BUTLER, B. C. ET AL

Operated by SURE FLOW OIL & GAS, INC. (P-5 830587) in the MCCASKILL (WILCOX M-7) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 54177District 02Field 58932625CondensateGasSaveExport
Value, all time
$380 k
Jan 1993 – Apr 2007
Value, last 12 filed months
$0
at the published price for each month
Months reported
172
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 6 leases and 6 wells, and the rule below applies to all of them.

Discovered
1971-09-15
as the register files it
Field class
Gas
the register's own label
Between wells
2,640 ft
minimum
From a lease line
1,320 ft
minimum

A drilling unit in this field needs at least 320 acres.

The Commission's schedule remark for this field reads: RESCINDED CASING & MULTI-STAGE CEMENTING RULES 1-13-86.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition3,492 bbl$68,928
GasProduction265,075 Mcf$310,958
Total$379,886

140,857 Mcf of this lease's gas, across 47 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 28.7816, -97.6336. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

28.78163, -97.63358 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
9,723 ft
1 wells filed one
Completion to plug
34.4 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 9,723 ft.

Completions filed
Nov 1972
1 of 1 wells
Plug dates filed
Apr 2007
1 of 1 wells

Last completion to plug: a median of 34.4 years across the 1 well that filed both dates, with the middle half between 34.4 years and 34.4 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-255301704 M9,723 ftNov 1972Apr 2007Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (172)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

