BP

Operated by T - C OIL COMPANY (P-5 833850) in the LAKE PASTURE, WEST (2100) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 172090District 02Field 51518500GasSaveExport
Value, all time
$16.8 M
Dec 1998 – May 2011
Value, last 12 filed months
$56 k
at the published price for each month
Months reported
150
no gaps in the span
Streams
1
gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 6 leases and 6 wells, and the rule below applies to all of them.

Discovered
1957-11-01
as the register files it
Field class
Gas
the register's own label
Between wells
no field rule filed
From a lease line
no field rule filed

The Commission's schedule remark for this field reads: AOF-1 AND AOF-2 EFFECTIVE 04/01/2007.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
GasProduction2,869,040 Mcf$16,784,373
Total$16,784,373

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 28.4504, -97.0890. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

28.45035, -97.08897 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
4,700 ft
1 wells filed one
Completion to plug
12.0 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 4,700 ft.

Completions filed
May 2011
1 of 1 wells
Plug dates filed
May 2023
1 of 1 wells

Last completion to plug: a median of 12.0 years across the 1 well that filed both dates, with the middle half between 12.0 years and 12.0 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-3913225744,700 ftMay 2011May 2023Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (150)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

150 months

May 2011098.134.40$0
Apr 2011348105.964.33$1,508
Mar 20111,26496.364.06$5,128
Feb 201155685.644.18$2,324
Jan 201170586.504.59$3,235
Dec 20101,28685.734.35$5,591
Nov 20101,27380.843.80$4,831
Oct 20101,27878.103.51$4,484
Sep 20101,17172.633.98$4,660
Aug 20101,64073.684.42$7,248
Jul 20101,89872.554.74$8,990
Jun 20101,54370.364.91$7,577
May 20101,87271.124.24$7,928
Apr 20101,77581.694.12$7,318
Mar 20101,20578.394.39$5,288
Feb 20101,84073.585.44$10,014
Jan 20101,95674.365.96$11,666
Dec 20091,95271.445.48$10,704
Nov 20092,08374.593.75$7,814
Oct 20091,81872.544.11$7,472
Sep 20091,94365.543.06$5,955
Aug 20092,06967.423.22$6,659
Jul 20092,37061.133.46$8,211
Jun 20092,27066.163.90$8,842
May 20092,16654.743.93$8,503
Apr 20092,57146.773.59$9,223
Mar 20092,57442.144.06$10,448
Feb 20092,12732.814.63$9,854
Jan 20092,61435.865.37$14,040
Dec 20082,74737.105.98$16,419
Nov 20082,21955.496.86$15,223
Oct 20082,67475.246.92$18,509
Sep 20082,387101.767.88$18,803
Aug 20082,473114.228.48$20,979
Jul 20082,628131.0811.39$29,931
Jun 20083,132131.3313.03$40,818
May 20083,288123.1711.57$38,056
Apr 20083,194110.3110.45$33,393
Mar 200856101.909.66$541
Feb 20082,32192.538.77$20,357
Jan 20082,51990.388.21$20,670
Dec 20072,55188.337.30$18,627
Nov 20072,68391.677.29$19,564
Oct 20073,51882.856.92$24,352
Sep 20074,51075.846.24$28,161
Aug 20075,24969.066.39$33,530
Jul 20075,82070.906.39$37,178
Jun 20076,29562.007.55$47,517
May 20077,21458.747.85$56,603
Apr 20078,34459.617.81$65,127
Mar 20079,93656.927.30$72,552
Feb 20078,05755.108.22$66,196
Jan 20078,16950.306.73$54,952
Dec 20069,09956.656.92$62,951
Nov 20064,56554.207.62$34,774
Oct 20067,89154.906.01$47,455
Sep 20067,50860.085.04$37,819
