PAWELEK, BEN A.

Operated by BOMMER ENGINEERING CO. (P-5 81565) in the PERSON (EDWARDS) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 127175District 02Field 70778250Hydrogen sulphide fieldCondensateGasSaveExport
Value, all time
$1.7 M
Jan 1993 – Feb 2003
Value, last 12 filed months
$172 k
at the published price for each month
Months reported
122
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 111 leases and 147 wells, and the rule below applies to all of them.

Discovered
1959-08-29
as the register files it
Field class
Oil and gas
the register's own label
Between wells
1,320 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 80 acres. The field rule took effect on 1960-04-19.

The register flags this field for hydrogen sulphide. That is a poisonous gas that occurs naturally in some formations. The flag is a property of the field as the Commission records it. It is not a measurement taken at this lease, and it is not a statement that gas is escaping anywhere.

The Commission's schedule remark for this field reads: BALANCING RULE.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition48,728 bbl$910,811
GasProduction645,906 Mcf$781,009
Total$1,691,821

373,305 Mcf of this lease's gas, across 48 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 29.0237, -97.8841. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

29.02371, -97.88414 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
10,961 ft
1 wells filed one
Completion to plug
36.0 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 10,961 ft.

Completions filed
Apr 1988
1 of 1 wells
Plug dates filed
Apr 2024
1 of 1 wells

Last completion to plug: a median of 36.0 years across the 1 well that filed both dates, with the middle half between 36.0 years and 36.0 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-25500102210,961 ftApr 1988Apr 2024Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (122)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

122 months

Feb 200318591333.487.93$13,430
Jan 20035272,00930.315.58$27,188
Dec 20021871,69226.914.85$13,245
Nov 20023581,89524.664.14$16,668
Oct 20023672,14726.464.23$18,791
Sep 20021771,92627.443.64$11,858
Aug 20023572,53725.963.16$17,295
Jul 20025632,75424.583.06$22,271
Jun 20023562,84623.733.34$17,949
May 200218171124.663.58$7,012
Apr 2002098823.653.51$3,470
Mar 2002091222.003.10$2,830
Feb 20020018.222.38$0
Jan 200219086517.172.38$5,317
Dec 20013823,28116.932.36$14,225
Nov 20013762,87318.072.41$13,705
Oct 20013763,44819.782.53$16,157
Sep 20013633,68524.262.25$17,102
Aug 20013692,98524.873.05$18,291
Jul 20011844,02023.933.20$17,255
Jun 20015723,45224.563.82$27,249
May 20013744,09625.524.31$27,187
Apr 20015483,52424.685.34$32,326
Mar 20013702,56224.545.38$22,854
Feb 200102,05427.755.77$11,846
Jan 200116082227.478.40$11,299
Dec 200037292926.889.12$18,474
Nov 20001911,02032.215.66$11,923
Oct 20001832,52931.235.15$18,728
Sep 20001932,63431.875.19$19,812
Aug 20003683,45029.644.54$26,573
Jul 20001683,67528.534.09$19,823
Jun 20003663,64929.304.40$26,769
May 20003523,56427.263.68$22,710
Apr 20005443,42824.513.12$24,015
Mar 20003413,43028.422.86$19,500
Feb 20005593,41727.622.73$24,756
Jan 20001823,42525.272.48$13,095
Dec 19993654,04724.282.42$18,671
Nov 19991793,48523.192.43$12,633
Oct 19991954,12420.982.80$15,654
Sep 19993813,53521.752.62$17,544
Aug 19995744,62619.262.88$24,358
Jul 19993733,67917.892.37$15,401
Jun 19991814,19515.942.36$12,794
May 19993795,03915.792.32$17,680
Apr 19993774,69015.102.21$16,048
Mar 19993675,12012.471.84$13,989
Feb 19993693,7109.981.82$10,427
Jan 19993715,49410.381.90$14,289
Dec 19985474,5909.201.77$13,172
Nov 19981814,52610.892.19$11,864
Oct 19983765,10712.421.97$14,727
Sep 19983725,04512.592.08$15,190
Aug 19983225,16411.301.91$13,488
Jul 19983645,34811.742.24$16,238
Jun 19985415,36011.242.24$18,073
May 19983484,66412.622.21$14,682
Apr 19983554,58813.042.51$16,124
Mar 19985334,94712.802.31$18,247
Feb 19983444,55213.952.30$15,264
Jan 19983595,59914.702.15$17,342
Dec 19973625,76016.322.41$19,796
Nov 19973574,65918.193.09$20,882
Oct 19975225,40619.253.15$27,076
Sep 19973535,11417.742.95$21,373
Aug 19973585,58117.862.55$20,652
Jul 19973805,86817.582.25$19,865
Jun 19975495,87517.242.26$22,726
May 19973655,70518.972.31$20,094
Apr 19973745,47617.882.08$18,092
Mar 19975726,27318.951.94$23,004
Feb 19973785,81120.492.21$20,564
Jan 19975255,69223.483.54$32,475
Dec 19963616,38523.32$8,419
Nov 19965566,52721.97$12,215
Oct 19965506,50223.31$12,821
Sep 19961856,27022.22$4,111
Aug 19965376,93320.26$10,880
Jul 19965607,43419.55$10,948
Jun 19965507,10118.73$10,302
May 19963756,41719.43$7,286
Apr 19963676,39721.51$7,894
Mar 19965306,71419.38$10,271
Feb 19963626,71816.98$6,147
Jan 19965476,88017.07$9,337
Dec 19955267,18717.19$9,042
Nov 19955427,35316.00$8,672
Oct 19953677,07315.43$5,663
Sep 19955557,31616.18$8,980
Aug 19953687,87915.92$5,859
Jul 19955478,40615.24$8,336
Jun 19953648,80516.41$5,973
May 19957179,46417.56$12,591
Apr 19955469,21217.73$9,681
Mar 19955376,58216.44$8,828
Feb 19953546,85116.58$5,869
Jan 19955607,84615.92$8,915
Dec 19943616,82915.03$5,426
Nov 19943697,60115.90$5,867
Oct 19943698,39615.58$5,749
Sep 19945568,51615.29$8,501
Aug 19945609,26316.13$9,033
Jul 19945129,83717.56$8,991
Jun 19945389,96417.09$9,194
May 19945439,86215.88$8,623
Apr 19947238,83714.14$10,223
Mar 19945428,85912.46$6,753
Feb 19943557,83412.50$4,438
Jan 19947058,63912.66$8,925
Dec 19933588,11412.33$4,414
Nov 19932736,86714.49$3,956
Oct 19936638,32615.85$10,509
Sep 19932908,40615.03$4,359
Aug 19937367,26315.66$11,526
Jul 19935147,58215.46$7,946
Jun 19935427,69216.79$9,100
May 19933698,33117.68$6,524
Apr 19937317,89018.05$13,195
Mar 19935438,50518.14$9,850
Feb 19935567,04417.90$9,952
Jan 19933688,59616.93$6,230

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Feb 2003 — as filed, then multipliedworked
Condensate           185 bbl  × $ 33.48 =     $6,194
Gas                  913 Mcf  × $  7.93 =     $7,236

────────────────────────────────────────────────────
Month total                                  $13,430

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 02/G/127175 is the state's own key, not one this site invented.