LONG

Operated by ENCO EXPLORATION COMPANY (P-5 251883) in the FRED LONG (HOCKLEY 3850) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 261008District 02Field 32811300CondensateGasSaveExport
Value, all time
$101 k
Mar 2011 – Dec 2017
Value, last 12 filed months
$1 k
at the published price for each month
Months reported
82
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 26 leases and 32 wells, and the rule below applies to all of them.

Discovered
1987-09-06
as the register files it
Field class
Oil and gas
the register's own label
Between wells
no field rule filed
From a lease line
no field rule filed

The Commission's schedule remark for this field reads: AOF-1 AND AOF-2 EFFECTIVE 03/01/99.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition90 bbl$8,365
GasProduction22,397 Mcf$92,438
Total$100,803

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 28.4019, -97.8813. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

28.40194, -97.88127 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
4,312 ft
1 wells filed one
Completion to plug
6.8 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 4,312 ft.

Completions filed
Mar 2011
1 of 1 wells
Plug dates filed
Dec 2017
1 of 1 wells

Last completion to plug: a median of 6.8 years across the 1 well that filed both dates, with the middle half between 6.8 years and 6.8 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-02533697154,312 ftMar 2011Dec 2017Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (82)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

82 months

Dec 20170057.272.92$0
Nov 201702155.423.12$65
Oct 201702149.292.98$63
Sep 201702147.523.09$65
Aug 201702145.373.00$63
Jul 201702143.873.09$65
Jun 201703642.493.09$111
May 201703845.373.26$124
Apr 201703647.933.21$116
Mar 201703846.772.98$113
Feb 201703450.452.95$100
Jan 201703849.413.42$130
Dec 201603848.763.72$141
Nov 201603642.492.64$95
Oct 201603846.193.09$117
Sep 201603641.553.10$112
Aug 201603841.442.92$111
Jul 201603841.622.92$111
Jun 201603645.352.69$97
May 201603842.521.99$76
Apr 201603636.561.99$72
Mar 201603833.011.79$68
Feb 201603526.472.06$72
Jan 201603827.352.36$90
Dec 201503832.362.00$76
Nov 201503638.792.17$78
Oct 201503843.552.43$92
Sep 201503642.992.76$99
Aug 201503840.162.87$109
Jul 201503848.152.95$112
Jun 201503856.152.88$110
May 201503855.212.96$112
Apr 201503649.822.71$97
Mar 201503942.892.93$114
Feb 201503444.662.98$101
Jan 201503843.433.10$118
Dec 201403854.693.59$136
Nov 201403670.464.25$153
Oct 201403878.303.90$148
Sep 201403586.164.05$142
Aug 201403889.394.04$153
Jul 201403896.564.18$159
Jun 201403698.164.74$171
May 201403894.734.73$180
Apr 201403695.944.81$173
Mar 201403495.895.06$172
Feb 2014010397.406.19$638
Jan 2014010190.404.86$491
Dec 20130091.824.35$0
Nov 20130088.853.74$0
Oct 20130097.423.78$0
Sep 201300104.113.72$0
Aug 201300104.253.52$0
Jul 201300102.523.72$0
Jun 20130094.403.93$0
May 201309394.834.15$386
Apr 201309593.964.28$407
Mar 201309593.623.91$372
Feb 2013011391.233.42$386
Jan 2013010091.603.42$342
Dec 2012010186.773.42$345
Nov 201209786.953.62$352
Oct 201209789.383.40$330
Sep 201209794.672.92$283
Aug 201209792.662.91$282
Jul 201209785.133.02$293
Jun 201205579.822.52$139
May 201205991.612.49$147
Apr 201200101.652.00$0
Mar 201200105.052.22$0
Feb 201200101.102.57$0
Jan 20120098.092.73$0
Dec 20110096.873.24$0
Nov 2011029195.723.31$964
Oct 2011019084.983.65$693
Sep 201109083.623.99$359
Aug 2011101183.404.15$880
Jul 20118086194.144.52$11,421
Jun 201101,12392.904.64$5,211
May 201102,93798.134.40$12,937
Apr 201106,258105.964.33$27,118
Mar 201107,65296.364.06$31,047

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Nov 2017 — as filed, then multipliedworked
Condensate             0 bbl  × $ 55.42 =         $0
Gas                   21 Mcf  × $  3.12 =        $65

────────────────────────────────────────────────────
Month total                                      $65

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 02/G/261008 is the state's own key, not one this site invented.