CROCKER

Operated by JAMEX, INC. (P-5 429659) in the CROCKER (WX. 10,800) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 252628District 02Field 21757475CondensateGasSaveExport
Value, all time
$6.5 M
Feb 2009 – Apr 2014
Value, last 12 filed months
$18 k
at the published price for each month
Months reported
63
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 5 leases and 5 wells, and the rule below applies to all of them.

Discovered
1997-06-24
as the register files it
Field class
Gas
the register's own label
Between wells
no field rule filed
From a lease line
no field rule filed

The Commission's schedule remark for this field reads: AOF-1 AND AOF-2 EFFECTIVE 09/01/1999.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition18,091 bbl$1,339,091
GasProduction1,253,330 Mcf$5,148,338
Total$6,487,429

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 28.1943, -98.1089. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

28.19429, -98.10895 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
11,300 ft
1 wells filed one
Completion to plug
5.2 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 11,300 ft.

Completions filed
Feb 2009
1 of 1 wells
Plug dates filed
Apr 2014
1 of 1 wells

Last completion to plug: a median of 5.2 years across the 1 well that filed both dates, with the middle half between 5.2 years and 5.2 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-297348021ST11,300 ftFeb 2009Apr 2014Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (63)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

63 months

Apr 20140095.944.81$0
Mar 2014108095.895.06$10,356
Feb 20140097.406.19$0
Jan 20140090.404.86$0
Dec 20130591.824.35$22
Nov 20130088.853.74$0
Oct 20130097.423.78$0
Sep 201300104.113.72$0
Aug 201300104.253.52$0
Jul 201304102.523.72$15
Jun 20130494.403.93$16
May 201301,83994.834.15$7,630
Apr 201304,91093.964.28$21,028
Mar 20131856,32493.623.91$42,065
Feb 201306,03791.233.42$20,646
Jan 201306,23291.603.42$21,313
Dec 20121797,28186.773.42$40,434
Nov 201206,81686.953.62$24,708
Oct 201207,73489.383.40$26,293
Sep 20121747,71894.672.92$38,997
Aug 201207,56392.662.91$21,994
Jul 201207,29385.133.02$22,031
Jun 201207,18879.822.52$18,107
May 20121859,39891.612.49$40,333
Apr 201209,807101.652.00$19,583
Mar 201218410,033105.052.22$41,623
Feb 201209,885101.102.57$25,407
Jan 201219111,20498.092.73$49,368
Dec 2011011,69596.873.24$37,889
Nov 201117611,01095.723.31$53,304
Oct 2011010,81784.983.65$39,466
Sep 201107,41383.623.99$29,547
Aug 201101,23083.404.15$5,104
Jul 20110094.144.52$0
Jun 201118010,83392.904.64$66,986
May 201119012,47298.134.40$73,582
Apr 201118713,895105.964.33$80,025
Mar 201118816,95696.364.06$86,912
Feb 201134420,26185.644.18$114,151
Jan 201137032,27386.504.59$180,099
Dec 201018435,72185.734.35$171,080
Nov 201038027,55980.843.80$135,315
Oct 201056935,76178.103.51$169,920
Sep 201036837,25372.633.98$174,975
Aug 201088653,39973.684.42$301,270
Jul 20101,14059,90072.554.74$366,423
Jun 201076154,60670.364.91$321,681
May 20101,14661,38671.124.24$341,487
Apr 201094656,38381.694.12$309,728
Mar 201075357,60078.394.39$311,815
Feb 201095551,05073.585.44$348,101
Jan 201056049,24574.365.96$335,343
Dec 200976039,66771.445.48$271,818
Nov 200976339,76374.593.75$206,083
Oct 200975541,91872.544.11$227,061
Sep 200975743,49265.543.06$182,906
Aug 200974848,92567.423.22$207,895
Jul 200975042,64361.133.46$193,584
Jun 200955442,04166.163.90$200,402
May 200956528,02554.743.93$140,947
Apr 200995045,60446.773.59$208,036
Mar 2009025,25942.144.06$102,526
Feb 20090032.814.63$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Mar 2014 — as filed, then multipliedworked
Condensate           108 bbl  × $ 95.89 =    $10,356
Gas                    0 Mcf  × $  5.06 =         $0

────────────────────────────────────────────────────
Month total                                  $10,356

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 02/G/252628 is the state's own key, not one this site invented.