LACEY, VIRGINIA

Operated by WHITING OIL AND GAS CORPORATION (P-5 920478) in the HOLYFIELD FAN MAN SAND (EY-3-B) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 174216District 02Field 42371081CondensateGasSaveExport
Value, all time
$370 k
Jul 1998 – Apr 2008
Value, last 12 filed months
$0
at the published price for each month
Months reported
118
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 3 leases and 3 wells, and the rule below applies to all of them.

Discovered
1997-01-02
as the register files it
Field class
Gas
the register's own label
Between wells
no field rule filed
From a lease line
no field rule filed

The Commission's schedule remark for this field reads: FIELD MADE 100 % AOF PER AOF 1 & 2 FORMS FILED 11/7/01

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition195 bbl$10,745
GasProduction68,566 Mcf$359,691
Total$370,435

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 29.3499, -96.8239. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

29.34989, -96.82389 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
5,110 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 5,110 ft.

Plug dates filed
Feb 2007
1 of 1 wells

1 well

42-285320621-C5,110 ftFeb 2007Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (118)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

118 months

Apr 200800110.3110.45$0
Mar 200800101.909.66$0
Feb 20080092.538.77$0
Jan 20080090.388.21$0
Dec 20070088.337.30$0
Nov 20070091.677.29$0
Oct 20070082.856.92$0
Sep 20070075.846.24$0
Aug 20070069.066.39$0
Jul 20070070.906.39$0
Jun 20070062.007.55$0
May 20070058.747.85$0
Apr 20070059.617.81$0
Mar 20070056.927.30$0
Feb 2007195055.108.22$10,745
Jan 20070050.306.73$0
Dec 20060056.656.92$0
Nov 20060054.207.62$0
Oct 20060054.906.01$0
Sep 20060060.085.04$0
Aug 20060068.717.34$0
Jul 20060069.376.34$0
Jun 2006037466.286.38$2,388
May 2006046966.016.42$3,013
Apr 2006047264.397.36$3,474
Mar 20060056.707.08$0
Feb 2006043057.597.75$3,333
Jan 2006077960.598.93$6,959
Dec 2005083054.9413.42$11,135
Nov 2005060754.6910.59$6,427
Oct 2005081558.3413.80$11,244
Sep 200501,01261.4512.08$12,224
Aug 200501,22861.519.80$12,031
Jul 2005080355.697.84$6,298
Jun 2005087452.337.38$6,451
May 2005022045.226.65$1,463
Apr 2005074149.207.36$5,454
Mar 200501,19450.377.15$8,543
Feb 20050045.226.31$0
Jan 20050043.166.32$0
Dec 20040039.866.75$0
Nov 20040045.286.33$0
Oct 2004018549.706.52$1,205
Sep 2004088243.245.28$4,660
Aug 2004083042.375.55$4,607
Jul 200401,95538.286.08$11,895
Jun 200401,76036.106.43$11,322
May 200401,25337.486.49$8,138
Apr 200401,62134.475.86$9,497
Mar 200401,63834.365.53$9,058
Feb 200401,61332.455.51$8,887
Jan 200401,00732.036.30$6,344
Dec 200301,41630.266.30$8,923
Nov 200301,29728.804.60$5,960
Oct 2003083628.174.76$3,979
Sep 200301,08626.314.75$5,158
Aug 200301,17829.765.13$6,043
Jul 200301,31629.415.17$6,805
Jun 200301,90728.565.98$11,410
May 2003094326.595.97$5,632
Apr 2003035826.675.41$1,936
Mar 2003097631.146.10$5,950
Feb 200301,60833.487.93$12,745
Jan 200302,41030.315.58$13,453
Dec 200201,92826.914.85$9,358
Nov 200202,23924.664.14$9,263
Oct 200202,55126.464.23$10,788
Sep 200201,64027.443.64$5,962
Aug 200202,03125.963.16$6,426
Jul 2002071924.583.06$2,201
Jun 2002038123.733.34$1,272
May 2002027224.663.58$975
Apr 200203,47823.653.51$12,216
Mar 200204,09522.003.10$12,706
Feb 200203,94418.222.38$9,370
Jan 200202,46517.172.38$5,856
Dec 2001065716.932.36$1,553
Nov 20010018.072.41$0
Oct 20010019.782.53$0
Sep 20010024.262.25$0
Aug 2001029324.873.05$895
Jul 2001021723.933.20$694
Jun 20010024.563.82$0
May 20010025.524.31$0
Apr 20010024.685.34$0
Mar 20010024.545.38$0
Feb 20010027.755.77$0
Jan 20010027.478.40$0
Dec 20000026.889.12$0
Nov 20000032.215.66$0
Oct 20000031.235.15$0
Sep 20000031.875.19$0
Aug 20000029.644.54$0
Jul 20000028.534.09$0
Jun 20000029.304.40$0
May 20000027.263.68$0
Apr 20000024.513.12$0
Mar 20000028.422.86$0
Feb 20000027.622.73$0
Jan 20000025.272.48$0
Dec 19990024.282.42$0
Nov 19990023.192.43$0
Oct 19990020.982.80$0
Sep 19990021.752.62$0
Aug 19990019.262.88$0
Jul 19990017.892.37$0
Jun 19990015.942.36$0
May 19990015.792.32$0
Apr 19990015.102.21$0
Mar 19990012.471.84$0
Feb 1999009.981.82$0
Jan 19990010.381.90$0
Dec 1998009.201.77$0
Nov 19980010.892.19$0
Oct 19980012.421.97$0
Sep 19980012.592.08$0
Aug 19980011.301.91$0
Jul 199802,73311.742.24$6,114

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Feb 2007 — as filed, then multipliedworked
Condensate           195 bbl  × $ 55.10 =    $10,745
Gas                    0 Mcf  × $  8.22 =         $0

────────────────────────────────────────────────────
Month total                                  $10,745

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 02/G/174216 is the state's own key, not one this site invented.