BLOCK 71

Operated by RIDDLE ENGINEERING CORP. (P-5 710900) in the CLAYTON (WILCOX 7360) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 191825District 02Field 18765940GasSave
Value, all time
$87 k
Jun 2002 – Feb 2006
Value, last 12 filed months
$0
at the published price for each month
Months reported
45
no gaps in the span
Streams
1
gas

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
GasProduction15,936 Mcf$87,086
Total$87,086

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 28.3265, -98.2889. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

28.32651, -98.28886 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
7,905 ft
1 wells filed one
Completion to plug
3.7 years
median over 1 wells

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 7,905 ft.

Completions filed
Jun 2002
1 of 1 wells
Plug dates filed
Feb 2006
1 of 1 wells

Last completion to plug: a median of 3.7 years across the 1 well that filed both dates, with the middle half between 3.7 years and 3.7 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-2970064117,905 ftJun 2002Feb 2006Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (45)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

45 months

Feb 2006057.597.75$0
Jan 2006060.598.93$0
Dec 2005054.9413.42$0
Nov 2005054.6910.59$0
Oct 2005058.3413.80$0
Sep 2005061.4512.08$0
Aug 2005061.519.80$0
Jul 2005055.697.84$0
Jun 2005052.337.38$0
May 2005045.226.65$0
Apr 2005049.207.36$0
Mar 2005050.377.15$0
Feb 2005045.226.31$0
Jan 2005043.166.32$0
Dec 2004039.866.75$0
Nov 2004045.286.33$0
Oct 200411149.706.52$723
Sep 200445943.245.28$2,425
Aug 200439342.375.55$2,181
Jul 200441038.286.08$2,495
Jun 200439836.106.43$2,560
May 200457437.486.49$3,728
Apr 200473034.475.86$4,277
Mar 200482634.365.53$4,568
Feb 200466532.455.51$3,664
Jan 200457732.036.30$3,635
Dec 200363230.266.30$3,983
Nov 200373928.804.60$3,396
Oct 200395028.174.76$4,522
Sep 20031,58826.314.75$7,542
Aug 20031,30429.765.13$6,689
Jul 20033,30829.415.17$17,105
Jun 20032,27228.565.98$13,593
May 2003026.595.97$0
Apr 2003026.675.41$0
Mar 2003031.146.10$0
Feb 2003033.487.93$0
Jan 2003030.315.58$0
Dec 2002026.914.85$0
Nov 2002024.664.14$0
Oct 2002026.464.23$0
Sep 2002027.443.64$0
Aug 2002025.963.16$0
Jul 2002024.583.06$0
Jun 2002023.733.34$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Oct 2004 — as filed, then multipliedworked
Gas                  111 Mcf  × $  6.52 =       $723

────────────────────────────────────────────────────
Month total                                     $723

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 02/G/191825 is the state's own key, not one this site invented.