MONT GAS UNIT NO. 1

Operated by TRIO CONSULTING & MANAGEMENT,LLC (P-5 870354) in the MONT (WILCOX 10,900) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 203645District 02Field 62518800CondensateGasSaveExport
Value, all time
$2.1 M
Jun 2004 – Mar 2017
Value, last 12 filed months
$8 k
at the published price for each month
Months reported
154
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 16 leases and 16 wells, and the rule below applies to all of them.

Discovered
1979-12-15
as the register files it
Field class
Gas
the register's own label
Between wells
1,200 ft
minimum
From a lease line
467 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2010-04-01.

The Commission's schedule remark for this field reads: AOF-1 AND AOF-2 EFFECTIVE 05/01/2010.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition15,287 bbl$879,304
GasProduction177,383 Mcf$1,191,327
Total$2,070,631

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 29.3660, -96.9665. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

29.36597, -96.96654 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
15,200 ft
1 wells filed one
Completion to plug
9.6 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 15,200 ft.

Completions filed
Jun 2004
1 of 1 wells
Plug dates filed
Jan 2014
1 of 1 wells

Last completion to plug: a median of 9.6 years across the 1 well that filed both dates, with the middle half between 9.6 years and 9.6 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-28530724115,200 ftJun 2004Jan 2014Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (154)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

