────
Month total                                   $1,896

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 02/G/110555 is the state's own key, not one this site invented.