WOOD "E"

Operated by CHARRO OPERATING, L.L.C. (P-5 146621) in the SARCO CREEK (4800) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 205797District 02Field 81077747GasSaveExport
Value, all time
$3.3 M
Dec 2004 – Apr 2013
Value, last 12 filed months
$0
at the published price for each month
Months reported
101
no gaps in the span
Streams
1
gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 22 leases and 34 wells, and the rule below applies to all of them.

Discovered
1961-06-17
as the register files it
Field class
Oil and gas
the register's own label
Between wells
no field rule filed
From a lease line
no field rule filed

The Commission's schedule remark for this field reads: AOF-1 AND AOF-2 EFFECTIVE 12/01/2002.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
GasProduction465,711 Mcf$3,286,777
Total$3,286,777

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 28.4892, -97.3881. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

28.48924, -97.38810 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
5,246 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 5,246 ft.

Completions filed
Apr 2013
1 of 1 wells

1 well

42-17533667955,246 ftApr 2013Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (101)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

101 months

Apr 2013093.964.28$0
Mar 2013093.623.91$0
Feb 2013091.233.42$0
Jan 2013091.603.42$0
Dec 2012086.773.42$0
Nov 2012086.953.62$0
Oct 2012089.383.40$0
Sep 2012094.672.92$0
Aug 2012092.662.91$0
Jul 2012085.133.02$0
Jun 2012079.822.52$0
May 2012091.612.49$0
Apr 20120101.652.00$0
Mar 20120105.052.22$0
Feb 20120101.102.57$0
Jan 2012098.092.73$0
Dec 20112,91496.873.24$9,441
Nov 20112,69195.723.31$8,911
Oct 20112,48084.983.65$9,048
Sep 20112,59483.623.99$10,339
Aug 20112,79583.404.15$11,597
Jul 20112,89494.144.52$13,073
Jun 20113,08892.904.64$14,328
May 20112,89698.134.40$12,756
Apr 20112,819105.964.33$12,216
Mar 20112,77496.364.06$11,255
Feb 20112,29985.644.18$9,610
Jan 20113,15286.504.59$14,464
Dec 20102,98785.734.35$12,987
Nov 20102,45180.843.80$9,302
Oct 20103,07178.103.51$10,776
Sep 20103,30672.633.98$13,156
Aug 20103,30173.684.42$14,588
Jul 20103,72472.554.74$17,639
Jun 20102,12170.364.91$10,415
May 20103,29971.124.24$13,972
Apr 20103,51481.694.12$14,487
Mar 20103,75378.394.39$16,471
Feb 20103,41773.585.44$18,597
Jan 20103,56674.365.96$21,268
Dec 20093,25471.445.48$17,844
Nov 20092,75174.593.75$10,320
Oct 20093,73872.544.11$15,364
Sep 20093,70065.543.06$11,340
Aug 20093,70667.423.22$11,928
Jul 20093,55861.133.46$12,327
Jun 20094,03166.163.90$15,701
May 20093,68854.743.93$14,478
Apr 20094,12346.773.59$14,791
Mar 20094,01942.144.06$16,313
Feb 20093,17332.814.63$14,701
Jan 20093,78035.865.37$20,302
Dec 20084,36737.105.98$26,102
Nov 20084,10855.496.86$28,182
Oct 20084,54975.246.92$31,488
Sep 20084,265101.767.88$33,596
Aug 20084,585114.228.48$38,895
Jul 20084,284131.0811.39$48,792
Jun 20083,927131.3313.03$51,179
May 20084,382123.1711.57$50,719
Apr 20084,354110.3110.45$45,520
Mar 20084,658101.909.66$45,015
Feb 20084,09092.538.77$35,872
Jan 20084,76890.388.21$39,125
Dec 20075,40488.337.30$39,460
Nov 20074,94591.677.29$36,057
Oct 20074,88782.856.92$33,828
Sep 20075,53875.846.24$34,580
Aug 20075,12069.066.39$32,706
Jul 20075,31270.906.39$33,933
Jun 20075,48962.007.55$41,433
May 20076,19858.747.85$48,631
Apr 20074,96459.617.81$38,745
Mar 20075,11656.927.30$37,357
Feb 20074,88155.108.22$40,102
Jan 20076,04850.306.73$40,684
Dec 20066,37656.656.92$44,112
Nov 20065,23754.207.62$39,893
Oct 20066,32554.906.01$38,037
Sep 20066,88760.085.04$34,691
Aug 20066,94968.717.34$51,005
Jul 20066,86069.376.34$43,511
Jun 20068,04966.286.38$51,384
May 20065,82066.016.42$37,394
Apr 20067,98564.397.36$58,773
Mar 20067,15256.707.08$50,657
Feb 20066,02657.597.75$46,708
Jan 20067,04960.598.93$62,971
Dec 20057,59854.9413.42$101,930
Nov 20059,11754.6910.59$96,534
Oct 200510,63158.3413.80$146,663
Sep 200510,11661.4512.08$122,191
Aug 200511,34761.519.80$111,165
Jul 200512,50455.697.84$98,077
Jun 200513,66752.337.38$100,877
May 200515,00045.226.65$99,767
Apr 200515,13449.207.36$111,394
Mar 200514,68150.377.15$105,041
Feb 200515,13045.226.31$95,499
Jan 20058,99343.166.32$56,856
Dec 20049,41239.866.75$63,541

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Dec 2011 — as filed, then multipliedworked
Gas                2,914 Mcf  × $  3.24 =     $9,441

────────────────────────────────────────────────────
Month total                                   $9,441

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 02/G/205797 is the state's own key, not one this site invented.