CREWS

Operated by CHRISTOPHER OIL & GAS INC (P-5 153205) in the LA ROSA (6750, BELOW, GAS) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 195121District 02Field 50975816CondensateGasSaveExport
Value, all time
$2.5 M
Apr 2003 – Aug 2009
Value, last 12 filed months
$87 k
at the published price for each month
Months reported
77
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 5 leases and 5 wells, and the rule below applies to all of them.

Discovered
1994-11-21
as the register files it
Field class
Gas
the register's own label
Between wells
467 ft
minimum
From a lease line
233 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 1994-11-21.

The Commission's schedule remark for this field reads: AOF-1 AND AOF-2 EFFECTIVE 05/01/1999.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition16,078 bbl$773,263
GasProduction268,040 Mcf$1,716,064
Total$2,489,327

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 28.2111, -97.3022. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

28.21105, -97.30218 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
8,050 ft
1 wells filed one
Completion to plug
4 months
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 8,050 ft.

Completions filed
Aug 2009
1 of 1 wells
Plug dates filed
Dec 2009
1 of 1 wells

Last completion to plug: a median of 4 months across the 1 well that filed both dates, with the middle half between 4 months and 4 months. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-3913250538,050 ftAug 2009Dec 2009Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (77)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

77 months

Aug 20090067.423.22$0
Jul 20090061.133.46$0
Jun 20090066.163.90$0
May 20090054.743.93$0
Apr 20090046.773.59$0
Mar 20090042.144.06$0
Feb 20090032.814.63$0
Jan 20091761,32235.865.37$13,412
Dec 20081701,76237.105.98$16,839
Nov 200801,20055.496.86$8,232
Oct 20081821,67675.246.92$25,295
Sep 2008178639101.767.88$23,147
Aug 200801,364114.228.48$11,571
Jul 20081771,589131.0811.39$41,299
Jun 200801,484131.3313.03$19,340
May 20081731,698123.1711.57$40,962
Apr 200801,735110.3110.45$18,139
Mar 20081721,676101.909.66$33,724
Feb 20081751,29592.538.77$27,551
Jan 200801,35390.388.21$11,102
Dec 20071711,62988.337.30$26,999
Nov 20071821,36491.677.29$26,630
Oct 200701,69082.856.92$11,698
Sep 20071731,06975.846.24$19,795
Aug 200701,95969.066.39$12,514
Jul 20071702,02170.906.39$24,963
Jun 20071641,72762.007.55$23,204
May 200701,59458.747.85$12,507
Apr 200716420459.617.81$11,368
Mar 20071611,44356.927.30$19,701
Feb 20071631,27355.108.22$19,440
Jan 200701,33450.306.73$8,974
Dec 20061881,48956.656.92$20,952
Nov 20061771,62654.207.62$21,979
Oct 20061861,81754.906.01$21,138
Sep 20061882,07560.085.04$21,747
Aug 20061842,32868.717.34$29,730
Jul 20061832,35969.376.34$27,657
Jun 20061812,28866.286.38$26,603
May 20061792,67866.016.42$29,022
Apr 20061832,09364.397.36$27,189
Mar 20061792,19556.707.08$25,696
Feb 20061851,44357.597.75$21,839
Jan 20061811,75760.598.93$26,663
Dec 20051861,50154.9413.42$30,355
Nov 20051852,96154.6910.59$41,470
Oct 20053691,65058.3413.80$44,290
Sep 20051852,61761.4512.08$42,979
Aug 20051711,83561.519.80$28,495
Jul 200516142155.697.84$12,268
Jun 200518084452.337.38$15,649
May 20051721,91045.226.65$20,482
Apr 20053624,85549.207.36$53,546
Mar 20053613,41250.377.15$42,596
Feb 2005010445.226.31$656
Jan 20050043.166.32$0
Dec 20040039.866.75$0
Nov 20043649,18145.286.33$74,602
Oct 200405,73549.706.52$37,364
Sep 20043604,27843.245.28$38,171
Aug 20045325,81542.375.55$54,818
Jul 20043585,28238.286.08$45,841
Jun 20045416,45736.106.43$61,068
May 20045288,59037.486.49$75,578
Apr 20047259,38034.475.86$79,943
Mar 200454710,78534.365.53$78,437
Feb 200454910,99832.455.51$78,410
Jan 200472512,61532.036.30$102,692
Dec 200371512,66230.266.30$101,427
Nov 200336211,80728.804.60$64,681
Oct 200354211,69428.174.76$70,927
Sep 200353810,95726.314.75$66,194
Aug 200334111,53229.765.13$69,304
Jul 200353511,54629.415.17$75,437
Jun 200353913,90528.565.98$98,587
May 2003012,46326.595.97$74,438
Apr 20030026.675.41$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Jan 2009 — as filed, then multipliedworked
Condensate           176 bbl  × $ 35.86 =     $6,311
Gas                1,322 Mcf  × $  5.37 =     $7,100

────────────────────────────────────────────────────
Month total                                  $13,412

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 02/G/195121 is the state's own key, not one this site invented.