O'BRIEN-HARKINS

Operated by C & E OPERATING, INC. (P-5 120079) in the OBRIEN RANCH (FRIO 4650) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 170010District 02Field 66655250GasSaveExport
Value, all time
$1.1 M
Jun 1998 – May 2011
Value, last 12 filed months
$0
at the published price for each month
Months reported
156
no gaps in the span
Streams
1
gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 4 leases and 4 wells, and the rule below applies to all of them.

Discovered
1972-08-19
as the register files it
Field class
Oil and gas
the register's own label
Between wells
no field rule filed
From a lease line
no field rule filed

The Commission's schedule remark for this field reads: AOF-1 AND AOF-2 EFFECTIVE 07/01/1999.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
GasProduction240,134 Mcf$1,067,744
Total$1,067,744

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 28.4870, -97.4181. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

28.48695, -97.41813 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
5,150 ft
1 wells filed one
Completion to plug
12.9 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 5,150 ft.

Completions filed
Jun 1998
1 of 1 wells
Plug dates filed
May 2011
1 of 1 wells

Last completion to plug: a median of 12.9 years across the 1 well that filed both dates, with the middle half between 12.9 years and 12.9 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-175330775-T5,150 ftJun 1998May 2011Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (156)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

156 months

May 2011098.134.40$0
Apr 20110105.964.33$0
Mar 2011096.364.06$0
Feb 2011085.644.18$0
Jan 2011086.504.59$0
Dec 2010085.734.35$0
Nov 2010080.843.80$0
Oct 2010078.103.51$0
Sep 2010072.633.98$0
Aug 2010073.684.42$0
Jul 2010072.554.74$0
Jun 2010070.364.91$0
May 2010071.124.24$0
Apr 2010081.694.12$0
Mar 2010078.394.39$0
Feb 2010073.585.44$0
Jan 2010074.365.96$0
Dec 200954271.445.48$2,972
Nov 200965174.593.75$2,442
Oct 200937972.544.11$1,558
Sep 200965165.543.06$1,995
Aug 200959867.423.22$1,925
Jul 200949161.133.46$1,701
Jun 200957866.163.90$2,251
May 200937054.743.93$1,453
Apr 200926846.773.59$961
Mar 200932742.144.06$1,327
Feb 200946032.814.63$2,131
Jan 200960935.865.37$3,271
Dec 200854837.105.98$3,275
Nov 200817655.496.86$1,207
Oct 200832475.246.92$2,243
Sep 2008380101.767.88$2,993
Aug 2008272114.228.48$2,307
Jul 2008367131.0811.39$4,180
Jun 2008423131.3313.03$5,513
May 2008450123.1711.57$5,208
Apr 2008452110.3110.45$4,726
Mar 2008330101.909.66$3,189
Feb 200825792.538.77$2,254
Jan 200831990.388.21$2,618
Dec 200741088.337.30$2,994
Nov 200734191.677.29$2,486
Oct 200764482.856.92$4,458
Sep 200765975.846.24$4,115
Aug 200747469.066.39$3,028
Jul 200739270.906.39$2,504
Jun 200758462.007.55$4,408
May 200755558.747.85$4,355
Apr 200744859.617.81$3,497
Mar 200754056.927.30$3,943
Feb 200758455.108.22$4,798
Jan 200771850.306.73$4,830
Dec 200655356.656.92$3,826
Nov 200665854.207.62$5,012
Oct 20061,09354.906.01$6,573
Sep 20061,10760.085.04$5,576
Aug 20061,02668.717.34$7,531
Jul 20061,15869.376.34$7,345
Jun 20061,25066.286.38$7,980
May 20061,38666.016.42$8,905
