O'CONNOR, DENNIS ET AL "N"

Operated by T - C OIL COMPANY (P-5 833850) in the HUFF (2900) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 149791District 02Field 43270484GasSaveExport
Value, all time
$327 k
May 1994 – Feb 2003
Value, last 12 filed months
$44 k
at the published price for each month
Months reported
106
no gaps in the span
Streams
1
gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 17 leases and 17 wells, and the rule below applies to all of them.

Discovered
1952-03-21
as the register files it
Field class
Gas
the register's own label
Between wells
1,200 ft
minimum
From a lease line
467 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 1991-07-01.

The Commission's schedule remark for this field reads: ALLOCATION FORMULA EFFECTIVE 04/01/93.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
GasProduction238,721 Mcf$326,869
Total$326,869

121,826 Mcf of this lease's gas, across 32 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 28.5253, -97.0511. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

28.52528, -97.05107 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
4,089 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 4,089 ft.

Completions filed
Feb 2003
1 of 1 wells

1 well

42-39132069N 154,089 ftFeb 2003Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (106)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

106 months

Feb 200344133.487.93$3,495
Jan 20031,36230.315.58$7,603
Dec 20021,11726.914.85$5,422
Nov 200272924.664.14$3,016
Oct 200279726.464.23$3,371
Sep 200274427.443.64$2,705
Aug 200294225.963.16$2,981
Jul 200299824.583.06$3,056
Jun 20021,16923.733.34$3,902
May 200291124.663.58$3,265
Apr 200276423.653.51$2,683
Mar 200267022.003.10$2,079
Feb 200234318.222.38$815
Jan 200294617.172.38$2,247
Dec 20011,00916.932.36$2,386
Nov 200189818.072.41$2,160
Oct 200165419.782.53$1,654
Sep 200162724.262.25$1,412
Aug 200160424.873.05$1,844
Jul 200152223.933.20$1,669
Jun 200154024.563.82$2,065
May 200153025.524.31$2,283
Apr 200143624.685.34$2,326
Mar 200153224.545.38$2,860
Feb 200158627.755.77$3,380
Jan 200173027.478.40$6,131
Dec 200066526.889.12$6,066
Nov 200075232.215.66$4,255
Oct 200083231.235.15$4,281
Sep 200079731.875.19$4,134
Aug 200088129.644.54$4,000
Jul 200087728.534.09$3,587
Jun 20001,00529.304.40$4,419
May 200097627.263.68$3,591
Apr 20001,06324.513.12$3,312
Mar 20001,74428.422.86$4,987
Feb 200094927.622.73$2,587
Jan 20001,04625.272.48$2,595
Dec 19991,25124.282.42$3,032
Nov 19991,35123.192.43$3,288
Oct 19991,25420.982.80$3,516
Sep 19991,24821.752.62$3,268
Aug 19991,14519.262.88$3,293
Jul 19991,44117.892.37$3,419
Jun 19991,51515.942.36$3,579
May 19991,80115.792.32$4,180
Apr 19991,70115.102.21$3,756
Mar 19991,97212.471.84$3,625
Feb 19991,7399.981.82$3,161
Jan 19992,02310.381.90$3,844
Dec 19982,1159.201.77$3,751
Nov 19982,00910.892.19$4,391
Oct 19981,81112.421.97$3,566
Sep 19982,21512.592.08$4,613
Aug 19982,40811.301.91$4,593
Jul 19982,32611.742.24$5,204
Jun 19981,69111.242.24$3,783
May 19981,18112.622.21$2,606
Apr 19981,71313.042.51$4,292
Mar 19981,84712.802.31$4,266
Feb 19982,35313.952.30$5,410
Jan 19982,70714.702.15$5,833
Dec 19973,27416.322.41$7,894
Nov 19973,68418.193.09$11,377
Oct 19973,46719.253.15$10,920
Sep 19973,75217.742.95$11,087
Aug 19974,54817.862.55$11,619
Jul 19974,54817.582.25$10,219
Jun 19973,25917.242.26$7,356
May 19973,13218.972.31$7,230
Apr 19973,31717.882.08$6,909
Mar 19973,97318.951.94$7,704
Feb 19974,01020.492.21$8,846
Jan 19971,92623.483.54$6,817
Dec 199696823.32$0
Nov 19961,69321.97$0
Oct 19961,55823.31$0
Sep 19961,56822.22$0
Aug 19961,85220.26$0
Jul 19962,10519.55$0
Jun 19961,47718.73$0
May 19962,14519.43$0
Apr 19962,62821.51$0
Mar 19962,28919.38$0
Feb 19962,98816.98$0
Jan 19962,98617.07$0
Dec 19952,71117.19$0
Nov 19952,61216.00$0
Oct 19953,10015.43$0
Sep 19953,06716.18$0
Aug 19954,39115.92$0
Jul 19955,63115.24$0
Jun 19954,23016.41$0
May 19954,09717.56$0
Apr 19956,75917.73$0
Mar 19955,68616.44$0
Feb 19954,18016.58$0
Jan 19955,12415.92$0
Dec 19946,17315.03$0
Nov 19946,42615.90$0
Oct 19945,75815.58$0
Sep 19947,30515.29$0
Aug 19945,96216.13$0
Jul 19944,78617.56$0
Jun 19947,35617.09$0
May 19942,21515.88$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Feb 2003 — as filed, then multipliedworked
Gas                  441 Mcf  × $  7.93 =     $3,495

────────────────────────────────────────────────────
Month total                                   $3,495

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 02/G/149791 is the state's own key, not one this site invented.