HAUN, ELENA ET AL

Operated by APACHE CORPORATION (P-5 27200) in the GUN POINT (WILCOX LOWER, GRAY) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 120554District 02Field 37480765NGPA filingCondensateGasSaveExport
Value, all time
$1.4 M
Jan 1993 – May 1999
Value, last 12 filed months
$47 k
at the published price for each month
Months reported
77
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 10 leases and 10 wells, and the rule below applies to all of them.

Discovered
1985-01-19
as the register files it
Field class
Gas
the register's own label
Between wells
1,867 ft
minimum
From a lease line
933 ft
minimum

A drilling unit in this field needs at least 320 acres. The field rule took effect on 1985-11-01.

The Commission's schedule remark for this field reads: ALLOCATION FORUMLA SUSPENDED ADMINSTRATIVELY 12/1/92

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition1,691 bbl$27,252
GasProduction2,742,000 Mcf$1,397,964
Total$1,425,216

2,180,669 Mcf of this lease's gas, across 48 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 28.9829, -97.2898. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

28.98290, -97.28981 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
15,909 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 15,909 ft.

Completions filed
May 2008
1 of 1 wells

1 well

42-12331445115,909 ftMay 2008Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (77)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

77 months

May 19990015.792.32$0
Apr 19990015.102.21$0
Mar 19990012.471.84$0
Feb 199916409.981.82$1,637
Jan 199903610.381.90$68
Dec 19980599.201.77$105
Nov 199802,84710.892.19$6,223
Oct 199804,99212.421.97$9,830
Sep 199808412.592.08$175
Aug 19980011.301.91$0
Jul 199807,06411.742.24$15,804
Jun 199805,82711.242.24$13,037
May 199801,97812.622.21$4,364
Apr 1998031,26213.042.51$78,322
Mar 1998032,42712.802.31$74,888
Feb 1998030,94113.952.30$71,137
Jan 1998032,26614.702.15$69,526
Dec 199718732,43916.322.41$81,266
Nov 1997033,71218.193.09$104,111
Oct 1997033,62719.253.15$105,919
Sep 1997034,02617.742.95$100,543
Aug 1997037,01317.862.55$94,559
Jul 1997033,57817.582.25$75,448
Jun 1997040,73817.242.26$91,954
May 199719131,18618.972.31$75,616
Apr 1997035,75417.882.08$74,468
Mar 1997034,18918.951.94$66,297
Feb 1997030,07420.492.21$66,340
Jan 1997035,21223.483.54$124,640
Dec 1996039,98623.32$0
Nov 1996036,47321.97$0
Oct 1996038,72223.31$0
Sep 1996036,99022.22$0
Aug 1996039,46520.26$0
Jul 1996038,72119.55$0
Jun 199619039,32318.73$3,559
May 1996041,55919.43$0
Apr 1996037,28321.51$0
Mar 1996039,90419.38$0
Feb 1996038,30316.98$0
Jan 1996041,85517.07$0
Dec 1995043,60417.19$0
Nov 199519344,07416.00$3,088
Oct 1995047,82615.43$0
Sep 1995046,63416.18$0
Aug 1995058,68215.92$0
Jul 1995057,63715.24$0
Jun 1995046,80816.41$0
May 199519047,81317.56$3,336
Apr 1995043,15117.73$0
Mar 1995045,20216.44$0
Feb 1995043,95216.58$0
Jan 1995043,12215.92$0
Dec 1994043,56015.03$0
Nov 1994042,41415.90$0
Oct 199419243,99815.58$2,991
Sep 1994043,45715.29$0
Aug 1994045,59416.13$0
Jul 1994045,65517.56$0
Jun 1994047,01017.09$0
May 1994046,33915.88$0
Apr 199419246,02014.14$2,715
Mar 1994049,16512.46$0
Feb 1994045,66212.50$0
Jan 1994047,18712.66$0
Dec 1993047,35712.33$0
Nov 1993046,25014.49$0
Oct 1993049,65715.85$0
Sep 1993048,90515.03$0
Aug 1993051,05515.66$0
Jul 1993049,31615.46$0
Jun 1993052,04116.79$0
May 1993052,72317.68$0
Apr 1993047,50718.05$0
Mar 1993055,04218.14$0
Feb 1993047,71417.90$0
Jan 199319249,95216.93$3,251

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Feb 1999 — as filed, then multipliedworked
Condensate           164 bbl  × $  9.98 =     $1,637
Gas                    0 Mcf  × $  1.82 =         $0

────────────────────────────────────────────────────
Month total                                   $1,637

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 02/G/120554 is the state's own key, not one this site invented.