GRISSOM

Operated by ANDERSON OIL LTD. (P-5 22499) in the CAESAR (HOCKEY 2480) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 239811District 02Field 14579200GasSaveExport
Value, all time
$367 k
Aug 2008 – Nov 2011
Value, last 12 filed months
$0
at the published price for each month
Months reported
40
no gaps in the span
Streams
1
gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 2 leases and 2 wells, and the rule below applies to all of them.

Discovered
1980-09-26
as the register files it
Field class
Gas
the register's own label
Between wells
no field rule filed
From a lease line
no field rule filed

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
GasProduction69,639 Mcf$366,755
Total$366,755

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 28.6793, -97.8697. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

28.67930, -97.86970 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
3,993 ft
1 wells filed one
Completion to plug
20 months
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 3,993 ft.

Completions filed
Mar 2010
1 of 1 wells
Plug dates filed
Nov 2011
1 of 1 wells

Last completion to plug: a median of 20 months across the 1 well that filed both dates, with the middle half between 20 months and 20 months. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-025335781A3,993 ftMar 2010Nov 2011Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (40)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

40 months

Nov 2011095.723.31$0
Oct 2011084.983.65$0
Sep 2011083.623.99$0
Aug 2011083.404.15$0
Jul 2011094.144.52$0
Jun 2011092.904.64$0
May 2011098.134.40$0
Apr 20110105.964.33$0
Mar 2011096.364.06$0
Feb 2011085.644.18$0
Jan 2011086.504.59$0
Dec 2010085.734.35$0
Nov 2010080.843.80$0
Oct 2010078.103.51$0
Sep 2010072.633.98$0
Aug 2010073.684.42$0
Jul 2010072.554.74$0
Jun 20101,10070.364.91$5,401
May 20101,81671.124.24$7,691
Apr 20101,87381.694.12$7,722
Mar 20102,19678.394.39$9,638
Feb 20102,01373.585.44$10,955
Jan 20102,48874.365.96$14,839
Dec 20093,76671.445.48$20,652
Nov 20094,92974.593.75$18,491
Oct 20095,43572.544.11$22,339
Sep 20095,09465.543.06$15,612
Aug 20095,17967.423.22$16,669
Jul 20094,75961.133.46$16,488
Jun 200944166.163.90$1,718
May 200939454.743.93$1,547
Apr 200940846.773.59$1,464
Mar 200960942.144.06$2,472
Feb 200992032.814.63$4,262
Jan 20091,04435.865.37$5,607
Dec 20083,06637.105.98$18,326
Nov 20085,55655.496.86$38,116
Oct 20086,46275.246.92$44,730
Sep 20085,916101.767.88$46,601
Aug 20084,175114.228.48$35,417

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Jun 2010 — as filed, then multipliedworked
Gas                1,100 Mcf  × $  4.91 =     $5,401

────────────────────────────────────────────────────
Month total                                   $5,401

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 02/G/239811 is the state's own key, not one this site invented.