154 months

Mar 20170046.772.98$0
Feb 20170050.452.95$0
Jan 2017157049.413.42$7,757
Dec 20160048.763.72$0
Nov 20160042.492.64$0
Oct 20160046.193.09$0
Sep 20160041.553.10$0
Aug 20160041.442.92$0
Jul 20160041.622.92$0
Jun 20160045.352.69$0
May 20160042.521.99$0
Apr 20160036.561.99$0
Mar 20160033.011.79$0
Feb 20160026.472.06$0
Jan 20160027.352.36$0
Dec 20150032.362.00$0
Nov 20150038.792.17$0
Oct 20150043.552.43$0
Sep 20150042.992.76$0
Aug 20150040.162.87$0
Jul 20150048.152.95$0
Jun 20150056.152.88$0
May 20150055.212.96$0
Apr 20150049.822.71$0
Mar 20150042.892.93$0
Feb 20150044.662.98$0
Jan 20150043.433.10$0
Dec 20140054.693.59$0
Nov 20140070.464.25$0
Oct 20140078.303.90$0
Sep 20140086.164.05$0
Aug 20140089.394.04$0
Jul 20140096.564.18$0
Jun 20140098.164.74$0
May 20140094.734.73$0
Apr 20140095.944.81$0
Mar 20140095.895.06$0
Feb 20140097.406.19$0
Jan 20140090.404.86$0
Dec 20130091.824.35$0
Nov 20130088.853.74$0
Oct 20130097.423.78$0
Sep 201300104.113.72$0
Aug 201300104.253.52$0
Jul 201300102.523.72$0
Jun 20130094.403.93$0
May 20130094.834.15$0
Apr 20130093.964.28$0
Mar 20130093.623.91$0
Feb 20130091.233.42$0
Jan 20130091.603.42$0
Dec 20120086.773.42$0
Nov 20120086.953.62$0
Oct 20120089.383.40$0
Sep 20120094.672.92$0
Aug 20120092.662.91$0
Jul 20120085.133.02$0
Jun 2012781179.822.52$6,254
May 20120091.612.49$0
Apr 20120205101.652.00$409
Mar 20120195105.052.22$433
Feb 20120120101.102.57$308
Jan 201215018098.092.73$15,206
Dec 2011015096.873.24$486
Nov 2011012095.723.31$397
Oct 2011015084.983.65$547
Sep 2011018083.623.99$717
Aug 2011015083.404.15$622
Jul 2011028094.144.52$1,265
Jun 2011035092.904.64$1,624
May 2011030098.134.40$1,321
Apr 20110250105.964.33$1,083
Mar 2011050396.364.06$2,041
Feb 2011065085.644.18$2,717
Jan 201118145586.504.59$17,744
Dec 2010062285.734.35$2,704
Nov 2010041180.843.80$1,560
Oct 201018972278.103.51$17,294
Sep 2010099172.633.98$3,944
Aug 2010039873.684.42$1,759
Jul 2010046372.554.74$2,193
Jun 201019462670.364.91$16,724
May 201001,18771.124.24$5,027
Apr 201001,17881.694.12$4,857
Mar 201001,60678.394.39$7,048
Feb 20101971,55773.585.44$22,969
Jan 20101961,63274.365.96$24,308
Dec 200901,82571.445.48$10,008
Nov 20091881,60074.593.75$20,025
Oct 2009062872.544.11$2,581
Sep 20091911,48865.543.06$17,078
Aug 200901,97067.423.22$6,340
Jul 20091901,92261.133.46$18,273
Jun 200901,54266.163.90$6,006
May 20091871,67854.743.93$16,824
Apr 200901,83246.773.59$6,572
Mar 20091891,56442.144.06$14,313
Feb 200901,48532.814.63$6,880
Jan 200901,48535.865.37$7,976
Dec 200817479137.105.98$11,183
Nov 200801,59355.496.86$10,929
Oct 200801,17375.246.92$8,119
Sep 2008175790101.767.88$24,031
Aug 20081881,172114.228.48$31,415
Jul 2008190818131.0811.39$34,222
Jun 20081961,128131.3313.03$40,441
May 20080397123.1711.57$4,595
Apr 20080712110.3110.45$7,444
Mar 20081781,158101.909.66$29,329
Feb 200801,03292.538.77$9,051
Jan 2008097490.388.21$7,992
Dec 20071861,24988.337.30$25,550
Nov 200701,34191.677.29$9,778
Oct 20071911,24882.856.92$24,463
Sep 200701,13975.846.24$7,112
Aug 20071791,04369.066.39$19,024
Jul 2007098570.906.39$6,292
Jun 20071771,20662.007.55$20,077
May 20071841,64958.747.85$23,747
Apr 200701,34259.617.81$10,475
Mar 200718399456.927.30$17,675
Feb 20071881,50055.108.22$22,683
Jan 20071881,53350.306.73$19,769
Dec 20061991,74756.656.92$23,360
Nov 20061872,23654.207.62$27,168
Oct 200601,23754.906.01$7,439
Sep 20061841,45260.085.04$18,369
Aug 20061931,63368.717.34$25,247
Jul 200602,06369.376.34$13,085
Jun 20061931,84466.286.38$24,564
May 20061852,22166.016.42$26,482
Apr 20061801,92064.397.36$25,722
Mar 20061911,64456.707.08$22,474
Feb 2006791,95357.597.75$19,688
Jan 20062002,91360.598.93$38,141
Dec 20051882,03754.9413.42$37,656
Nov 20051952,50754.6910.59$37,210
Oct 20053722,99758.3413.80$63,048
Sep 20051842,86661.4512.08$45,925
Aug 20051773,21261.519.80$42,355
Jul 20051932,86155.697.84$33,189
Jun 20053914,36052.337.38$52,642
May 20055845,39145.226.65$62,265
Apr 20053874,78149.207.36$54,231
Mar 20053874,36350.377.15$50,710
Feb 20051811,34845.226.31$16,693
Jan 20055875,65643.166.32$61,093
Dec 20049728,60539.866.75$96,837
Nov 20045645,32845.286.33$59,266
Oct 20045856,70149.706.52$72,732
Sep 20049698,06443.245.28$84,509
Aug 20041,13510,23442.375.55$104,895
Jul 20045817,74238.286.08$69,344
Jun 200403,83936.106.43$24,696

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Jan 2017 — as filed, then multipliedworked
Condensate           157 bbl  × $ 49.41 =     $7,757
Gas                    0 Mcf  × $  3.42 =         $0

────────────────────────────────────────────────────
Month total                                   $7,757

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 02/G/203645 is the state's own key, not one this site invented.