BAKER-SMITH

Operated by C & E OPERATING, INC. (P-5 120079) in the BLACK BULL (FRIO 4230) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 185395District 02Field 08516200CondensateGasSaveExport
Value, all time
$1.7 M
Aug 2001 – Nov 2008
Value, last 12 filed months
$0
at the published price for each month
Months reported
88
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 6 leases and 6 wells, and the rule below applies to all of them.

Discovered
2001-01-26
as the register files it
Field class
Gas
the register's own label
Between wells
no field rule filed
From a lease line
no field rule filed

The Commission's schedule remark for this field reads: AOF-1 AND AOF-2 EFFECTIVE 09/01/2001.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition124 bbl$3,758
GasProduction466,604 Mcf$1,734,989
Total$1,738,747

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 28.2044, -97.6022. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

28.20435, -97.60222 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
5,650 ft
1 wells filed one
Completion to plug
5.8 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 5,650 ft.

Completions filed
Aug 2001
1 of 1 wells
Plug dates filed
May 2007
1 of 1 wells

Last completion to plug: a median of 5.8 years across the 1 well that filed both dates, with the middle half between 5.8 years and 5.8 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-0253312725,650 ftAug 2001May 2007Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (88)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

88 months

Nov 20080055.496.86$0
Oct 20080075.246.92$0
Sep 200800101.767.88$0
Aug 200800114.228.48$0
Jul 200800131.0811.39$0
Jun 200800131.3313.03$0
May 200800123.1711.57$0
Apr 200800110.3110.45$0
Mar 200800101.909.66$0
Feb 20080092.538.77$0
Jan 20080090.388.21$0
Dec 20070088.337.30$0
Nov 20070091.677.29$0
Oct 20070082.856.92$0
Sep 20070075.846.24$0
Aug 20070069.066.39$0
Jul 20070070.906.39$0
Jun 20070062.007.55$0
May 20070058.747.85$0
Apr 20070059.617.81$0
Mar 20070056.927.30$0
Feb 20070055.108.22$0
Jan 20070050.306.73$0
Dec 20060056.656.92$0
Nov 20060054.207.62$0
Oct 20060054.906.01$0
Sep 20060060.085.04$0
Aug 20060068.717.34$0
Jul 20060069.376.34$0
Jun 20060066.286.38$0
May 20060066.016.42$0
Apr 20060064.397.36$0
Mar 20060056.707.08$0
Feb 20060057.597.75$0
Jan 20060060.598.93$0
Dec 20050054.9413.42$0
Nov 20050054.6910.59$0
Oct 20050058.3413.80$0
Sep 20050061.4512.08$0
Aug 20050061.519.80$0
Jul 20050055.697.84$0
Jun 20050052.337.38$0
May 20050045.226.65$0
Apr 20050049.207.36$0
Mar 20050050.377.15$0
Feb 20050045.226.31$0
Jan 20050043.166.32$0
Dec 200402,32439.866.75$15,690
Nov 200402,98445.286.33$18,890
Oct 200404,00449.706.52$26,086
Sep 200403,29643.245.28$17,416
Aug 200403,76242.375.55$20,882
Jul 200403,50838.286.08$21,343
Jun 200403,71036.106.43$23,867
May 200404,34937.486.49$28,245
Apr 200402,96834.475.86$17,388
Mar 200405,50034.365.53$30,416
Feb 200402,95032.455.51$16,253
Jan 200401,40232.036.30$8,832
Dec 200301,99330.266.30$12,559
Nov 200303,35428.804.60$15,412
Oct 200302,82628.174.76$13,451
Sep 2003022326.314.75$1,059
Aug 20030029.765.13$0
Jul 2003013229.415.17$683
Jun 20030028.565.98$0
May 20030026.595.97$0
Apr 200301426.675.41$76
Mar 20030031.146.10$0
Feb 20030033.487.93$0
Jan 200312422,26230.315.58$128,026
Dec 2002034,56826.914.85$167,785
Nov 2002032,31024.664.14$133,665
Oct 2002032,26726.464.23$136,461
Sep 2002029,62827.443.64$107,704
Aug 2002030,63225.963.16$96,925
Jul 2002029,37624.583.06$89,942
Jun 2002025,01023.733.34$83,489
May 2002022,27524.663.58$79,834
Apr 2002022,76123.653.51$79,944
Mar 2002024,94922.003.10$77,410
Feb 2002023,42018.222.38$55,638
Jan 2002025,37717.172.38$60,288
Dec 2001022,09516.932.36$52,241
Nov 2001017,04218.072.41$40,995
Oct 2001012,33619.782.53$31,196
Sep 200106,13324.262.25$13,807
Aug 200104,86424.873.05$14,851

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Dec 2004 — as filed, then multipliedworked
Condensate             0 bbl  × $ 39.86 =         $0
Gas                2,324 Mcf  × $  6.75 =    $15,690

────────────────────────────────────────────────────
Month total                                  $15,690

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 02/G/185395 is the state's own key, not one this site invented.