WOOD

Operated by CHARRO OPERATING, L.L.C. (P-5 146621) in the SARCO CREEK (2800) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 181582District 02Field 81077166GasSaveExport
Value, all time
$3.8 M
Sep 2000 – Oct 2017
Value, last 12 filed months
$0
at the published price for each month
Months reported
206
no gaps in the span
Streams
1
gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 33 leases and 33 wells, and the rule below applies to all of them.

Discovered
1947-05-02
as the register files it
Field class
Gas
the register's own label
Between wells
no field rule filed
From a lease line
no field rule filed

The Commission's schedule remark for this field reads: ALLOCATION FORMULA SUSPENDED PER OPERATOR REQUEST 01-01-93

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
GasProduction642,723 Mcf$3,826,404
Total$3,826,404

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 28.5158, -97.3609. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

28.51583, -97.36089 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
5,264 ft
1 wells filed one
Completion to plug
17.2 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 5,264 ft.

Completions filed
Sep 2000
1 of 1 wells
Plug dates filed
Nov 2017
1 of 1 wells

Last completion to plug: a median of 17.2 years across the 1 well that filed both dates, with the middle half between 17.2 years and 17.2 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-17533243585,264 ftSep 2000Nov 2017Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (206)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

206 months

Oct 2017049.292.98$0
Sep 2017047.523.09$0
Aug 2017045.373.00$0
Jul 2017043.873.09$0
Jun 2017042.493.09$0
May 2017045.373.26$0
Apr 2017047.933.21$0
Mar 2017046.772.98$0
Feb 2017050.452.95$0
Jan 2017049.413.42$0
Dec 2016048.763.72$0
Nov 2016042.492.64$0
Oct 2016046.193.09$0
Sep 2016041.553.10$0
Aug 2016041.442.92$0
Jul 2016041.622.92$0
Jun 2016045.352.69$0
May 2016042.521.99$0
Apr 2016036.561.99$0
Mar 2016033.011.79$0
Feb 2016026.472.06$0
Jan 2016027.352.36$0
Dec 2015032.362.00$0
Nov 2015038.792.17$0
Oct 2015043.552.43$0
Sep 2015042.992.76$0
Aug 2015040.162.87$0
Jul 2015048.152.95$0
Jun 2015056.152.88$0
May 2015055.212.96$0
Apr 2015049.822.71$0
Mar 2015042.892.93$0
Feb 2015044.662.98$0
Jan 2015043.433.10$0
Dec 2014054.693.59$0
Nov 2014070.464.25$0
Oct 2014078.303.90$0
Sep 2014086.164.05$0
Aug 2014089.394.04$0
Jul 2014096.564.18$0
Jun 2014098.164.74$0
May 2014094.734.73$0
Apr 2014095.944.81$0
Mar 2014095.895.06$0
Feb 2014097.406.19$0
Jan 2014090.404.86$0
Dec 2013091.824.35$0
Nov 20131,03488.853.74$3,865
Oct 20131,97997.423.78$7,479
Sep 20131,515104.113.72$5,632
Aug 20132,018104.253.52$7,109
Jul 20131,930102.523.72$7,175
Jun 20131,89694.403.93$7,458
May 20132,25594.834.15$9,356
Apr 20132,44293.964.28$10,458
Mar 20132,18993.623.91$8,565
Feb 20132,14191.233.42$7,322
Jan 20132,57091.603.42$8,789
Dec 20122,57786.773.42$8,814
Nov 20121,72186.953.62$6,239
Oct 20121,34989.383.40$4,586
Sep 20121,47594.672.92$4,305
Aug 20121,46592.662.91$4,260
Jul 20121,60085.133.02$4,833
Jun 20121,57079.822.52$3,955
May 20121,60491.612.49$3,991
Apr 20121,812101.652.00$3,618
Mar 20122,183105.052.22$4,851
Feb 20122,126101.102.57$5,464
Jan 20122,33298.092.73$6,376
Dec 20112,33496.873.24$7,562
Nov 20112,54495.723.31$8,424
Oct 20112,48384.983.65$9,059
Sep 20112,62183.623.99$10,447
Aug 20112,91283.404.15$12,083
Jul 20112,65594.144.52$11,993
Jun 20111,83792.904.64$8,523
May 20111,86198.134.40$8,197
Apr 20112,050105.964.33$8,883
Mar 20112,41196.364.06$9,782
Feb 20111,97385.644.18$8,247
Jan 20112,67986.504.59$12,293
Dec 20102,79185.734.35$12,135
Nov 20102,91180.843.80$11,048
Oct 20103,04378.103.51$10,678
Sep 20103,08372.633.98$12,269
Aug 20103,47373.684.42$15,348
Jul 20103,47272.554.74$16,445
Jun 20102,91570.364.91$14,314
May 20102,51271.124.24$10,639