Apr 20061,24364.397.36$9,149
Mar 20061,59256.707.08$11,276
Feb 20061,36257.597.75$10,557
Jan 20061,62860.598.93$14,543
Dec 20051,73454.9413.42$23,262
Nov 20051,94854.6910.59$20,626
Oct 20051,65158.3413.80$22,777
Sep 20051,66461.4512.08$20,099
Aug 20051,99661.519.80$19,554
Jul 20052,07155.697.84$16,244
Jun 20051,75252.337.38$12,932
May 20051,73045.226.65$11,507
Apr 20051,68749.207.36$12,417
Mar 20051,62050.377.15$11,591
Feb 20051,48545.226.31$9,373
Jan 20051,67143.166.32$10,564
Dec 20041,38939.866.75$9,377
Nov 20041,03745.286.33$6,565
Oct 200499349.706.52$6,469
Sep 200498343.245.28$5,194
Aug 20041,03442.375.55$5,739
Jul 200495438.286.08$5,804
Jun 200485036.106.43$5,468
May 200484037.486.49$5,455
Apr 200440134.475.86$2,349
Mar 200435634.365.53$1,969
Feb 20041,03432.455.51$5,697
Jan 200491332.036.30$5,752
Dec 20031,29930.266.30$8,186
Nov 20031,17928.804.60$5,418
Oct 20031,34028.174.76$6,378
Sep 20031,09626.314.75$5,205
Aug 20031,20629.765.13$6,186
Jul 20031,10229.415.17$5,698
Jun 20031,04528.565.98$6,252
May 20031,12426.595.97$6,713
Apr 20031,09326.675.41$5,910
Mar 20031,12331.146.10$6,846
Feb 200399833.487.93$7,910
Jan 20031,07130.315.58$5,978
Dec 20021,15426.914.85$5,601
Nov 20021,21624.664.14$5,031
Oct 20021,31026.464.23$5,540
Sep 20021,21327.443.64$4,410
Aug 20021,34125.963.16$4,243
Jul 20021,55824.583.06$4,770
Jun 20021,43223.733.34$4,780
May 20021,61124.663.58$5,774
Apr 20021,47323.653.51$5,174
Mar 20021,58922.003.10$4,930
Feb 20021,42018.222.38$3,373
Jan 20021,85117.172.38$4,397
Dec 20011,87616.932.36$4,436
Nov 20011,57418.072.41$3,786
Oct 20011,63419.782.53$4,132
Sep 20011,33024.262.25$2,994
Aug 20011,39424.873.05$4,256
Jul 20011,40723.933.20$4,498
Jun 20011,58124.563.82$6,046
May 20011,87225.524.31$8,063
Apr 20011,81524.685.34$9,684
Mar 20011,68324.545.38$9,049
Feb 20012,09627.755.77$12,088
Jan 20013,23327.478.40$27,153
Dec 20003,47226.889.12$31,673
Nov 20003,91732.215.66$22,162
Oct 20004,31531.235.15$22,203
Sep 20003,88831.875.19$20,165
Aug 20004,23429.644.54$19,226
Jul 20004,61028.534.09$18,854
Jun 20003,93429.304.40$17,299
May 20001,63627.263.68$6,020
Apr 20001,13724.513.12$3,543
Mar 200086628.422.86$2,477
Feb 20001,23727.622.73$3,373
Jan 20003,64525.272.48$9,041
Dec 19996,17124.282.42$14,957
Nov 19996,72323.192.43$16,364
Oct 19995,22020.982.80$14,635
Sep 19994,11821.752.62$10,784
Aug 19993,93319.262.88$11,310
Jul 19994,25417.892.37$10,092
Jun 19995,31115.942.36$12,545
May 19995,77015.792.32$13,392
Apr 19995,21715.102.21$11,519
Mar 19995,74212.471.84$10,556
Feb 19995809.981.82$1,054
Jan 19992,75810.381.90$5,240
Dec 19985,2719.201.77$9,347
Nov 19983,31010.892.19$7,235
Oct 19985,68512.421.97$11,195
Sep 19987,08412.592.08$14,753
Aug 199811,22011.301.91$21,400
Jul 1998011.742.24$0
Jun 199811711.242.24$262

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Dec 2009 — as filed, then multipliedworked
Gas                  542 Mcf  × $  5.48 =     $2,972

────────────────────────────────────────────────────
Month total                                   $2,972

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 02/G/170010 is the state's own key, not one this site invented.