BLOCK 75 UNIT

Operated by SAGE ENERGY COMPANY (P-5 743215) in the CLAYTON (BLOCK 85 SD) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 147639District 02Field 18765074CondensateGasSaveExport
Value, all time
$1.3 M
Nov 1993 – May 2001
Value, last 12 filed months
$282 k
at the published price for each month
Months reported
91
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 10 leases and 10 wells, and the rule below applies to all of them.

Discovered
1972-07-15
as the register files it
Field class
Gas
the register's own label
Between wells
no field rule filed
From a lease line
no field rule filed

The Commission's schedule remark for this field reads: FIELD MADE 100% AOF ADMINISTRAVELY EFF 4/1/95

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition11,934 bbl$209,091
GasProduction914,679 Mcf$1,080,721
Total$1,289,812

529,715 Mcf of this lease's gas, across 38 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 28.3125, -98.3090. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

28.31254, -98.30898 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
8,400 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 8,400 ft.

Completions filed
Aug 2008
1 of 1 wells

1 well

42-2973408548,400 ftAug 2008Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (91)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

91 months

May 20010025.524.31$0
Apr 20010024.685.34$0
Mar 20010024.545.38$0
Feb 20010027.755.77$0
Jan 20011402,60227.478.40$25,699
Dec 200006,15326.889.12$56,131
Nov 200006,35832.215.66$35,974
Oct 20001606,99631.235.15$40,995
Sep 200006,51131.875.19$33,769
Aug 200006,73729.644.54$30,591
Jul 200007,27128.534.09$29,737
Jun 200006,59829.304.40$29,013
May 20001697,74027.263.68$33,088
Apr 200007,55924.513.12$23,554
Mar 200007,55728.422.86$21,611
Feb 20001817,71127.622.73$26,023
Jan 200007,77725.272.48$19,291
Dec 1999597,93024.282.42$20,653
Nov 1999248,17723.192.43$20,459
Oct 19992688,39420.982.80$29,157
Sep 1999168,07421.752.62$21,493
Aug 1999137,74819.262.88$22,531
Jul 19991897,73217.892.37$21,724
Jun 1999287,58315.942.36$18,358
May 1999148,24215.792.32$19,351
Apr 19991638,01315.102.21$20,154
Mar 1999107,44712.471.84$13,815
Feb 19991797,3159.981.82$15,084
Jan 199908,76610.381.90$16,655
Dec 199808,8829.201.77$15,751
Nov 19981868,68010.892.19$20,998
Oct 199817,42112.421.97$14,626
Sep 19981758,59912.592.08$20,112
Aug 199828,95211.301.91$17,097
Jul 19982178,98211.742.24$22,643
Jun 1998589,32411.242.24$21,512
May 19981799,97312.622.21$24,263
Apr 199869,75213.042.51$24,510
Mar 19982209,12912.802.31$23,899
Feb 19982319,29813.952.30$24,600
Jan 1998905,50114.702.15$13,177
Dec 19971727,10416.322.41$19,935
Nov 1997377,34718.193.09$23,362
Oct 19972007,02219.253.15$25,968
Sep 199716,88717.742.95$20,368
Aug 199720512,42717.862.55$35,409
Jul 19974710,57017.582.25$24,576
Jun 199722910,32517.242.26$27,254
May 19972137,89118.972.31$22,257
Apr 1997407,83017.882.08$17,023
Mar 19972207,78518.951.94$19,265
Feb 19972427,01220.492.21$20,426
Jan 1997975,28023.483.54$20,967
Dec 19962406,45423.32$5,597
Nov 19961777,16821.97$3,889
Oct 199658,06623.31$117
Sep 19961717,45622.22$3,800
Aug 199616611,65320.26$3,363
Jul 1996015,65519.55$0
Jun 199616912,49518.73$3,165
May 199616713,97219.43$3,245
Apr 199620610,86821.51$4,431
Mar 199621212,99919.38$4,109
Feb 1996488,70516.98$815
Jan 199621911,26317.07$3,738
Dec 199521910,65417.19$3,765
Nov 19952119,33816.00$3,376
Oct 19951976,32915.43$3,040
Sep 19951826,32916.18$2,945
Aug 19951877,79415.92$2,977
Jul 1995298,34715.24$442
Jun 19951948,27916.41$3,184
May 19952039,90217.56$3,565
Apr 199522211,60717.73$3,936
Mar 199537312,92616.44$6,132
Feb 199520912,02716.58$3,465
Jan 199522010,89915.92$3,502
Dec 199438911,29115.03$5,847
Nov 19941925,30015.90$3,053
Oct 19941989,51415.58$3,085
Sep 199435017,24015.29$5,352
Aug 199435819,57016.13$5,775
Jul 199436819,23817.56$6,462
Jun 199456619,45417.09$9,673
May 199435320,82915.88$5,606
Apr 199418127,54814.14$2,559
Mar 19943331,13912.46$411
Feb 19943930,31612.50$488
Jan 1994027,10212.66$0
Dec 1993029,58412.33$0
Nov 1993020,40514.49$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Jan 2001 — as filed, then multipliedworked
Condensate           140 bbl  × $ 27.47 =     $3,846
Gas                2,602 Mcf  × $  8.40 =    $21,854

────────────────────────────────────────────────────
Month total                                  $25,699

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 02/G/147639 is the state's own key, not one this site invented.