KICKENDAHL

Operated by U1 RANCH OIL (P-5 880291) in the MISSION VALLEY, W. (FRIO 1900) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 149660District 02Field 62157015GasSaveExport
Value, all time
$223 k
Nov 1993 – Jun 2012
Value, last 12 filed months
$0
at the published price for each month
Months reported
224
no gaps in the span
Streams
1
gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 2 leases and 2 wells, and the rule below applies to all of them.

Discovered
1993-11-05
as the register files it
Field class
Gas
the register's own label
Between wells
no field rule filed
From a lease line
no field rule filed

The Commission's schedule remark for this field reads: AOF-1 AND AOF-2 EFFECTIVE 08/01/2004.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
GasProduction207,342 Mcf$223,185
Total$223,185

143,104 Mcf of this lease's gas, across 33 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 28.8390, -97.2768. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

28.83899, -97.27677 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
3,719 ft
1 wells filed one
Completion to plug
18.6 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 3,719 ft.

Completions filed
Nov 1993
1 of 1 wells
Plug dates filed
Jun 2012
1 of 1 wells

Last completion to plug: a median of 18.6 years across the 1 well that filed both dates, with the middle half between 18.6 years and 18.6 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-1753266613,719 ftNov 1993Jun 2012Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (224)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

224 months

Jun 2012079.822.52$0
May 2012091.612.49$0
Apr 20120101.652.00$0
Mar 20120105.052.22$0
Feb 20120101.102.57$0
Jan 2012098.092.73$0
Dec 2011096.873.24$0
Nov 2011095.723.31$0
Oct 2011084.983.65$0
Sep 2011083.623.99$0
Aug 2011083.404.15$0
Jul 2011094.144.52$0
Jun 2011092.904.64$0
May 2011098.134.40$0
Apr 20110105.964.33$0
Mar 2011096.364.06$0
Feb 2011085.644.18$0
Jan 2011086.504.59$0
Dec 2010085.734.35$0
Nov 2010080.843.80$0
Oct 2010078.103.51$0
Sep 2010072.633.98$0
Aug 2010073.684.42$0
Jul 2010072.554.74$0
Jun 2010070.364.91$0
May 2010071.124.24$0
Apr 2010081.694.12$0
Mar 2010078.394.39$0
Feb 2010073.585.44$0
Jan 2010074.365.96$0
Dec 2009071.445.48$0
Nov 2009074.593.75$0
Oct 2009072.544.11$0
Sep 2009065.543.06$0
Aug 2009067.423.22$0
Jul 2009061.133.46$0
Jun 2009066.163.90$0
May 2009054.743.93$0
Apr 2009046.773.59$0
Mar 2009042.144.06$0
Feb 2009032.814.63$0
Jan 2009035.865.37$0
Dec 2008037.105.98$0
Nov 2008055.496.86$0
Oct 2008075.246.92$0
Sep 20080101.767.88$0
Aug 20080114.228.48$0
Jul 20080131.0811.39$0
Jun 20080131.3313.03$0
May 20080123.1711.57$0
Apr 20080110.3110.45$0
Mar 20080101.909.66$0
Feb 2008092.538.77$0
Jan 2008090.388.21$0
Dec 2007088.337.30$0
Nov 2007091.677.29$0
Oct 2007082.856.92$0
Sep 2007075.846.24$0
Aug 2007069.066.39$0
Jul 2007070.906.39$0
Jun 2007062.007.55$0
May 2007058.747.85$0
Apr 2007059.617.81$0
Mar 2007056.927.30$0
Feb 2007055.108.22$0
Jan 2007050.306.73$0
Dec 2006056.656.92$0
Nov 2006054.207.62$0
Oct 2006054.906.01$0
Sep 2006060.085.04$0
Aug 2006068.717.34$0
Jul 2006069.376.34$0
Jun 2006066.286.38$0
May 2006066.016.42$0
Apr 2006064.397.36$0
Mar 2006056.707.08$0
Feb 2006057.597.75$0
Jan 2006060.598.93$0
Dec 2005054.9413.42$0
Nov 2005054.6910.59$0
Oct 2005058.3413.80$0
Sep 2005061.4512.08$0
Aug 2005061.519.80$0
Jul 2005055.697.84$0
Jun 2005052.337.38$0
May 2005045.226.65$0
Apr 2005049.207.36$0
Mar 2005050.377.15$0
Feb 2005045.226.31$0
Jan 2005043.166.32$0
Dec 2004039.866.75$0
