DOUGHERTY 222

Operated by TRANSTEXAS GAS CORPORATION (P-5 864889) in the MOUNTAIN VIEW, N. (9550) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 162502District 02Field 63468700CondensateGasSaveExport
Value, all time
$371 k
Feb 1997 – Jul 1998
Value, last 12 filed months
$123 k
at the published price for each month
Months reported
18
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 3 leases and 3 wells, and the rule below applies to all of them.

Discovered
1981-08-19
as the register files it
Field class
Gas
the register's own label
Between wells
no field rule filed
From a lease line
no field rule filed

The Commission's schedule remark for this field reads: AOF-1 AND AOF-2 EFFECTIVE 07/01/97.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition5,298 bbl$95,501
GasProduction117,105 Mcf$275,990
Total$371,492

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 28.2486, -98.3016. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

28.24860, -98.30164 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
13,400 ft
1 wells filed one
Completion to plug
16.4 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 13,400 ft.

Completions filed
Dec 2001
1 of 1 wells
Plug dates filed
May 2018
1 of 1 wells

Last completion to plug: a median of 16.4 years across the 1 well that filed both dates, with the middle half between 16.4 years and 16.4 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-297342033-T13,400 ftDec 2001May 2018Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (18)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

18 months

Jul 19980011.742.24$0
Jun 199817011.242.24$191
May 19980012.622.21$0
Apr 19980013.042.51$0
Mar 19980012.802.31$0
Feb 19980013.952.30$0
Jan 19981551,01214.702.15$4,459
Dec 19971342,81716.322.41$8,979
Nov 19973294,86818.193.09$21,018
Oct 19973155,30019.253.15$22,758
Sep 19973298,19517.742.95$30,052
Aug 199725612,23317.862.55$35,824
Jul 199739915,40117.582.25$41,620
Jun 199767317,78217.242.26$51,740
May 199783417,83718.972.31$56,998
Apr 19971,15916,15917.882.08$54,379
Mar 199769814,79318.951.94$41,913
Feb 1997070820.492.21$1,562

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Jun 1998 — as filed, then multipliedworked
Condensate            17 bbl  × $ 11.24 =       $191
Gas                    0 Mcf  × $  2.24 =         $0

────────────────────────────────────────────────────
Month total                                     $191

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 02/G/162502 is the state's own key, not one this site invented.