Operated by MCCOMBS ENERGY, LTD. (P-5 541739) in the CHARLINE (FORNEY) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 162979District 02Field 17240100CondensateGasSaveExport
Value, all time
$2.2 M
Mar 1997 – Aug 2012
Value, last 12 filed months
$16 k
at the published price for each month
Months reported
186
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 25 leases and 25 wells, and the rule below applies to all of them.

Discovered
1981-06-01
as the register files it
Field class
Gas
the register's own label
Between wells
1,867 ft
minimum
From a lease line
1,000 ft
minimum

A drilling unit in this field needs at least 160 acres.

The Commission's schedule remark for this field reads: ALLOCATION FORMULA SUSPENDED EFF 2/1/94

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition10,874 bbl$204,438
GasProduction605,703 Mcf$1,984,325
Total$2,188,763

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 28.2941, -98.2605. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

28.29407, -98.26054 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
11,800 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 11,800 ft.

Plug dates filed
May 2012
1 of 1 wells

1 well

42-29734206511,800 ftMay 2012Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (186)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

186 months

Aug 20120092.662.91$0
Jul 20120085.133.02$0
Jun 20120079.822.52$0
May 2012176091.612.49$16,123
Apr 201200101.652.00$0
Mar 201200105.052.22$0
Feb 201200101.102.57$0
Jan 20120098.092.73$0
Dec 20110096.873.24$0
Nov 20110095.723.31$0
Oct 20110084.983.65$0
Sep 20110083.623.99$0
Aug 20110083.404.15$0
Jul 20110094.144.52$0
Jun 20110092.904.64$0
May 20110098.134.40$0
Apr 201100105.964.33$0
Mar 20110096.364.06$0
Feb 20110085.644.18$0
Jan 20110086.504.59$0
Dec 20100085.734.35$0
Nov 20100080.843.80$0
Oct 20100078.103.51$0
Sep 20100072.633.98$0
Aug 20100073.684.42$0
Jul 20100072.554.74$0
Jun 20100070.364.91$0
May 20100071.124.24$0
Apr 20100081.694.12$0
Mar 20100078.394.39$0
Feb 20100073.585.44$0
Jan 20100074.365.96$0
Dec 20090071.445.48$0
Nov 20090074.593.75$0
Oct 20090072.544.11$0
Sep 20090065.543.06$0
Aug 20090067.423.22$0
Jul 20090061.133.46$0
Jun 20090066.163.90$0
May 20090054.743.93$0
Apr 20090046.773.59$0
Mar 20090042.144.06$0
Feb 20090032.814.63$0
Jan 20090035.865.37$0
Dec 20080037.105.98$0
Nov 20080055.496.86$0
Oct 20080075.246.92$0
Sep 200800101.767.88$0
Aug 200800114.228.48$0
Jul 200800131.0811.39$0
Jun 200800131.3313.03$0
May 200800123.1711.57$0
Apr 200800110.3110.45$0
Mar 200800101.909.66$0
Feb 20080092.538.77$0
Jan 20080090.388.21$0
Dec 20070088.337.30$0
Nov 20070091.677.29$0
Oct 20070082.856.92$0
Sep 20070075.846.24$0
Aug 20070069.066.39$0
Jul 20070070.906.39$0
Jun 20070062.007.55$0
May 20070058.747.85$0
Apr 20070059.617.81$0
Mar 20070056.927.30$0
Feb 20070055.108.22$0
Jan 20070050.306.73$0
Dec 20060056.656.92$0
Nov 20060054.207.62$0
Oct 20060054.906.01$0
Sep 20060060.085.04$0
Aug 20060068.717.34$0
Jul 20060069.376.34$0
Jun 20060066.286.38$0
May 20060066.016.42$0
Apr 20060064.397.36$0
Mar 20060056.707.08$0
Feb 20060057.597.75$0
Jan 20060060.598.93$0
Dec 20050054.9413.42$0
Nov 20050054.6910.59$0
Oct 20050058.3413.80$0
Sep 20050061.4512.08$0
Aug 20050061.519.80$0
Jul 20050055.697.84$0
Jun 20050052.337.38$0
May 20050045.226.65$0
Apr 20050049.207.36$0
Mar 20050050.377.15$0
Feb 20050045.226.31$0