172 months

Apr 20070059.617.81$0
Mar 20070056.927.30$0
Feb 20070055.108.22$0
Jan 20070050.306.73$0
Dec 20060056.656.92$0
Nov 20060054.207.62$0
Oct 20060054.906.01$0
Sep 20060060.085.04$0
Aug 20060068.717.34$0
Jul 20060069.376.34$0
Jun 20060066.286.38$0
May 20060066.016.42$0
Apr 20060064.397.36$0
Mar 20060056.707.08$0
Feb 20060057.597.75$0
Jan 20060060.598.93$0
Dec 20050054.9413.42$0
Nov 20050054.6910.59$0
Oct 20050058.3413.80$0
Sep 20050061.4512.08$0
Aug 20050061.519.80$0
Jul 20050055.697.84$0
Jun 20050052.337.38$0
May 20050045.226.65$0
Apr 20050049.207.36$0
Mar 20050050.377.15$0
Feb 20050045.226.31$0
Jan 20050043.166.32$0
Dec 20040039.866.75$0
Nov 20040045.286.33$0
Oct 20040049.706.52$0
Sep 20040043.245.28$0
Aug 20040042.375.55$0
Jul 20040038.286.08$0
Jun 20040036.106.43$0
May 20040037.486.49$0
Apr 20040034.475.86$0
Mar 20040034.365.53$0
Feb 20040032.455.51$0
Jan 20040032.036.30$0
Dec 20030030.266.30$0
Nov 20030028.804.60$0
Oct 20030028.174.76$0
Sep 20030026.314.75$0
Aug 20030029.765.13$0
Jul 20030029.415.17$0
Jun 20030028.565.98$0
May 20030026.595.97$0
Apr 20030026.675.41$0
Mar 20030031.146.10$0
Feb 20030033.487.93$0
Jan 20030030.315.58$0
Dec 20020026.914.85$0
Nov 20020024.664.14$0
Oct 20020026.464.23$0
Sep 20020027.443.64$0
Aug 20020025.963.16$0
Jul 20020024.583.06$0
Jun 20020023.733.34$0
May 20020024.663.58$0
Apr 20020023.653.51$0
Mar 20020022.003.10$0
Feb 20020018.222.38$0
Jan 20020017.172.38$0
Dec 20010016.932.36$0
Nov 20010018.072.41$0
Oct 20010019.782.53$0
Sep 20010024.262.25$0
Aug 20010024.873.05$0
Jul 2001184123.933.20$562
Jun 20010024.563.82$0
May 200103825.524.31$164
Apr 200103624.685.34$192
Mar 200103124.545.38$167
Feb 200109327.755.77$536
Jan 2001010227.478.40$857
Dec 2000011226.889.12$1,022
Nov 2000010932.215.66$617
Oct 2000012231.235.15$628
Sep 2000016331.875.19$845
Aug 2000033029.644.54$1,498
Jul 2000039828.534.09$1,628
Jun 2000046029.304.40$2,023
May 2000050527.263.68$1,858
Apr 2000080224.513.12$2,499
Mar 2000071928.422.86$2,056
Feb 2000066327.622.73$1,808
Jan 2000079125.272.48$1,962
Dec 1999091224.282.42$2,210
Nov 1999099023.192.43$2,410
Oct 199901,01120.982.80$2,835
Sep 1999099421.752.62$2,603
Aug 19991051,02319.262.88$4,964
Jul 1999086417.892.37$2,050
Jun 1999092215.942.36$2,178
May 1999095315.792.32$2,212
Apr 1999087415.102.21$1,930
Mar 199901,14312.471.84$2,101
Feb 199908639.981.82$1,569
Jan 1999090210.381.90$1,714
Dec 199809309.201.77$1,649
Nov 199801,07010.892.19$2,339
Oct 199801,23612.421.97$2,434
Sep 1998801,82012.592.08$4,798
Aug 199801,83411.301.91$3,498
Jul 1998060411.742.24$1,351
Jun 1998054111.242.24$1,210
May 19980012.622.21$0
Apr 1998049313.042.51$1,235
Mar 1998050712.802.31$1,171
Feb 1998046313.952.30$1,065
Jan 1998050314.702.15$1,084
Dec 199702,28816.322.41$5,517
Nov 199702,26718.193.09$7,001
Oct 199701,32419.253.15$4,170
Sep 199703,90117.742.95$11,527
Aug 199702,47517.862.55$6,323
Jul 1997863,82717.582.25$10,111
Jun 199705,94617.242.26$13,421
May 1997418,16318.972.31$19,622
Apr 19977012,94617.882.08$28,215
Mar 199727517,31218.951.94$38,782
Feb 199727517,48120.492.21$44,196
Jan 199746419,32123.483.54$79,285
Dec 199653117,63023.32$12,383
Nov 199646517,41021.97$10,216
Oct 1996202,67023.31$466
Sep 19960022.22$0
Aug 199601,50720.26$0
Jul 1996161,55219.55$313
Jun 199601,50318.73$0
May 1996101,51719.43$194
Apr 199601,51221.51$0
Mar 1996101,52019.38$194
Feb 1996121,57316.98$204
Jan 199651,42717.07$85
Dec 1995101,42317.19$172
Nov 1995101,40716.00$160
Oct 1995101,73315.43$154
Sep 1995101,72716.18$162
Aug 1995151,79515.92$239
Jul 1995101,76315.24$152
Jun 19951010216.41$164
May 1995016517.56$0
Apr 1995016217.73$0
Mar 1995016916.44$0
Feb 1995515016.58$83
Jan 19951015815.92$159
Dec 1994015315.03$0
Nov 1994012215.90$0
Oct 1994012515.58$0
Sep 1994010715.29$0
Aug 19941328216.13$210
Jul 1994330717.56$53
Jun 1994045517.09$0
May 1994674515.88$95
Apr 19941183,26214.14$1,669
Mar 1994505,97212.46$623
Feb 199403,09212.50$0
Jan 1994713,57612.66$899
Dec 199303,51112.33$0
Nov 1993503,59814.49$725
Oct 1993505,13715.85$793
Sep 19934711,00315.03$706
Aug 1993105,10715.66$157
Jul 1993223,21115.46$340
Jun 1993394,71916.79$655
May 1993776,02117.68$1,361
Apr 1993805,48718.05$1,444
Mar 1993715,30718.14$1,288
Feb 1993823,97217.90$1,468
Jan 19931305,01116.93$2,201

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Jul 2001 — as filed, then multipliedworked
Condensate            18 bbl  × $ 23.93 =       $431
Gas                   41 Mcf  × $  3.20 =       $131

────────────────────────────────────────────────────
Month total                                     $562

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 02/G/54177 is the state's own key, not one this site invented.