Nov 2004045.286.33$0
Oct 2004049.706.52$0
Sep 2004043.245.28$0
Aug 2004042.375.55$0
Jul 2004038.286.08$0
Jun 2004036.106.43$0
May 2004037.486.49$0
Apr 2004034.475.86$0
Mar 2004034.365.53$0
Feb 2004032.455.51$0
Jan 2004032.036.30$0
Dec 2003030.266.30$0
Nov 2003028.804.60$0
Oct 2003028.174.76$0
Sep 200395026.314.75$4,512
Aug 200321029.765.13$1,077
Jul 200326729.415.17$1,381
Jun 200325528.565.98$1,526
May 200345226.595.97$2,700
Apr 200360826.675.41$3,288
Mar 200361931.146.10$3,773
Feb 200341333.487.93$3,273
Jan 20031,10030.315.58$6,140
Dec 200296526.914.85$4,684
Nov 200253024.664.14$2,193
Oct 20021,27926.464.23$5,409
Sep 200299927.443.64$3,632
Aug 20021,80525.963.16$5,711
Jul 20023,11724.583.06$9,544
Jun 20024,09323.733.34$13,663
May 20024,55424.663.58$16,322
Apr 20021,00323.653.51$3,523
Mar 200268522.003.10$2,125
Feb 200273518.222.38$1,746
Jan 200282817.172.38$1,967
Dec 20011,09716.932.36$2,594
Nov 200186518.072.41$2,081
Oct 20011,00919.782.53$2,552
Sep 20011,15124.262.25$2,591
Aug 20011,17424.873.05$3,584
Jul 20011,94623.933.20$6,222
Jun 20011,47424.563.82$5,637
May 20011,08825.524.31$4,686
Apr 200176424.685.34$4,076
Mar 200166924.545.38$3,597
Feb 200151727.755.77$2,982
Jan 200169527.478.40$5,837
Dec 200072326.889.12$6,596
Nov 200066132.215.66$3,740
Oct 200071831.235.15$3,694
Sep 200060931.875.19$3,159
Aug 200074329.644.54$3,374
Jul 200013228.534.09$540
Jun 200039029.304.40$1,715
May 200060427.263.68$2,223
Apr 200033824.513.12$1,053
Mar 200044828.422.86$1,281
Feb 200040327.622.73$1,099
Jan 200046925.272.48$1,163
Dec 199936124.282.42$875
Nov 199921023.192.43$511
Oct 199941820.982.80$1,172
Sep 199937221.752.62$974
Aug 199984219.262.88$2,421
Jul 1999017.892.37$0
Jun 1999015.942.36$0
May 1999015.792.32$0
Apr 1999015.102.21$0
Mar 1999012.471.84$0
Feb 199909.981.82$0
Jan 1999010.381.90$0
Dec 199809.201.77$0
Nov 1998010.892.19$0
Oct 1998012.421.97$0
Sep 1998012.592.08$0
Aug 1998011.301.91$0
Jul 1998011.742.24$0
Jun 1998011.242.24$0
May 1998012.622.21$0
Apr 1998013.042.51$0
Mar 1998012.802.31$0
Feb 19988313.952.30$191
Jan 199835714.702.15$769
Dec 199714816.322.41$357
Nov 199740318.193.09$1,245
Oct 199724419.253.15$769
Sep 19971,28617.742.95$3,800
Aug 19971,23817.862.55$3,163
Jul 19972,02417.582.25$4,548
Jun 19972,16317.242.26$4,882
May 19972,20718.972.31$5,095
Apr 19972,13817.882.08$4,453
Mar 19972,17818.951.94$4,223
Feb 19971,95120.492.21$4,304
Jan 19971,46123.483.54$5,172
Dec 19961,41823.32$0
Nov 19961,38721.97$0
Oct 1996023.31$0
Sep 1996022.22$0
Aug 1996020.26$0
Jul 1996019.55$0
Jun 19961,26418.73$0
May 19963,16219.43$0
Apr 19963,10221.51$0
Mar 19963,83919.38$0
Feb 19963,49816.98$0
Jan 19963,84517.07$0
Dec 19953,85417.19$0
Nov 19953,87016.00$0
Oct 19954,51015.43$0
Sep 19952,60516.18$0
Aug 19952,72115.92$0
Jul 19952,39015.24$0
Jun 19952,07916.41$0
May 199593517.56$0
Apr 199512617.73$0
Mar 1995016.44$0
Feb 19951,52516.58$0
Jan 19956,24815.92$0
Dec 19946,34715.03$0
Nov 19945,80215.90$0
Oct 19946,54915.58$0
Sep 19946,68015.29$0
Aug 19946,85616.13$0
Jul 19946,40317.56$0
Jun 19946,68417.09$0
May 19947,16515.88$0
Apr 19947,15414.14$0
Mar 19946,85512.46$0
Feb 19946,41412.50$0
Jan 19946,43612.66$0
Dec 19936,63112.33$0
Nov 19934,75014.49$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Sep 2003 — as filed, then multipliedworked
Gas                  950 Mcf  × $  4.75 =     $4,512

────────────────────────────────────────────────────
Month total                                   $4,512

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 02/G/149660 is the state's own key, not one this site invented.