CULLEN UNIT 1

Operated by WOFFORD, C. J. (P-5 935452) in the SPEAKS, SW. (12,670) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 192308District 02Field 84984992CondensateGasSaveExport
Value, all time
$42.3 M
Sep 2002 – Jun 2016
Value, last 12 filed months
$6 k
at the published price for each month
Months reported
166
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 3 leases and 3 wells, and the rule below applies to all of them.

Discovered
1984-10-30
as the register files it
Field class
Gas
the register's own label
Between wells
no field rule filed
From a lease line
no field rule filed

The Commission's schedule remark for this field reads: DKT # 03-233044

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition52,099 bbl$2,229,328
GasProduction6,282,322 Mcf$40,022,789
Total$42,252,117

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 29.2309, -96.7634. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

29.23085, -96.76336 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
13,358 ft
1 wells filed one
Completion to plug
13.8 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 13,358 ft.

Completions filed
Sep 2002
1 of 1 wells
Plug dates filed
Jun 2016
1 of 1 wells

Last completion to plug: a median of 13.8 years across the 1 well that filed both dates, with the middle half between 13.8 years and 13.8 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-28532976313,358 ftSep 2002Jun 2016Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (166)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

166 months

Jun 20160045.352.69$0
May 2016030342.521.99$603
Apr 2016028736.561.99$571
Mar 2016027733.011.79$497
Feb 2016027526.472.06$568
Jan 2016018327.352.36$433
Dec 2015018332.362.00$366
Nov 2015024338.792.17$527
Oct 2015028643.552.43$694
Sep 2015016642.992.76$458
Aug 2015018840.162.87$540
Jul 2015023548.152.95$692
Jun 2015028256.152.88$813
May 2015028255.212.96$833
Apr 2015027349.822.71$739
Mar 2015028142.892.93$825
Feb 2015031944.662.98$949
Jan 2015031843.433.10$986
Dec 2014034154.693.59$1,225
Nov 2014030270.464.25$1,284
Oct 2014031878.303.90$1,241
Sep 2014033686.164.05$1,359
Aug 2014029089.394.04$1,170
Jul 2014028096.564.18$1,170
Jun 2014030698.164.74$1,449
May 2014030194.734.73$1,423
Apr 2014024695.944.81$1,183
Mar 2014029495.895.06$1,487
Feb 2014026397.406.19$1,629
Jan 2014030790.404.86$1,492
Dec 2013028191.824.35$1,224
Nov 2013027388.853.74$1,021
Oct 2013029197.423.78$1,100
Sep 20130242104.113.72$900
Aug 20130282104.253.52$993
Jul 20130326102.523.72$1,212
Jun 2013030994.403.93$1,215
May 2013032094.834.15$1,328
Apr 2013019893.964.28$848
Mar 2013024793.623.91$966
Feb 2013025891.233.42$882
Jan 2013032591.603.42$1,111
Dec 2012032086.773.42$1,094
Nov 2012028286.953.62$1,022
Oct 2012029989.383.40$1,017
Sep 2012026194.672.92$762
Aug 2012032592.662.91$945
Jul 2012031785.133.02$958
Jun 2012031479.822.52$791
May 2012035691.612.49$886
Apr 20120281101.652.00$561
Mar 20120312105.052.22$693
Feb 20120346101.102.57$889
Jan 2012026998.092.73$735
Dec 2011037296.873.24$1,205
Nov 2011025095.723.31$828
Oct 2011021284.983.65$773
Sep 2011025583.623.99$1,016
Aug 2011024183.404.15$1,000
Jul 2011027294.144.52$1,229
Jun 2011027292.904.64$1,262
May 2011024798.134.40$1,088
Apr 20110246105.964.33$1,066
Mar 2011029596.364.06$1,197
Feb 2011027885.644.18$1,162
Jan 2011026986.504.59$1,234
Dec 2010028985.734.35$1,257
Nov 2010031780.843.80$1,203
Oct 2010031578.103.51$1,105
Sep 2010033772.633.98$1,341
Aug 2010038973.684.42$1,719
Jul 2010044072.554.74$2,084
Jun 201010941870.364.91$9,722
May 2010017371.124.24$733
Apr 20100081.694.12$0
