ARNOLD

Operated by NELSON, JAMES L. (P-5 604295) in the KAREN BEAUCHAMP (2900) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 175292District 02Field 48104799GasSaveExport
Value, all time
$361 k
Jul 1999 – Feb 2008
Value, last 12 filed months
$0
at the published price for each month
Months reported
104
no gaps in the span
Streams
1
gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 3 leases and 3 wells, and the rule below applies to all of them.

Discovered
1964-08-10
as the register files it
Field class
Gas
the register's own label
Between wells
no field rule filed
From a lease line
no field rule filed

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
GasProduction79,173 Mcf$360,619
Total$360,619

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 28.7680, -97.4614. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

28.76805, -97.46138 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
3,110 ft
1 wells filed one
Completion to plug
8.6 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 3,110 ft.

Completions filed
Jul 1999
1 of 1 wells
Plug dates filed
Feb 2008
1 of 1 wells

Last completion to plug: a median of 8.6 years across the 1 well that filed both dates, with the middle half between 8.6 years and 8.6 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-1753316313,110 ftJul 1999Feb 2008Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (104)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

104 months

Feb 2008092.538.77$0
Jan 2008090.388.21$0
Dec 2007088.337.30$0
Nov 2007091.677.29$0
Oct 2007082.856.92$0
Sep 2007075.846.24$0
Aug 2007069.066.39$0
Jul 2007070.906.39$0
Jun 2007062.007.55$0
May 2007058.747.85$0
Apr 2007059.617.81$0
Mar 2007056.927.30$0
Feb 2007055.108.22$0
Jan 2007050.306.73$0
Dec 2006056.656.92$0
Nov 2006054.207.62$0
Oct 2006054.906.01$0
Sep 2006060.085.04$0
Aug 2006068.717.34$0
Jul 2006069.376.34$0
Jun 200620166.286.38$1,283
May 200620166.016.42$1,291
Apr 200617164.397.36$1,259
Mar 200619156.707.08$1,353
Feb 200616157.597.75$1,248
Jan 200616160.598.93$1,438
Dec 200520554.9413.42$2,750
Nov 200526854.6910.59$2,838
Oct 200526558.3413.80$3,656
Sep 200518361.4512.08$2,210
Aug 200519161.519.80$1,871
Jul 200510255.697.84$800
Jun 200514052.337.38$1,033
May 200510245.226.65$678
Apr 200510249.207.36$751
Mar 200510850.377.15$773
Feb 200510845.226.31$682
Jan 200513543.166.32$854
Dec 200410139.866.75$682
Nov 200410745.286.33$677
Oct 200418149.706.52$1,179
Sep 200421543.245.28$1,136
Aug 200435142.375.55$1,948
Jul 200417538.286.08$1,065
Jun 200419836.106.43$1,274
May 200413337.486.49$864
Apr 200417334.475.86$1,014
Mar 200412334.365.53$680
Feb 200414132.455.51$777
Jan 200419532.036.30$1,228
Dec 200339430.266.30$2,483
Nov 200341328.804.60$1,898
Oct 200324928.174.76$1,185
Sep 200341626.314.75$1,976
Aug 200344029.765.13$2,257
Jul 200333229.415.17$1,717
Jun 200339228.565.98$2,345
May 200318126.595.97$1,081
Apr 200385026.675.41$4,596
Mar 200389131.146.10$5,432
Feb 200388533.487.93$7,014
Jan 200361030.315.58$3,405
Dec 200282326.914.85$3,995
Nov 20021,09924.664.14$4,547
Oct 20021,14426.464.23$4,838
Sep 20021,10127.443.64$4,002
Aug 20021,53225.963.16$4,847
Jul 20021,35024.583.06$4,133
Jun 200237623.733.34$1,255
May 200257524.663.58$2,061
Apr 20021,25523.653.51$4,408
Mar 20022,25922.003.10$7,009
Feb 200288918.222.38$2,112
Jan 2002017.172.38$0
Dec 2001016.932.36$0
Nov 200151318.072.41$1,234
Oct 20011,03019.782.53$2,605
Sep 200180624.262.25$1,815
Aug 200182024.873.05$2,504
Jul 200166923.933.20$2,139
Jun 20011,01224.563.82$3,870
May 20011,20725.524.31$5,199
Apr 20011,16424.685.34$6,210
Mar 20011,41624.545.38$7,613
Feb 20011,34727.755.77$7,768
Jan 20012,56727.478.40$21,560
Dec 20002,73426.889.12$24,941
Nov 20003,97032.215.66$22,462
Oct 20004,12031.235.15$21,199
Sep 20004,36231.875.19$22,624
Aug 20002,50129.644.54$11,356
Jul 20002,21728.534.09$9,067
Jun 20002,57829.304.40$11,336
May 20001,88827.263.68$6,947
Apr 20001,93724.513.12$6,036
Mar 20002,49128.422.86$7,124
Feb 20002,43827.622.73$6,647
Jan 20002,01125.272.48$4,988
Dec 19991,93024.282.42$4,678
Nov 19991,61823.192.43$3,938
Oct 19992,66920.982.80$7,483
Sep 19993,30021.752.62$8,642
Aug 1999019.262.88$0
Jul 199931417.892.37$745

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Jun 2006 — as filed, then multipliedworked
Gas                  201 Mcf  × $  6.38 =     $1,283

────────────────────────────────────────────────────
Month total                                   $1,283

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 02/G/175292 is the state's own key, not one this site invented.