Aug 200610,07968.717.34$73,979
Jul 200612,98169.376.34$82,335
Jun 200614,89166.286.38$95,062
May 200615,08166.016.42$96,895
Apr 200616,91964.397.36$124,532
Mar 200618,80256.707.08$133,173
Feb 200623,79057.597.75$184,399
Jan 200629,18860.598.93$260,746
Dec 200534,30254.9413.42$460,175
Nov 200536,88054.6910.59$390,500
Oct 200543,26058.3413.80$596,805
Sep 200544,56261.4512.08$538,264
Aug 200546,89561.519.80$459,423
Jul 200554,01755.697.84$423,690
Jun 200560,71652.337.38$448,147
May 200574,27645.226.65$494,022
Apr 200578,46149.207.36$577,511
Mar 200583,03450.377.15$594,098
Feb 200584,18845.226.31$531,388
Jan 200586,22643.166.32$545,138
Dec 200478,83239.866.75$532,201
Nov 200460,29845.286.33$381,712
Oct 200450,09849.706.52$326,393
Sep 200452,76943.245.28$278,826
Aug 200455,55942.375.55$308,389
Jul 200457,85438.286.08$351,994
Jun 200457,73336.106.43$371,398
May 200463,50437.486.49$412,432
Apr 200462,42834.475.86$365,732
Mar 200451,01234.365.53$282,104
Feb 200418,86232.455.51$103,922
Jan 200418,30332.036.30$115,302
Dec 200318,17030.266.30$114,501
Nov 200317,14728.804.60$78,793
Oct 200318,35228.174.76$87,349
Sep 200319,43326.314.75$92,294
Aug 200316,72329.765.13$85,784
Jul 200315,43529.415.17$79,812
Jun 200317,56228.565.98$105,073
May 200318,55326.595.97$110,811
Apr 200317,46226.675.41$94,422
Mar 200319,24331.146.10$117,306
Feb 200316,00733.487.93$126,870
Jan 200316,69430.315.58$93,187
Dec 200217,13826.914.85$83,184
Nov 200215,55324.664.14$64,342
Oct 200217,31926.464.23$73,244
Sep 200215,17827.443.64$55,175
Aug 200213,32625.963.16$42,166
Jul 200211,81724.583.06$36,181
Jun 200212,02023.733.34$40,126
May 200212,78224.663.58$45,811
Apr 200211,57623.653.51$40,659
Mar 200212,50822.003.10$38,809
Feb 200211,00918.222.38$26,154
Jan 200211,48917.172.38$27,294
Dec 200111,23916.932.36$26,573
Nov 200134418.072.41$828
Oct 2001019.782.53$0
Sep 2001024.262.25$0
Aug 2001024.873.05$0
Jul 2001023.933.20$0
Jun 20013,75324.563.82$14,352
May 200127,13325.524.31$116,871
Apr 200126,78024.685.34$142,880
Mar 200127,69724.545.38$148,911
Feb 200125,47927.755.77$146,939
Jan 200124,22527.478.40$203,460
Dec 20009,43326.889.12$86,053
Nov 200021,23832.215.66$120,165
Oct 200022,17631.235.15$114,107
Sep 200022,58831.875.19$117,153
Aug 200030,11829.644.54$136,758
Jul 200029,95928.534.09$122,525
Jun 200024,06629.304.40$105,824
May 200029,81127.263.68$109,697
Apr 200031,84524.513.12$99,229
Mar 200032,67828.422.86$93,451
Feb 200030,15127.622.73$82,207
Jan 200027,66825.272.48$68,630
Dec 199928,15724.282.42$68,245
Nov 199926,83023.192.43$65,304
Oct 199928,57420.982.80$80,113
Sep 199927,91621.752.62$73,108
Aug 199927,81719.262.88$79,991
Jul 199928,76717.892.37$68,246
Jun 199930,31815.942.36$71,614
May 199935,88715.792.32$83,294
Apr 199935,45415.102.21$78,284
Mar 199937,65112.471.84$69,215
Feb 199924,5679.981.82$44,658
Jan 199929,49410.381.90$56,037
Dec 19981,7179.201.77$3,045

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Apr 2011 — as filed, then multipliedworked
Gas                  348 Mcf  × $  4.33 =     $1,508

────────────────────────────────────────────────────
Month total                                   $1,508

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 02/G/172090 is the state's own key, not one this site invented.