Mar 2010022378.394.39$979
Feb 201004173.585.44$223
Jan 2010016074.365.96$954
Dec 2009021671.445.48$1,184
Nov 2009062774.593.75$2,352
Oct 2009013672.544.11$559
Sep 2009036765.543.06$1,125
Aug 2009088767.423.22$2,855
Jul 200918189561.133.46$14,165
Jun 200901,34066.163.90$5,219
May 200909,89654.743.93$38,849
Apr 200918916,89546.773.59$69,450
Mar 2009017,38042.144.06$70,545
Feb 200918017,31832.814.63$86,140
Jan 200918019,01035.865.37$108,558
Dec 200818021,13437.105.98$132,999
Nov 2008021,77155.496.86$149,357
Oct 200817522,22875.246.92$167,029
Sep 200817922,337101.767.88$194,166
Aug 200817923,557114.228.48$220,280
Jul 200817825,175131.0811.39$310,061
Jun 200817824,330131.3313.03$340,461
May 200817919,592123.1711.57$248,811
Apr 200835623,674110.3110.45$286,779
Mar 2008013,309101.909.66$128,619
Feb 200818116,16892.538.77$158,551
Jan 200818216,70990.388.21$153,559
Dec 200730917,43488.337.30$154,597
Nov 200718118,95991.677.29$154,836
Oct 2007022,50382.856.92$155,765
Sep 200735622,50375.846.24$167,511
Aug 200717623,47769.066.39$162,124
Jul 200717927,51770.906.39$188,468
Jun 200717627,96662.007.55$222,012
May 200736532,85858.747.85$279,253
Apr 200735834,41959.617.81$289,988
Mar 200734437,83156.927.30$295,821
Feb 200735837,07255.108.22$324,309
Jan 200754743,03550.306.73$317,004
Dec 200636243,73556.656.92$323,085
Nov 200636244,67654.207.62$359,939
Oct 200635639,59454.906.01$257,655
Sep 200635638,41860.085.04$214,908
Aug 200635638,72268.717.34$308,677
Jul 200635644,72569.376.34$308,376
Jun 200635950,09966.286.38$343,621
May 200653648,86066.016.42$349,307
Apr 200635853,57964.397.36$417,419
Mar 200672455,68956.707.08$435,492
Feb 200636453,31857.597.75$434,237
Jan 200654356,50960.598.93$537,713
Dec 200554646,01554.9413.42$647,307
Nov 200553864,03654.6910.59$707,462
Oct 200553569,53858.3413.80$990,541
Sep 200570865,40161.4512.08$833,485
Aug 200553270,40261.519.80$722,440
Jul 200554266,02855.697.84$548,084
Jun 200571163,96852.337.38$509,357
May 200553367,59945.226.65$473,714
Apr 200572175,78349.207.36$593,272
Mar 200571873,68350.377.15$563,359
Feb 200572174,25345.226.31$501,283
Jan 200590188,52743.166.32$598,573
Dec 200472592,18639.866.75$651,254
Nov 200489992,61145.286.33$626,973
Oct 200489899,84749.706.52$695,144
Sep 200488999,05243.245.28$561,821
Aug 2004887107,80342.375.55$635,960
Jul 20041,069117,92938.286.08$758,423
Jun 2004892114,77536.106.43$770,551
May 20041,071121,38737.486.49$828,499
Apr 20041,074123,30434.475.86$759,392
Mar 20041,075135,37834.365.53$785,596
Feb 20041,263141,52932.455.51$820,755
Jan 20041,264154,14432.036.30$1,011,538
Dec 20031,437156,60730.266.30$1,030,365
Nov 20031,076154,91728.804.60$742,857
Oct 20031,442161,14528.174.76$807,613
Sep 20031,257159,68426.314.75$791,468
Aug 20031,233171,95529.765.13$918,775
Jul 20031,432168,01629.415.17$910,899
Jun 20031,439183,75928.565.98$1,140,521
May 20031,257188,26326.595.97$1,157,858
Apr 20031,623187,20026.675.41$1,055,528
Mar 20031,448210,37331.146.10$1,327,533
Feb 20031,642198,85833.487.93$1,631,099
Jan 20031,683221,04230.315.58$1,284,877
Dec 20022,010241,81026.914.85$1,227,777
Nov 20021,715234,24124.664.14$1,011,338
Oct 2002506140,40926.464.23$607,195
Sep 200209,10627.443.64$33,102

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2016 — as filed, then multipliedworked
Condensate             0 bbl  × $ 42.52 =         $0
Gas                  303 Mcf  × $  1.99 =       $603

────────────────────────────────────────────────────
Month total                                     $603

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 02/G/192308 is the state's own key, not one this site invented.