WOOD F

Operated by CHARRO OPERATING, L.L.C. (P-5 146621) in the SARCO CREEK (4100) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 190206District 02Field 81077332CondensateGasSaveExport
Value, all time
$2.7 M
May 2001 – Dec 2016
Value, last 12 filed months
$0
at the published price for each month
Months reported
188
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 21 leases and 21 wells, and the rule below applies to all of them.

Discovered
1945-10-21
as the register files it
Field class
Gas
the register's own label
Between wells
no field rule filed
From a lease line
no field rule filed

The Commission's schedule remark for this field reads: ALLOCATION FORUMLA SUSPENDED PER OPERATOR REQUEST 01/01/93

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition616 bbl$21,316
GasProduction537,099 Mcf$2,718,494
Total$2,739,810

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 28.5092, -97.3780. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

28.50915, -97.37803 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
5,300 ft
1 wells filed one
Completion to plug
15.5 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 5,300 ft.

Completions filed
Jun 2001
1 of 1 wells
Plug dates filed
Dec 2016
1 of 1 wells

Last completion to plug: a median of 15.5 years across the 1 well that filed both dates, with the middle half between 15.5 years and 15.5 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-17533335695,300 ftJun 2001Dec 2016Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (188)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

188 months

Dec 20160048.763.72$0
Nov 20160042.492.64$0
Oct 20160046.193.09$0
Sep 20160041.553.10$0
Aug 20160041.442.92$0
Jul 20160041.622.92$0
Jun 20160045.352.69$0
May 20160042.521.99$0
Apr 20160036.561.99$0
Mar 20160033.011.79$0
Feb 20160026.472.06$0
Jan 20160027.352.36$0
Dec 20150032.362.00$0
Nov 20150038.792.17$0
Oct 20150043.552.43$0
Sep 20150042.992.76$0
Aug 20150040.162.87$0
Jul 20150048.152.95$0
Jun 20150056.152.88$0
May 20150055.212.96$0
Apr 20150049.822.71$0
Mar 20150042.892.93$0
Feb 20150044.662.98$0
Jan 20150043.433.10$0
Dec 20140054.693.59$0
Nov 20140070.464.25$0
Oct 20140078.303.90$0
Sep 20140086.164.05$0
Aug 20140089.394.04$0
Jul 20140096.564.18$0
Jun 20140098.164.74$0
May 20140094.734.73$0
Apr 20140095.944.81$0
Mar 20140095.895.06$0
Feb 20140097.406.19$0
Jan 20140090.404.86$0
Dec 20130091.824.35$0
Nov 20130088.853.74$0
Oct 20130097.423.78$0
Sep 201300104.113.72$0
Aug 201300104.253.52$0
Jul 201300102.523.72$0
Jun 20130094.403.93$0
May 20130094.834.15$0
Apr 20130093.964.28$0
Mar 20130093.623.91$0
Feb 20130091.233.42$0
Jan 20130091.603.42$0
Dec 20120086.773.42$0
Nov 20120086.953.62$0
Oct 20120089.383.40$0
Sep 20120094.672.92$0
Aug 20120092.662.91$0
Jul 20120085.133.02$0
Jun 20120079.822.52$0
May 20120091.612.49$0
Apr 20120449101.652.00$897
Mar 20120531105.052.22$1,180
Feb 20120477101.102.57$1,226
Jan 2012043298.092.73$1,181
Dec 2011042996.873.24$1,390
Nov 2011042695.723.31$1,411
Oct 2011040784.983.65$1,485
Sep 2011033583.623.99$1,335
Aug 2011040983.404.15$1,697
Jul 2011040494.144.52$1,825
Jun 2011035192.904.64$1,629
May 2011036898.134.40$1,621
Apr 20110376105.964.33$1,629
Mar 2011038496.364.06$1,558
Feb 2011045585.644.18$1,902
Jan 2011047386.504.59$2,170
Dec 2010026185.734.35$1,135
Nov 2010019680.843.80$744
Oct 2010044478.103.51$1,558
Sep 2010043572.633.98$1,731
Aug 2010046673.684.42$2,059
Jul 2010048572.554.74$2,297
Jun 2010034070.364.91$1,670
May 2010027271.124.24$1,152
Apr 2010033381.694.12$1,373
