JANOSEK

Operated by BAY ROCK OPERATING COMPANY (P-5 57860) in the HIGHLANDER (CARRIZO) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 198544District 02Field 413160752 tax incentive programmesCondensateGasSaveExport
Value, all time
$2.7 M
Sep 2003 – Jan 2010
Value, last 12 filed months
$51 k
at the published price for each month
Months reported
77
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 8 leases and 8 wells, and the rule below applies to all of them.

Discovered
2001-09-03
as the register files it
Field class
Gas
the register's own label
Between wells
no field rule filed
From a lease line
no field rule filed

The Commission's schedule remark for this field reads: AOF-1 AND AOF-2 EFFECTIVE 07/01/2002.

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112004-02-26153421
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition3,723 bbl$171,594
GasProduction380,957 Mcf$2,539,916
Total$2,711,510

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 28.7750, -97.6767. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

28.77504, -97.67672 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
7,160 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 7,160 ft.

Completions filed
Jan 2010
1 of 1 wells

1 well

42-2553147017,160 ftJan 2010Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (77)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

77 months

Jan 2010135074.365.96$10,039
Dec 2009060171.445.48$3,296
Nov 2009070574.593.75$2,645
Oct 2009096572.544.11$3,966
Sep 2009088765.543.06$2,718
Aug 200901,00767.423.22$3,241
Jul 2009080661.133.46$2,792
Jun 2009085766.163.90$3,338
May 200901,01354.743.93$3,977
Apr 200901,28846.773.59$4,621
Mar 200901,16642.144.06$4,733
Feb 200901,19932.814.63$5,555
Jan 2009094835.865.37$5,092
Dec 20081791,44237.105.98$15,260
Nov 2008067655.496.86$4,638
Oct 2008098275.246.92$6,797
Sep 200802,134101.767.88$16,810
Aug 200802,791114.228.48$23,676
Jul 20080362131.0811.39$4,123
Jun 20080534131.3313.03$6,959
May 20080912123.1711.57$10,556
Apr 200801,863110.3110.45$19,477
Mar 200802,093101.909.66$20,227
Feb 200802,16192.538.77$18,953
Jan 20081922,24690.388.21$35,783
Dec 200702,65988.337.30$19,416
Nov 200702,60891.677.29$19,017
Oct 200702,94982.856.92$20,413
Sep 200702,63575.846.24$16,453
Aug 200702,81869.066.39$18,001
Jul 200703,46370.906.39$22,121
Jun 200703,93662.007.55$29,711
May 20071893,67758.747.85$39,953
Apr 200703,63659.617.81$28,380
Mar 200703,92756.927.30$28,675
Feb 200703,45955.108.22$28,419
Jan 200704,48750.306.73$30,183
Dec 200604,06656.656.92$28,130
Nov 200603,85054.207.62$29,327
Oct 200604,90354.906.01$29,486
Sep 200604,86660.085.04$24,511
Aug 20061815,48068.717.34$52,659
Jul 200605,94969.376.34$37,733
Jun 200605,32466.286.38$33,988
May 200606,33366.016.42$40,690
Apr 200605,97864.397.36$44,001
Mar 200604,48856.707.08$31,788
Feb 20061804,99657.597.75$49,091
Jan 200606,44960.598.93$57,611
Dec 200503,84554.9413.42$51,582
Nov 200501,64454.6910.59$17,407
Oct 200505,03758.3413.80$69,489
Sep 200503,95261.4512.08$47,736
Aug 2005602,66961.519.80$29,838
Jul 200501,98455.697.84$15,562
Jun 20051765,81052.337.38$52,094
May 200508,10045.226.65$53,874
Apr 200508,04549.207.36$59,215
Mar 20051887,49250.377.15$63,074
Feb 200507,70745.226.31$48,646
Jan 200509,13643.166.32$57,760
Dec 20041879,68239.866.75$72,818
Nov 200409,74545.286.33$61,690
Oct 200417211,18349.706.52$81,407
Sep 200418610,45643.245.28$63,291
Aug 2004011,10242.375.55$61,623
Jul 200418410,87738.286.08$73,221
Jun 200419010,98736.106.43$77,539
May 200418912,65737.486.49$89,286
Apr 200418513,29934.475.86$84,289
Mar 200418912,03634.365.53$73,055
Feb 200419212,25032.455.51$73,723
Jan 200418613,66132.036.30$92,017
Dec 200319512,23830.266.30$83,020
Nov 2003012,53828.804.60$57,614
Oct 200318813,24328.174.76$68,328
Sep 200307,00826.314.75$33,284

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Jan 2010 — as filed, then multipliedworked
Condensate           135 bbl  × $ 74.36 =    $10,039
Gas                    0 Mcf  × $  5.96 =         $0

────────────────────────────────────────────────────
Month total                                  $10,039

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 02/G/198544 is the state's own key, not one this site invented.