Jan 20050043.166.32$0
Dec 2004035039.866.75$2,363
Nov 20040045.286.33$0
Oct 200401,13249.706.52$7,375
Sep 200401,00043.245.28$5,284
Aug 200404,63442.375.55$25,722
Jul 200404,83438.286.08$29,411
Jun 2004046836.106.43$3,011
May 200402,62837.486.49$17,068
Apr 200402,33134.475.86$13,656
Mar 200403,18534.365.53$17,614
Feb 200402,55532.455.51$14,077
Jan 200403,58032.036.30$22,553
Dec 200302,67630.266.30$16,863
Nov 200302,64628.804.60$12,159
Oct 200304,50028.174.76$21,418
Sep 20031794,49526.314.75$26,058
Aug 200305,30329.765.13$27,203
Jul 200305,42029.415.17$28,026
Jun 20031867,40528.565.98$49,616
May 200308,82626.595.97$52,715
Apr 200305,55826.675.41$30,054
Mar 2003011031.146.10$671
Feb 20030033.487.93$0
Jan 2003072330.315.58$4,036
Dec 2002056026.914.85$2,718
Nov 200201,01024.664.14$4,178
Oct 200201,46926.464.23$6,213
Sep 200202,14027.443.64$7,779
Aug 200203,65725.963.16$11,571
Jul 200204,08524.583.06$12,507
Jun 200204,37123.733.34$14,591
May 200205,00724.663.58$17,945
Apr 200207,02223.653.51$24,664
Mar 200206,60522.003.10$20,493
Feb 200206,85418.222.38$16,283
Jan 200206,61317.172.38$15,710
Dec 20011727,00416.932.36$19,472
Nov 200105,29918.072.41$12,747
Oct 200105,63919.782.53$14,260
Sep 200106,46924.262.25$14,564
Aug 200106,94924.873.05$21,216
Jul 200105,08623.933.20$16,260
Jun 20011837,16624.563.82$31,898
May 200106,48525.524.31$27,933
Apr 200106,00424.685.34$32,033
Mar 200105,88524.545.38$31,640
Feb 200105,79527.755.77$33,420
Jan 200104,36927.478.40$36,694
Dec 20001845,24126.889.12$52,757
Nov 200006,24632.215.66$35,340
Oct 200006,36831.235.15$32,767
Sep 200005,42131.875.19$28,116
Aug 200007,44829.644.54$33,820
Jul 20001837,19128.534.09$34,630
Jun 200008,80129.304.40$38,700
May 2000010,60827.263.68$39,035
Apr 200017910,54224.513.12$37,236
Mar 200006,90428.422.86$19,744
Feb 200008,61927.622.73$23,500
Jan 200006,86125.272.48$17,019
Dec 199906,34524.282.42$15,379
Nov 19991924,94423.192.43$16,486
Oct 199907,42820.982.80$20,826
Sep 19991964,40121.752.62$15,789
Aug 199904,48519.262.88$12,897
Jul 1999955,40617.892.37$14,525
Jun 19991916,49715.942.36$18,391
May 199906,34615.792.32$14,729
Apr 199909,68415.102.21$21,383
Mar 19991924,29812.471.84$10,295
Feb 199903,7789.981.82$6,868
Jan 19991965,70210.381.90$12,868
Dec 19981845,5459.201.77$11,526
Nov 199804,60210.892.19$10,059
Oct 19981434,78712.421.97$11,203
Sep 19981744,49412.592.08$11,550
Aug 19981905,60911.301.91$12,845
Jul 19981916,40011.742.24$16,561
Jun 19981915,83211.242.24$15,195
May 199807,51112.622.21$16,572
Apr 19983746,86213.042.51$22,069
Mar 19981938,41012.802.31$21,893
Feb 19981898,05913.952.30$21,165
Jan 199838313,38314.702.15$34,468
Dec 199737710,84416.322.41$32,299
Nov 199738210,80318.193.09$40,311
Oct 199737311,80719.253.15$44,370
Sep 199738314,14617.742.95$48,594
Aug 199755114,83417.862.55$47,738
Jul 199754916,61317.582.25$46,980
Jun 199774619,48417.242.26$56,840
May 19971,09627,96018.972.31$85,337
Apr 19971,70140,93117.882.08$115,664
Mar 199701,32118.951.94$2,562

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2012 — as filed, then multipliedworked
Condensate           176 bbl  × $ 91.61 =    $16,123
Gas                    0 Mcf  × $  2.49 =         $0

────────────────────────────────────────────────────
Month total                                  $16,123

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 02/G/162979 is the state's own key, not one this site invented.