Apr 20102,45681.694.12$10,125
Mar 20102,85178.394.39$12,512
Feb 20102,09273.585.44$11,385
Jan 20102,23774.365.96$13,342
Dec 20092,42171.445.48$13,276
Nov 20092,49874.593.75$9,371
Oct 20092,55772.544.11$10,510
Sep 20092,35665.543.06$7,221
Aug 20092,57167.423.22$8,275
Jul 20092,86861.133.46$9,936
Jun 20093,35766.163.90$13,076
May 20094,71254.743.93$18,498
Apr 20094,88346.773.59$17,518
Mar 20095,30342.144.06$21,525
Feb 20094,75432.814.63$22,025
Jan 20095,08235.865.37$27,295
Dec 20085,14737.105.98$30,764
Nov 20084,82355.496.86$33,088
Oct 20084,99375.246.92$34,561
Sep 20084,778101.767.88$37,637
Aug 20084,899114.228.48$41,558
Jul 20085,097131.0811.39$58,052
Jun 20084,866131.3313.03$63,417
May 20085,005123.1711.57$57,929
Apr 20084,618110.3110.45$48,281
Mar 20084,944101.909.66$47,779
Feb 20084,85192.538.77$42,546
Jan 20085,25890.388.21$43,146
Dec 20075,39188.337.30$39,365
Nov 20075,28191.677.29$38,507
Oct 20074,40882.856.92$30,512
Sep 20074,71675.846.24$29,447
Aug 20074,80869.066.39$30,713
Jul 20075,06370.906.39$32,342
Jun 20074,60662.007.55$34,768
May 20074,87158.747.85$38,219
Apr 20074,75259.617.81$37,090
Mar 20075,06556.927.30$36,984
Feb 20074,67655.108.22$38,418
Jan 20075,18250.306.73$34,859
Dec 20065,05656.656.92$34,980
Nov 20065,10354.207.62$38,872
Oct 20065,42954.906.01$32,649
Sep 20065,51860.085.04$27,795
Aug 20065,75968.717.34$42,271
Jul 20065,99369.376.34$38,012
Jun 20065,94466.286.38$37,946
May 20066,34366.016.42$40,754
Apr 20067,09464.397.36$52,215
Mar 20068,16156.707.08$57,804
Feb 20064,10657.597.75$31,826
Jan 20064,77060.598.93$42,612
Dec 20055,26954.9413.42$70,686
Nov 20054,61454.6910.59$48,855
Oct 20054,96258.3413.80$68,455
Sep 20055,35761.4512.08$64,707
Aug 20055,66061.519.80$55,450
Jul 20056,02555.697.84$47,258
Jun 20056,80852.337.38$50,250
May 20057,78445.226.65$51,773
Apr 20055,17849.207.36$38,113
Mar 20053,99850.377.15$28,605
Feb 20053,82745.226.31$24,156
Jan 20054,33143.166.32$27,381
Dec 20044,15239.866.75$28,030
Nov 20043,54945.286.33$22,467
Oct 20043,82449.706.52$24,914
Sep 20043,71543.245.28$19,630
Aug 20044,05042.375.55$22,480
Jul 20044,21138.286.08$25,620
Jun 20044,20436.106.43$27,044
May 20044,43137.486.49$28,777
Apr 20044,30034.475.86$25,191
Mar 20044,44134.365.53$24,559
Feb 20044,02332.455.51$22,165
Jan 20044,22232.036.30$26,597
Dec 20034,42030.266.30$27,853
Nov 20034,74128.804.60$21,786
Oct 20035,16728.174.76$24,593
Sep 20034,87026.314.75$23,129
Aug 20035,00529.765.13$25,674
Jul 20035,50429.415.17$28,460
Jun 20035,24628.565.98$31,387
May 20036,14026.595.97$36,672
Apr 20036,72526.675.41$36,364
Mar 20035,03031.146.10$30,663
Feb 20034,12633.487.93$32,702
Jan 20035,28930.315.58$29,523
Dec 20025,90226.914.85$28,647
Nov 20025,89424.664.14$24,383
Oct 20026,71126.464.23$28,382
Sep 20027,71027.443.64$28,027
Aug 20025,30225.963.16$16,776
Jul 20022,33424.583.06$7,146
Jun 20023,03223.733.34$10,122
May 20022,14224.663.58$7,677
Apr 20022,18623.653.51$7,678
Mar 20023,40322.003.10$10,559
Feb 20023,44318.222.38$8,179
Jan 20023,13217.172.38$7,441
Dec 20012,99216.932.36$7,074
Nov 20013,29018.072.41$7,914
Oct 20013,71519.782.53$9,395
Sep 20013,96724.262.25$8,931
Aug 20014,39724.873.05$13,425
Jul 20014,82523.933.20$15,426
Jun 20014,89324.563.82$18,712
May 20015,37325.524.31$23,143
Apr 20015,21324.685.34$27,813
Mar 20015,86024.545.38$31,506
Feb 20015,49227.755.77$31,673
Jan 20015,82027.478.40$48,881
Dec 20005,82826.889.12$53,166
Nov 20006,48532.215.66$36,692
Oct 20007,30331.235.15$37,578
Sep 20004,16631.875.19$21,607

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Nov 2013 — as filed, then multipliedworked
Gas                1,034 Mcf  × $  3.74 =     $3,865

────────────────────────────────────────────────────
Month total                                   $3,865

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 02/G/181582 is the state's own key, not one this site invented.