MCLEOD GAS UNIT

Operated by ALLEGRO INVESTMENTS, INC. (P-5 13305) in the EDNA, SOUTH (FRIO 5140) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 167425District 02Field 27697150CondensateGasSave
Value, all time
$8.7 M
Feb 1998 – Jan 2006
Value, last 12 filed months
$1 k
at the published price for each month
Months reported
96
no gaps in the span
Streams
2
condensate, gas

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition5,935 bbl$128,490
GasProduction2,325,011 Mcf$8,585,648
Total$8,714,138

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 28.9326, -96.6271. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

28.93264, -96.62713 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
6,870 ft
1 wells filed one
Completion to plug
7.9 years
median over 1 wells

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 6,870 ft.

Completions filed
Feb 1998
1 of 1 wells
Plug dates filed
Jan 2006
1 of 1 wells

Last completion to plug: a median of 7.9 years across the 1 well that filed both dates, with the middle half between 7.9 years and 7.9 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-239329831-C6,870 ftFeb 1998Jan 2006Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (96)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

96 months

Jan 20060060.598.93$0
Dec 200519054.9413.42$1,044
Nov 20050054.6910.59$0
Oct 20050058.3413.80$0
Sep 20050061.4512.08$0
Aug 20050061.519.80$0
Jul 20050055.697.84$0
Jun 20050052.337.38$0
May 20050045.226.65$0
Apr 20050049.207.36$0
Mar 20050050.377.15$0
Feb 20050045.226.31$0
Jan 20050043.166.32$0
Dec 20040039.866.75$0
Nov 20040045.286.33$0
Oct 20040049.706.52$0
Sep 20040043.245.28$0
Aug 20040042.375.55$0
Jul 20040038.286.08$0
Jun 20040036.106.43$0
May 20040037.486.49$0
Apr 20040034.475.86$0
Mar 20040034.365.53$0
Feb 20040032.455.51$0
Jan 20040032.036.30$0
Dec 20030030.266.30$0
Nov 20030028.804.60$0
Oct 20030028.174.76$0
Sep 20030026.314.75$0
Aug 20030029.765.13$0
Jul 20030029.415.17$0
Jun 20030028.565.98$0
May 20030026.595.97$0
Apr 20030026.675.41$0
Mar 2003018931.146.10$1,152
Feb 200302,49733.487.93$19,791
Jan 200305,40030.315.58$30,143
Dec 200202,03026.914.85$9,853
Nov 200204,22624.664.14$17,483
Oct 200202,95926.464.23$12,514
Sep 200202,84627.443.64$10,346
Aug 2002081225.963.16$2,569
Jul 200205,95724.583.06$18,239
Jun 200205,57723.733.34$18,617
May 200207,95024.663.58$28,493
Apr 20020023.653.51$0
Mar 200207,14822.003.10$22,178
Feb 2002017,06818.222.38$40,548
Jan 2002035,14317.172.38$83,489
Dec 20017846,01616.932.36$110,121
Nov 2001054,47718.072.41$131,046
Oct 200115854,50619.782.53$140,964
Sep 200116758,40124.262.25$135,531
Aug 200117583,28124.873.05$258,622
Jul 200115976,98423.933.20$249,929
Jun 200117372,50524.563.82$281,520
May 200117872,26025.524.31$315,790
Apr 200116175,18724.685.34$405,120
Mar 200116475,42724.545.38$409,553
Feb 200117367,45127.755.77$393,796
Jan 200116873,29027.478.40$620,160
Dec 200017871,70926.889.12$658,950
Nov 200015870,53032.215.66$404,148
Oct 200016570,49331.235.15$367,875
Sep 200017760,61231.875.19$320,005
Aug 200016062,71229.644.54$289,502
Jul 200017658,47528.534.09$244,169
Jun 200015951,52829.304.40$231,240
May 2000049,15927.263.68$180,893
Apr 200017645,84624.513.12$147,170
Mar 2000046,77028.422.86$133,751
Feb 200018142,93427.622.73$122,059
Jan 200018147,14425.272.48$121,515
Dec 1999049,87124.282.42$120,873
Nov 199918548,19523.192.43$121,596
Oct 199918649,53620.982.80$142,787
Sep 1999043,91121.752.62$114,996
Aug 199917538,85419.262.88$115,099
Jul 199917039,29417.892.37$96,261
Jun 1999037,62615.942.36$88,876
May 199916532,97615.792.32$79,143
Apr 199917529,02815.102.21$66,738
Mar 1999029,49512.471.84$54,222
Feb 199918827,1989.981.82$51,316
Jan 199917829,42810.381.90$57,759
Dec 199818029,0599.201.77$53,187
Nov 1998026,30110.892.19$57,487
Oct 199818029,57912.421.97$60,483
Sep 1998027,34912.592.08$56,958
Aug 199816529,67811.301.91$58,471
Jul 199817526,72011.742.24$61,834
Jun 1998026,17211.242.24$58,554
May 199816026,62012.622.21$60,752
Apr 199816924,35113.042.51$63,211
Mar 1998024,81912.802.31$57,318
Feb 1998011,45213.952.30$26,330

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Dec 2005 — as filed, then multipliedworked
Condensate            19 bbl  × $ 54.94 =     $1,044
Gas                    0 Mcf  × $ 13.42 =         $0

────────────────────────────────────────────────────
Month total                                   $1,044

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 02/G/167425 is the state's own key, not one this site invented.