Mar 2010039478.394.39$1,729
Feb 2010037273.585.44$2,025
Jan 2010031974.365.96$1,903
Dec 2009029171.445.48$1,596
Nov 2009028374.593.75$1,062
Oct 2009029472.544.11$1,208
Sep 2009030165.543.06$922
Aug 2009026367.423.22$846
Jul 2009025761.133.46$890
Jun 2009027166.163.90$1,056
May 2009015654.743.93$612
Apr 2009020446.773.59$732
Mar 2009028942.144.06$1,173
Feb 2009035832.814.63$1,659
Jan 2009045635.865.37$2,449
Dec 2008059937.105.98$3,580
Nov 2008069055.496.86$4,734
Oct 2008078875.246.92$5,455
Sep 20080698101.767.88$5,498
Aug 200802,128114.228.48$18,052
Jul 200802,730131.0811.39$31,093
Jun 200803,237131.3313.03$42,187
May 200803,526123.1711.57$40,811
Apr 200803,762110.3110.45$39,331
Mar 200805,406101.909.66$52,244
Feb 200802,81592.538.77$24,689
Jan 200802,23890.388.21$18,364
Dec 200702,76488.337.30$20,183
Nov 200702,09191.677.29$15,247
Oct 2007096182.856.92$6,652
Sep 200701,96075.846.24$12,239
Aug 200701,99569.066.39$12,744
Jul 200702,24470.906.39$14,335
Jun 200701,73562.007.55$13,097
May 200702,21958.747.85$17,411
Apr 200701,89459.617.81$14,783
Mar 200701,68556.927.30$12,304
Feb 200701,84655.108.22$15,167
Jan 20070050.306.73$0
Dec 20060056.656.92$0
Nov 20060054.207.62$0
Oct 20060054.906.01$0
Sep 20060060.085.04$0
Aug 20060068.717.34$0
Jul 20060069.376.34$0
Jun 20060066.286.38$0
May 20060066.016.42$0
Apr 20060064.397.36$0
Mar 20060056.707.08$0
Feb 20060057.597.75$0
Jan 20060060.598.93$0
Dec 20050054.9413.42$0
Nov 20050054.6910.59$0
Oct 2005115058.3413.80$6,709
Sep 20050061.4512.08$0
Aug 20050061.519.80$0
Jul 20050055.697.84$0
Jun 20050052.337.38$0
May 20050045.226.65$0
Apr 20050049.207.36$0
Mar 200503250.377.15$229
Feb 2005015645.226.31$985
Jan 2005061643.166.32$3,894
Dec 200404,58539.866.75$30,954
Nov 200407,32645.286.33$46,377
Oct 2004010,96249.706.52$71,419
Sep 2004012,14043.245.28$64,147
Aug 2004015,24542.375.55$84,620
Jul 2004016,05738.286.08$97,694
Jun 2004016,16236.106.43$103,970
May 200416518,85537.486.49$128,640
Apr 2004016,88834.475.86$98,938
Mar 2004017,85034.365.53$98,713
Feb 2004016,61332.455.51$91,531
Jan 2004020,43932.036.30$128,758
Dec 2003019,83230.266.30$124,974
Nov 2003017,73128.804.60$81,477
Oct 200316718,60128.174.76$93,238
Sep 200307,27326.314.75$34,542
Aug 200307,99329.765.13$41,002
Jul 200308,01129.415.17$41,424
Jun 200305,47228.565.98$32,739
May 200301,99026.595.97$11,886
Apr 200302,13526.675.41$11,545
Mar 200302,52931.146.10$15,417
Feb 200305,74633.487.93$45,542
Jan 200307,99630.315.58$44,634
Dec 200208,09426.914.85$39,286
Nov 200207,78724.664.14$32,215
Oct 200208,27926.464.23$35,013
Sep 200208,45927.443.64$30,750
Aug 200208,75725.963.16$27,709
Jul 200209,00824.583.06$27,580
Jun 200209,33223.733.34$31,152
May 2002010,17624.663.58$36,471
Apr 2002010,61923.653.51$37,297
Mar 200216910,97022.003.10$37,755
Feb 2002010,85018.222.38$25,776
Jan 2002011,57517.172.38$27,499
Dec 2001012,44716.932.36$29,430
Nov 2001012,12618.072.41$29,169
Oct 2001012,18219.782.53$30,807
Sep 2001011,64824.262.25$26,223
Aug 2001012,74024.873.05$38,897
Jul 2001011,69323.933.20$37,383
Jun 200106,66524.563.82$25,488
May 20010025.524.31$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Apr 2012 — as filed, then multipliedworked
Condensate             0 bbl  × $101.65 =         $0
Gas                  449 Mcf  × $  2.00 =       $897

────────────────────────────────────────────────────
Month total                                     $897

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 02/G/190206 is the state's own key, not one this site invented.