ROCHE

Operated by C & E OPERATING, INC. (P-5 120079) in the PAPALOTE (4500) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 182663District 02Field 69043568GasSaveExport
Value, all time
$437 k
Mar 2001 – Dec 2010
Value, last 12 filed months
$0
at the published price for each month
Months reported
118
no gaps in the span
Streams
1
gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 7 leases and 7 wells, and the rule below applies to all of them.

Discovered
1957-01-14
as the register files it
Field class
Oil and gas
the register's own label
Between wells
1,200 ft
minimum
From a lease line
467 ft
minimum

A drilling unit in this field needs at least 40 acres.

The Commission's schedule remark for this field reads: AOF-1 AND AOF-2 EFFECTIVE 11/01/2001.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
GasProduction97,322 Mcf$437,017
Total$437,017

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 28.2552, -97.5779. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

28.25516, -97.57794 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
5,245 ft
1 wells filed one
Completion to plug
9.8 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 5,245 ft.

Completions filed
Mar 2001
1 of 1 wells
Plug dates filed
Dec 2010
1 of 1 wells

Last completion to plug: a median of 9.8 years across the 1 well that filed both dates, with the middle half between 9.8 years and 9.8 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-0253307765,245 ftMar 2001Dec 2010Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (118)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

118 months

Dec 2010085.734.35$0
Nov 2010080.843.80$0
Oct 2010078.103.51$0
Sep 2010072.633.98$0
Aug 2010073.684.42$0
Jul 2010072.554.74$0
Jun 2010070.364.91$0
May 2010071.124.24$0
Apr 2010081.694.12$0
Mar 2010078.394.39$0
Feb 2010073.585.44$0
Jan 2010074.365.96$0
Dec 2009071.445.48$0
Nov 2009074.593.75$0
Oct 2009072.544.11$0
Sep 2009065.543.06$0
Aug 2009067.423.22$0
Jul 2009061.133.46$0
Jun 2009066.163.90$0
May 2009054.743.93$0
Apr 2009046.773.59$0
Mar 2009042.144.06$0
Feb 2009032.814.63$0
Jan 2009035.865.37$0
Dec 2008037.105.98$0
Nov 2008055.496.86$0
Oct 2008075.246.92$0
Sep 20080101.767.88$0
Aug 20080114.228.48$0
Jul 20080131.0811.39$0
Jun 20080131.3313.03$0
May 20080123.1711.57$0
Apr 200818110.3110.45$188
Mar 20080101.909.66$0
Feb 200818992.538.77$1,658
Jan 2008090.388.21$0
Dec 2007088.337.30$0
Nov 20074191.677.29$299
Oct 2007082.856.92$0
Sep 20076375.846.24$393
Aug 20073869.066.39$243
Jul 20073170.906.39$198
Jun 20071,08262.007.55$8,167
May 20071,02958.747.85$8,074
Apr 20071,09759.617.81$8,562
Mar 2007056.927.30$0
Feb 2007055.108.22$0
Jan 2007050.306.73$0
Dec 200635256.656.92$2,435
Nov 2006054.207.62$0
Oct 2006154.906.01$6
Sep 2006060.085.04$0
Aug 200616568.717.34$1,211
Jul 200650069.376.34$3,171
Jun 200614266.286.38$907
May 2006066.016.42$0
Apr 20062164.397.36$155
Mar 20066856.707.08$482
Feb 200625457.597.75$1,969
Jan 200644060.598.93$3,931
Dec 200526454.9413.42$3,542
Nov 200528754.6910.59$3,039
Oct 200534658.3413.80$4,773
Sep 200526061.4512.08$3,141
Aug 200540061.519.80$3,919
Jul 200529955.697.84$2,345
Jun 20054752.337.38$347
May 200516045.226.65$1,064
Apr 200560549.207.36$4,453
Mar 200541050.377.15$2,934
Feb 2005045.226.31$0
Jan 200540343.166.32$2,548
Dec 200414639.866.75$986
Nov 2004045.286.33$0
Oct 200472749.706.52$4,736
Sep 20041,05143.245.28$5,553
Aug 2004042.375.55$0
Jul 20041,06138.286.08$6,455
Jun 20041,23036.106.43$7,913
May 20041,11337.486.49$7,228
Apr 200416834.475.86$984
Mar 20041,08534.365.53$6,000
Feb 200492932.455.51$5,118
Jan 20041,36732.036.30$8,612
Dec 20031,54530.266.30$9,736
Nov 20031,13328.804.60$5,206
Oct 20031,16628.174.76$5,550
Sep 2003026.314.75$0
Aug 20031,00229.765.13$5,140
Jul 200386929.415.17$4,493
Jun 20031,17728.565.98$7,042
May 200384826.595.97$5,065
Apr 20031,48526.675.41$8,030
Mar 20031,47631.146.10$8,998
Feb 20031,02533.487.93$8,124
Jan 20032,13430.315.58$11,912
Dec 20022,08726.914.85$10,130
Nov 20021,97724.664.14$8,179
Oct 20022,14526.464.23$9,071
Sep 20022,05727.443.64$7,478
Aug 20021,74625.963.16$5,525
Jul 20022,94624.583.06$9,020
Jun 20022,99123.733.34$9,985
May 20022,07224.663.58$7,426
Apr 20023,57023.653.51$12,539
Mar 20022,24222.003.10$6,956
Feb 20022,07518.222.38$4,930
Jan 20023,88117.172.38$9,220
Dec 20011,95616.932.36$4,625
Nov 20013,68318.072.41$8,860
Oct 20012,94419.782.53$7,445
Sep 20013,06124.262.25$6,891
Aug 20013,22324.873.05$9,840
Jul 20013,70623.933.20$11,848
Jun 20014,60724.563.82$17,618
May 20014,81825.524.31$20,753
Apr 20015,25524.685.34$28,037
Mar 20012,53124.545.38$13,608

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Apr 2008 — as filed, then multipliedworked
Gas                   18 Mcf  × $ 10.45 =       $188

────────────────────────────────────────────────────
Month total                                     $188

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 02/G/182663 is the state's own key, not one this site invented.