FOX, C.P.

Operated by ACOCK ENGINEERING & ASSOC., INC. (P-5 3594) in the REFUGIO-FOX (3500) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 151058District 02Field 75612312CondensateGasSaveExport
Value, all time
$769 k
Aug 1994 – Apr 2002
Value, last 12 filed months
$69 k
at the published price for each month
Months reported
93
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 5 leases and 9 wells, and the rule below applies to all of them.

Discovered
1963-11-01
as the register files it
Field class
Oil and gas
the register's own label
Between wells
no field rule filed
From a lease line
no field rule filed

The Commission's schedule remark for this field reads: FIELD MADE ONE WELL FROM ASSOC 49-B FIELD

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition1,798 bbl$45,800
GasProduction249,458 Mcf$723,229
Total$769,029

44,077 Mcf of this lease's gas, across 28 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 28.3543, -97.2094. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

28.35425, -97.20940 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
7,536 ft
1 wells filed one
Completion to plug
7.5 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 7,536 ft.

Completions filed
Aug 1994
1 of 1 wells
Plug dates filed
Feb 2002
1 of 1 wells

Last completion to plug: a median of 7.5 years across the 1 well that filed both dates, with the middle half between 7.5 years and 7.5 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-3913207117,536 ftAug 1994Feb 2002Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (93)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

93 months

Apr 20020023.653.51$0
Mar 20020022.003.10$0
Feb 200232018.222.38$583
Jan 2002205017.172.38$3,520
Dec 20010016.932.36$0
Nov 20010018.072.41$0
Oct 20010019.782.53$0
Sep 20010024.262.25$0
Aug 20010024.873.05$0
Jul 20011583,59923.933.20$15,287
Jun 20011555,10124.563.82$23,314
May 20011595,09625.524.31$26,008
Apr 20011624,40924.685.34$27,522
Mar 20011465,20324.545.38$31,556
Feb 20011545,61327.755.77$36,644
Jan 200106,37827.478.40$53,567
Dec 20001565,89326.889.12$57,952
Nov 200005,51232.215.66$31,187
Oct 20001505,55731.235.15$33,278
Sep 200003,63531.875.19$18,853
Aug 20001616,20429.644.54$32,943
Jul 200004,47628.534.09$18,306
Jun 200005,35329.304.40$23,538
May 200005,83227.263.68$21,460
Apr 200005,94124.513.12$18,512
Mar 20001606,45228.422.86$22,998
Feb 200006,45827.622.73$17,608
Jan 200006,62525.272.48$16,433
Dec 199907,20224.282.42$17,456
Nov 199907,12323.192.43$17,337
Oct 199906,85820.982.80$19,228
Sep 199906,34121.752.62$16,606
Aug 199906,24419.262.88$17,955
Jul 199906,88917.892.37$16,343
Jun 199905,67815.942.36$13,412
May 199906,49615.792.32$15,077
Apr 199907,39215.102.21$16,322
Mar 199906,46812.471.84$11,890
Feb 199903,5339.981.82$6,422
Jan 199903,37110.381.90$6,405
Dec 199802,6509.201.77$4,699
Nov 199802,86510.892.19$6,262
Oct 199801,05512.421.97$2,078
Sep 199802,23812.592.08$4,661
Aug 1998085011.301.91$1,621
Jul 1998085011.742.24$1,902
Jun 1998089811.242.24$2,009
May 1998085112.622.21$1,878
Apr 1998084813.042.51$2,125
Mar 1998074212.802.31$1,714
Feb 1998082713.952.30$1,901
Jan 1998076214.702.15$1,642
Dec 1997072916.322.41$1,758
Nov 1997075418.193.09$2,329
Oct 1997086119.253.15$2,712
Sep 1997052717.742.95$1,557
Aug 1997060817.862.55$1,553
Jul 1997058717.582.25$1,319
Jun 1997055017.242.26$1,241
May 1997038418.972.31$886
Apr 1997043617.882.08$908
Mar 199702,65318.951.94$5,145
Feb 199704,36620.492.21$9,631
Jan 1997055823.483.54$1,975
Dec 1996054123.32$0
Nov 1996047421.97$0
Oct 1996039623.31$0
Sep 1996039322.22$0
Aug 19960020.26$0
Jul 1996062519.55$0
Jun 1996073418.73$0
May 1996044219.43$0
Apr 1996053921.51$0
Mar 1996035419.38$0
Feb 1996088216.98$0
Jan 1996075817.07$0
Dec 1995059617.19$0
Nov 1995068216.00$0
Oct 1995076415.43$0
Sep 1995063216.18$0
Aug 1995064815.92$0
Jul 199501,59615.24$0
Jun 199501,25816.41$0
May 199503,08817.56$0
Apr 199502,53417.73$0
Mar 199502,36016.44$0
Feb 199502,66416.58$0
Jan 199502,77015.92$0
Dec 1994085115.03$0
Nov 199401,46715.90$0
Oct 199407,02515.58$0
Sep 199405,87215.29$0
Aug 199403,13216.13$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Feb 2002 — as filed, then multipliedworked
Condensate            32 bbl  × $ 18.22 =       $583
Gas                    0 Mcf  × $  2.38 =         $0

────────────────────────────────────────────────────
Month total                                     $583

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 02/G/151058 is the state's own key, not one this site invented.